Less Ads, More Data, More Tools Register for FREE

Pin to quick picksVOG.L Regulatory News (VOG)

  • There is currently no data for VOG

Logbaba Power Station Online & Production Increase

23 Apr 2015 07:00

RNS Number : 0535L
Victoria Oil & Gas PLC
23 April 2015
 

 

RNS Number:

Victoria Oil & Gas PLC (AIM:VOG)

23 April 2015

 

Victoria Oil & Gas Plc

("VOG" or "the Company")

ENEO's Logbaba Power Station Online and Production Increase

 

Highlights

· Logbaba online and delivering 30MW to grid

· Bassa and Logbaba now delivering a total of 50MW to grid

· Average daily gas production since 50MW online is 14.5mmscf/d

 

Victoria Oil & Gas Plc announces that its 100% owned subsidiary, Gaz du Cameroun S.A. ("GDC"), has commenced supply of gas to the Logbaba power station following successful installation of all gas fired electricity generators by Altaaqa Global ("Altaaqa"). 30MW of power is now being generated at Logbaba as per the contract with ENEO Cameroun S.A. ("ENEO") announced on 29 December 2014.

 

The supply from Logbaba, coupled with the previously announced 20MW to Bassa power station, meets the 50 MW target and GDC's responsibilities to deliver gas to both stations has now been met. This triggers take or pay conditions in the contract with ENEO. The total project was delivered in less than four months since the contract was signed.

 

Average gas production since the 50MW has been online is 14.5mmscf/d with a daily peak of 15.3mmscf/d.

 

Kevin Foo, Executive Chairman, said: "From contract signing to delivery of 50MW to the grid in less than four months is an outstanding example of how the project partners ENEO, Altaaqa and GDC have made this happen. Average production levels have risen to 14.5mmscf/d, three times higher than levels at the end of 2014, which underlines this transformational agreement for VOG and give us confidence GDC can meet its average production target of 10.4mmscf/d for calendar year 2015." 

 

 

For further information, please visit www.victoriaoilandgas.com or contact: 

Victoria Oil & Gas Plc

Kevin Foo / Laurence Read Tel: +44 (0) 20 7921 8820

 

Numis Securities

John Prior / Ben Stoop Tel: +44 (0) 207 260 1000 

 

Strand Hanson Limited

Angela Hallett / Stuart Faulkner Tel: +44 (0) 20 7409 3494

 

Tavistock Communications

Jos Simson / Edward Portman/ Nuala Gallagher Tel: +44 (0) 20 7920 3150

 

Notes to Editors

 

About Victoria Oil & Gas Plc

Victoria Oil & Gas (VOG.L) is a gas utility company with operations in the industrial port city of Douala in Cameroon, which is the business hub to Central Africa.

 

The Company's subsidiary, Gaz du Cameroun S.A. ("GDC"), supplies cost effective, clean and reliable gas to industries in the Douala region from its onshore Logbaba Gas Project. Industrial customers are primarily supplied with gas through a 31.3km pipeline network built by GDC in Douala. GDC products currently include thermal gas, gas condensate and gas for electricity generation. GDC gas is attractive to customers due to its reliability, price competitiveness, low hydrocarbon emissions (compared to Heavy Fuel Oil) and adaptability to meet varied power requirement needs.

 

The Company generates cash flow from the Logbaba Project which is 60% owned and managed by GDC, with RSM Production Corporation, an affiliate of Grynberg Petroleum Company of Denver, Colorado holding a 40% participating interest.

 

VOG also holds 100% of the West Medvezhye oil and gas exploration project near Nadym, Russia. The field has C1 plus C2 reserves of 14.4mmboe (under the Russian resource classification system, analogous to proven and probable reserves under Western conventions) in addition to best estimate prospective resources of 1.4bboe.

 

Cameroon Energy Market

Cameroon is a stable African country that is host to a developing economy serving most of Central Africa with goods and services. A power deficit remains a major hindrance to Cameroon's economic expansion. The power grid is reliant on hydroelectric dams to supply 75% of power and the shortfall is made up from heavy fuel oil and gas. Hydroelectric dams are highly seasonal, with stream rates significantly varying from 6,000m3 per second in the wet season to 50m3 per second in the dry season. As with many hydro electrical systems transmission loss is also a constant issue when balancing power loads across distances to different consuming regions. The port-city of Douala is the major industrial zone within Cameroon and it requires high levels of consistently delivered grid power all year round. Currently Cameroon's energy demand is growing at 7% annually and gas is seen as a key element to Cameroons national energy strategy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUUACUPAGQP
Date   Source Headline
16th Dec 20227:00 amRNSCancellation - Victoria Oil & Gas Plc
27th Oct 20225:30 pmRNSSuspended Companies Notice – Deletions
26th Oct 20227:00 amRNSUpdate on Settlement of The ICC Award to RSM
5th Oct 20229:15 amRNSOperational & Corporate Update
25th Jul 20227:30 amRNSAddendum to ICC Partial Final Award
22nd Jul 20227:00 amRNSQ2 2022 Operational & Corporate Update
30th Jun 20221:45 pmRNSResult of Annual General Meeting
30th Jun 20227:00 amRNSAnnual Report and Accounts & Trading Update
27th Jun 20227:00 amRNSChange of Registered Office
14th Jun 20229:45 amRNSHolding(s) in Company
14th Jun 20229:45 amRNSHolding(s) in Company
31st May 20226:00 pmRNSNotice of AGM
19th May 20227:00 amRNSQ1 2022 Operational & Corporate Update
4th Apr 20227:30 amRNSSuspension - Victoria Oil & Gas plc
4th Apr 20227:00 amRNSTemporary Suspension of Trading
2nd Mar 20227:00 amRNSLoan Note Issue
2nd Feb 20227:00 amRNSQ4 2021 Operational Update
18th Jan 20222:05 pmRNSSecond Price Monitoring Extn
18th Jan 20222:00 pmRNSPrice Monitoring Extension
7th Jan 20222:06 pmRNSSecond Price Monitoring Extn
7th Jan 20222:01 pmRNSPrice Monitoring Extension
7th Jan 202211:06 amRNSSecond Price Monitoring Extn
7th Jan 202211:00 amRNSPrice Monitoring Extension
23rd Dec 20217:00 amRNSMinisterial Approval on Matanda Licence Extension
16th Nov 20214:41 pmRNSSecond Price Monitoring Extn
16th Nov 20214:36 pmRNSPrice Monitoring Extension
16th Nov 20212:05 pmRNSSecond Price Monitoring Extn
16th Nov 20212:00 pmRNSPrice Monitoring Extension
16th Nov 202111:05 amRNSSecond Price Monitoring Extn
16th Nov 202111:00 amRNSPrice Monitoring Extension
16th Nov 20217:00 amRNSUpdate to Logbaba well La-108
1st Nov 20218:42 amRNSReplacement: Interim Results
1st Nov 20217:00 amRNSAnnual Financial Report
1st Oct 202112:00 pmRNSConvertible Loan Note Draw Down
29th Sep 20217:00 amRNSUNCITRAL Arbitration Update
23rd Sep 20212:15 pmRNSInterim Results Extension
10th Sep 20213:22 pmRNSResult of General Meeting
26th Aug 20217:00 amRNSPublication of Circular and Notice of GM
12th Aug 202112:28 pmRNSResult of General Meeting (“GM”)
4th Aug 20217:00 amRNSQ2 2021 Operational Update
16th Jul 20211:02 pmRNSGrant of Options, Issue of Shares and TVR
16th Jul 20217:00 amRNSNotice of General Meeting to receive Annual Report
13th Jul 20212:06 pmRNSSecond Price Monitoring Extn
13th Jul 20212:00 pmRNSPrice Monitoring Extension
13th Jul 202111:05 amRNSSecond Price Monitoring Extn
13th Jul 202111:00 amRNSPrice Monitoring Extension
13th Jul 20217:00 amRNSAudited Results for the year ended 31 Dec 2020
30th Jun 20211:38 pmRNSResult of Annual General Meeting
30th Jun 20217:20 amRNSAnnual Report and Accounts & Trading update
24th Jun 202111:13 amRNSAnnual General Meeting 2021 Update on Arrangements

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.