The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0275
Bid: 0.025
Ask: 0.03
Change: 0.00 (0.00%)
Spread: 0.005 (20.00%)
Open: 0.0275
High: 0.0275
Low: 0.0275
Prev. Close: 0.0275
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kimmeridge Oil Production Continues at HH-1

16 Jan 2019 07:00

RNS Number : 1919N
UK Oil & Gas PLC
16 January 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Kimmeridge Oil Production Continues at Horse Hill-1 ("HH-1")

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that Horse Hill Developments Ltd ("HHDL"), a UKOG subsidiary company and the operator of the Horse Hill oil field, has informed the Company that sustained production continues to be maintained from the HH-1 extended well test ("EWT") programme, achieving a gross aggregate total of over 25,000 barrels ("bbl") to date, a significant production milestone. Of the aggregate total, over 21,000 bbl has been produced to date from the Kimmeridge Limestone ("KL") oil pool, more than doubling November's reported Kimmeridge production total. No formation water has been returned to surface during the entire EWT. Dry oil and solution gas production continues from HH-1.

 

Based on the continued Kimmeridge EWT success and October's announcement of Portland commercial viability, HHDL plans to continue HH-1 EWT production until the expiry of current permits in spring 2019 and then to move directly into the drilling and long term testing of two new horizontal wells, HH-2 and HH-1z, for which UKOG's internal funding, planning consent and environmental permits are in place. HH-1 is located in licence PEDL137 in which UKOG holds a 46.735% beneficial interest.

 

Key EWT results to date are summarised below:

 

Horse Hill 2018-19 EWT Oil Production Milestones:

 

· Over 25,000 bbl total aggregate Kimmeridge and Portland oil production since early July.

· Over 21,000 bbl total Kimmeridge oil production since mid-October.

· 114 tankers of crude successfully exported to Perenco's Hamble oil terminal. The KL's 40° API Brent quality crude continues to be sold at prevailing Brent crude oil prices, less a small deduction for handling and marketing.

 

KL EWT Update:

 

· KL4 production from a 103 ft perforated interval commenced during late November, yielding 2,192 bbl at a maximum half-hourly metered rate of 584 barrels of oil per day ("bopd") and at an average sustained daily continuous rate of 300 bopd over the subsequent week.

· Fluid and pressure build up data gathered from the KL4 test demonstrate that the KL3 and KL4 are one single oil pool of 358 ft vertical extent. As a result, and as previously indicated, a decision was made to commingle both KL3 and KL4 production (i.e. produce from both sets of perforations at the same time).

· Commingled KL3 and KL4 production from an aggregate 187 ft perforated interval commenced on 4th December at a maximum half-hourly rate of 426 bopd and continued throughout the Christmas and New Year period, producing 8,829 bbl of 40° API crude. The programme included several pressure build-up tests and testing of different pump configurations, settings and equipment.

· Following the installation of a new downhole pump and an optimised surface hydraulic pump unit, stable commingled production resumed on 7th January at an increased initial rate of 525 bopd. The sustained daily rate over the subsequent week averaged 303 bopd. A de-waxing treatment applied on 14th January led to an increase in hourly rate to 351 bopd. Commingled production continues.

· To date, the absence of produced formation water adds continuing support to the Company's geological concept that KL oil lies within a significant continuous oil deposit.

· Planning and environmental permit applications for permanent oil production via a 7-well development were submitted to Surrey County Council and the Environment Agency on 7th December and 10th January, respectively. It is anticipated that all necessary permits should be in place by Autumn 2019, enabling a transition from EWT production into permanent production during winter 2019.

 

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The continued EWT success supports the Company's plans to establish permanent production at Horse Hill in 2019. UKOG aims to deliver near-continuous oil production throughout 2019 via a combination of long term testing of HH-1 and two new wells, followed by a smooth transition into permanent production in the winter. The potentially transformative effect of a successful programme is an exciting prospect for 2019."

Qualified Person's Statement

 

Rob Wallace, UKOG's principal technical advisor, who has over 40 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Wallace is a Chartered Scientist, Chartered Geologist and Fellow of the Geological Society of London, an active member of the American Association of Petroleum Geologists, a member of the Petroleum Exploration Society of Great Britain and a member of the South African Geophysical Society.

 

For further information, please contact:

 

UKOG

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander / David Bick Tel: 01483 900582

 

Glossary

 

°API

a measure of the density of crude oil, as defined by the American Petroleum Institute

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface.

extended well test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG's Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge 3

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1 & 1z oil discovery, planning application approved

Holmwood 3

PEDL143

40%

UKOG

Europa Oil & Gas (Holdings) plc

91.8

Seeking alternate sites to drill Holmwood and other Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

46.735%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, two further appraisal wells scheduled for 2019

Horse Hill 5

PEDL246

46.735%

Horse Hill Developments Ltd

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

 

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1 /1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery plus further undrilled Kimmeridge exploration prospects.

5. Oil field with three productive and commercially viable zones, EWT ongoing, two further wells HH-1z and HH-2 scheduled Q2 2019, development underway subject to grant of planning consent, expected Q3 2019.

6. UKOG has a direct 71.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLUVSWRKRAAAAR
Date   Source Headline
27th Jun 20227:00 amRNSDirector/PDMR Shareholding
8th Jun 20222:05 pmRNSSecond Price Monitoring Extn
8th Jun 20222:00 pmRNSPrice Monitoring Extension
7th Jun 20224:41 pmRNSSecond Price Monitoring Extn
7th Jun 20224:35 pmRNSPrice Monitoring Extension
7th Jun 20224:21 pmRNSSuccessful Loxley Planning Appeal Outcome
1st Jun 20227:00 amRNSNotice of AGM
30th May 20227:00 amRNSFuture hydrogen-ready energy storage project
23rd May 20227:00 amRNSDirector/PDMR Shareholding
20th May 20227:00 amRNSBB-1z discovery granted 2-year planning extension
16th May 20227:00 amRNSNSTA HH-2z recompletion consent
13th May 20227:00 amRNSOne-year work programme on PEDL137 Horse Hill
5th May 202211:05 amRNSSecond Price Monitoring Extn
5th May 202211:00 amRNSPrice Monitoring Extension
5th May 20229:05 amRNSSecond Price Monitoring Extn
5th May 20229:00 amRNSPrice Monitoring Extension
5th May 20227:00 amRNSEnvironment Agency grants full Horse Hill Permit
25th Apr 20227:00 amRNSDirector Share Purchase
20th Apr 20227:00 amRNSTurkey: Basur-Resan seismic processing completed
25th Mar 20227:00 amRNSAnnual Review and Accounts for YE 30 Sep 2021
18th Mar 20224:02 pmRNSDirector/PDMR Shareholding
11th Mar 20227:00 amRNSLoxley Appeal Decision Update
8th Mar 20224:40 pmRNSSecond Price Monitoring Extn
8th Mar 20224:35 pmRNSPrice Monitoring Extension
8th Mar 202211:00 amRNSPrice Monitoring Extension
24th Feb 20222:06 pmRNSSecond Price Monitoring Extn
24th Feb 20222:00 pmRNSPrice Monitoring Extension
21st Feb 202211:00 amRNSPrice Monitoring Extension
21st Feb 20227:00 amRNSDirector/PDMR Shareholding
18th Feb 202211:06 amRNSSecond Price Monitoring Extn
18th Feb 202211:00 amRNSPrice Monitoring Extension
18th Feb 20229:00 amRNSPrice Monitoring Extension
18th Feb 20227:00 amRNSHorse Hill consent upheld by Court of Appeal
17th Feb 20224:41 pmRNSSecond Price Monitoring Extn
17th Feb 20224:36 pmRNSPrice Monitoring Extension
7th Feb 20227:00 amRNSTurkey: B-3S Casing Mobilisation
1st Feb 20227:00 amRNSTurkey: Phase 1 seismic acquisition completed
24th Jan 20227:00 amRNSDirector/PDMR Shareholding
6th Jan 20224:19 pmRNSLoxley planning appeal update
17th Dec 20217:00 amRNSDirector Share Purchase and Share Options issue
16th Dec 20217:00 amRNSGeothermal energy agreement with Ceraphi Energy
10th Dec 20217:00 amRNSTurkey: General operational update
24th Nov 20213:02 pmRNSBoard and Management Changes
20th Oct 20217:00 amRNSIsle of Wight Council reject Arreton application
12th Oct 20219:05 amRNSSecond Price Monitoring Extn
12th Oct 20219:00 amRNSPrice Monitoring Extension
11th Oct 20212:05 pmRNSSecond Price Monitoring Extn
11th Oct 20212:00 pmRNSPrice Monitoring Extension
20th Sep 20217:00 amRNSHorse Hill production facilities upgrade completed
2nd Aug 20219:06 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.