Adam Davidson, CEO of Trident Royalties, discusses offtake milestones and catalysts to boost FY24. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0265
Bid: 0.025
Ask: 0.028
Change: 0.001 (3.92%)
Spread: 0.003 (12.00%)
Open: 0.026
High: 0.0265
Low: 0.026
Prev. Close: 0.0255
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

HH-2/2z Drilling Commences ("Spud") at Horse Hill

30 Sep 2019 07:01

RNS Number : 0517O
UK Oil & Gas PLC
30 September 2019
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

HH-2/2z Drilling Commences ("Spud") at Horse Hill Oil Field

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that drilling operations for its new Horse Hill-2/2z ("HH-2/2z") Portland well commenced ("spudded") on Sunday morning, 29 September.

 

HH-2/2z, the first of two new horizontal wells in the field's Portland oil pool, is designed to be retained as a future production well, capable of delivering flow rates significantly higher than the previously reported 362 barrels of oil per day ("bopd") from the HH-1 vertical Portland discovery well. Following a planned extensive HH-2z production flow-testing campaign, both HH-2z Portland and the HH-1 Kimmeridge well are expected to be put into long term production by the end of 2019.

 

UKOG holds a controlling 85.635% interest in the Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences, which are operated by UKOG's subsidiary company, Horse Hill Developments Ltd.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"The spud of HH-2/2z is another UKOG landmark milestone and a key enabler towards establishing long term oil production at Horse Hill. We are confident that the meticulously planned HH-2/2z operation, the first of two planned horizontal wells in the Portland oil pool, leaves little to chance. We look forward to a safe and successful drilling campaign and to the realistic prospect of HH-2/2z delivering a significant increase in UKOG's net oil production and associated revenues before the end of 2019."

 

Forward Drilling Plans:

 

The HH-2 pilot, designed to acquire key geological data to ensure the horizontal is correctly positioned within the Portland reservoir, will drill ahead in 12¼" diameter hole down to around 2,000 ft below surface and will then be cased back to surface. Drilling of 8½" diameter hole and conventional coring over the full vertical extent of the Portland oil pool will then follow.

 

Upon reaching a total depth of approximately 3,000 ft, HH-2 will be electric logged and then plugged back in preparation for the immediate start of HH-2z. The planned HH-2z trajectory, of total length of approximately 5,800 ft from surface, will contain a horizontal section of approximately 3,200 ft wholly within the Portland reservoir's most oil-productive zone.

 

HH-1 Kimmeridge Flow Test Update:

 

Following last Monday's shut-in, necessary to ensure safe rig assembly, test production from the HH-1 Kimmeridge oil pool was restarted on Saturday at initial half hourly rates of between 302-473 bopd. Kimmeridge test production is planned to continue throughout the drilling campaign.

 

Further drilling and testing updates will be issued in due course.

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 900582

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 0207 397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 900582

 

Glossary

 

 

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton-3 oil appraisal well and Arreton South exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge Oil field with productive and commercially viable zones, EWT ongoing, production planning consent granted in September 2019, appraisal/development drilling campaign underway. Long term production start expected late 2019.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFKLLLKKFXBBE
Date   Source Headline
27th Jun 20227:00 amRNSDirector/PDMR Shareholding
8th Jun 20222:05 pmRNSSecond Price Monitoring Extn
8th Jun 20222:00 pmRNSPrice Monitoring Extension
7th Jun 20224:41 pmRNSSecond Price Monitoring Extn
7th Jun 20224:35 pmRNSPrice Monitoring Extension
7th Jun 20224:21 pmRNSSuccessful Loxley Planning Appeal Outcome
1st Jun 20227:00 amRNSNotice of AGM
30th May 20227:00 amRNSFuture hydrogen-ready energy storage project
23rd May 20227:00 amRNSDirector/PDMR Shareholding
20th May 20227:00 amRNSBB-1z discovery granted 2-year planning extension
16th May 20227:00 amRNSNSTA HH-2z recompletion consent
13th May 20227:00 amRNSOne-year work programme on PEDL137 Horse Hill
5th May 202211:05 amRNSSecond Price Monitoring Extn
5th May 202211:00 amRNSPrice Monitoring Extension
5th May 20229:05 amRNSSecond Price Monitoring Extn
5th May 20229:00 amRNSPrice Monitoring Extension
5th May 20227:00 amRNSEnvironment Agency grants full Horse Hill Permit
25th Apr 20227:00 amRNSDirector Share Purchase
20th Apr 20227:00 amRNSTurkey: Basur-Resan seismic processing completed
25th Mar 20227:00 amRNSAnnual Review and Accounts for YE 30 Sep 2021
18th Mar 20224:02 pmRNSDirector/PDMR Shareholding
11th Mar 20227:00 amRNSLoxley Appeal Decision Update
8th Mar 20224:40 pmRNSSecond Price Monitoring Extn
8th Mar 20224:35 pmRNSPrice Monitoring Extension
8th Mar 202211:00 amRNSPrice Monitoring Extension
24th Feb 20222:06 pmRNSSecond Price Monitoring Extn
24th Feb 20222:00 pmRNSPrice Monitoring Extension
21st Feb 202211:00 amRNSPrice Monitoring Extension
21st Feb 20227:00 amRNSDirector/PDMR Shareholding
18th Feb 202211:06 amRNSSecond Price Monitoring Extn
18th Feb 202211:00 amRNSPrice Monitoring Extension
18th Feb 20229:00 amRNSPrice Monitoring Extension
18th Feb 20227:00 amRNSHorse Hill consent upheld by Court of Appeal
17th Feb 20224:41 pmRNSSecond Price Monitoring Extn
17th Feb 20224:36 pmRNSPrice Monitoring Extension
7th Feb 20227:00 amRNSTurkey: B-3S Casing Mobilisation
1st Feb 20227:00 amRNSTurkey: Phase 1 seismic acquisition completed
24th Jan 20227:00 amRNSDirector/PDMR Shareholding
6th Jan 20224:19 pmRNSLoxley planning appeal update
17th Dec 20217:00 amRNSDirector Share Purchase and Share Options issue
16th Dec 20217:00 amRNSGeothermal energy agreement with Ceraphi Energy
10th Dec 20217:00 amRNSTurkey: General operational update
24th Nov 20213:02 pmRNSBoard and Management Changes
20th Oct 20217:00 amRNSIsle of Wight Council reject Arreton application
12th Oct 20219:05 amRNSSecond Price Monitoring Extn
12th Oct 20219:00 amRNSPrice Monitoring Extension
11th Oct 20212:05 pmRNSSecond Price Monitoring Extn
11th Oct 20212:00 pmRNSPrice Monitoring Extension
20th Sep 20217:00 amRNSHorse Hill production facilities upgrade completed
2nd Aug 20219:06 amRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.