Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0255
Bid: 0.024
Ask: 0.027
Change: 0.0015 (6.25%)
Spread: 0.003 (12.50%)
Open: 0.024
High: 0.0255
Low: 0.0225
Prev. Close: 0.024
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Dry Oil Flows to Surface- Water Shut-Off Programme

9 Mar 2020 10:00

RNS Number : 4190F
UK Oil & Gas PLC
09 March 2020
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Dry Oil Flows to Surface Following Successful Horse Hill-2z Water Shut-Off Programme

 

 

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that the intervention to shut off significant formation water ingress into its Horse Hill-2z ("HH-2z") horizontal production well has been successful.

 

Following the identification of the water ingress source via production logging, a rigid setting Thermatek® plug was set over a zone of open natural fractures clustered at the deepest part or "toe" of the wellbore. Initial testing of HH-2z post-Thermatek® has demonstrated a continuous flow of dry oil to surface, confirming that the plug has eliminated underlying formation water ingress into HH-2z.

 

Dry oil flow rates during the initial 48-hour "clean-up" period to date are encouraging, with metered daily rates averaging 223 barrels of oil per day ("bopd"). However, as is to be expected in the early clean-up stage of such a horizontal wellbore, both oil and associated gas rates have been very variable. Half hourly rates have thus ranged from a high of 778 bopd to a low of around 10 bopd during intermittent short periods of "slugging" (i.e. the return of discrete pockets of gas and/or completion fluids).

 

The water ingress problem meant that HH-2z remained shut-in for almost 3 months, with spent drilling and completion fluids within the near wellbore. Consequently, it is expected that the full clean-up process is likely to take a number of weeks of aggregate flow. As part of the clean-up process, to ensure the full remaining horizontal section contributes towards aggregate oil flow, further interventions are planned to help fine-tune and optimise flow from the well.

 

HH-2z clean-up operations are planned to continue over the coming week, after which essential maintenance and a planned upgrade of well test and production facilities will occur. These operations, designed primarily to enable simultaneous production from HH-1 and HH-2z, will require both HH-1 and HH-2z to be shut-in for a period of up to ten days.

 

Full extended well test operations with simultaneous multi-well production are planned to resume directly after the shut-in.

 

UKOG holds a controlling 85.635% interest in the Horse Hill oil field and surrounding highly prospective PEDL137 and PEDL246 licences, which are operated by UKOG's subsidiary company, Horse Hill Developments Ltd.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"Such water shut-off operations are routinely undertaken in production wells. However, success, particularly in horizontal wellbores and where water ingress is via open natural fractures, is by no means guaranteed. Consequently, this is an excellent result for the Company as it has enabled HH-2z to flow dry oil to surface at encouraging initial rates. Our operations team deserves tremendous credit for this successful outcome."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 941493

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 020 7397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 941493

 

Glossary

 

 

horizontal well

a well that during drilling is steered so as to follow and remain within a particular geological stratum or reservoir unit having a trajectory that runs approximately parallel to the top and or base of the target horizon

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface

Thermatek®

a Halliburton trademarked rigid setting fluid plug designed to isolate zones within a completed wellbore

well test

or flow test involves testing a well by flowing hydrocarbons to surface, typically through a test separator over a flowing period of up to 96 hours; key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate and volumes. An extended well test or EWT is a well test with duration of over 96 hours and up to 90 or 180 flowing days aimed at assessing longer term production viability and the connected oil in place seen by the well.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling completed

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton oil appraisal well and Godshill exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge Oil field with productive and commercially viable zones, EWT ongoing, production planning consent granted in September 2019, appraisal/development drilling campaign completed. Long term Production start expected Spring 2020.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLGCGDXRGGDGGC
Date   Source Headline
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed
30th Mar 20231:44 pmRNSHolding(s) in Company
28th Mar 20237:37 amRNSHorse Hill Farmout
23rd Mar 20237:00 amRNSHorndean Field Resource Report by D&M
13th Mar 202310:34 amRNSTurkey: Pinarova-1 Construction Commences
8th Mar 20239:13 amRNSHolding(s) in Company
6th Mar 20237:00 amRNSTurkey: Pinarova-1 drilling update
3rd Mar 20233:09 pmRNSLoxley update
1st Mar 20237:00 amRNSTurkey: Pinarova-1 well update
27th Feb 20237:00 amRNSHorse Hill Water Reinjection Update
21st Feb 202311:05 amRNSSecond Price Monitoring Extn
21st Feb 202311:00 amRNSPrice Monitoring Extension
21st Feb 20237:00 amRNSRPS Loxley Gas Discovery Report
10th Feb 202310:06 amRNSTurkey Earthquake
6th Feb 20237:00 amRNSPEDL234 Loxley gas discovery update
1st Feb 20237:00 amRNSPEDL234 Loxley gas discovery update
26th Jan 20237:00 amRNSMeeting with Energy Minister Rt Hon Graham Stuart
23rd Jan 20237:00 amRNSHolding(s) in Company
11th Jan 20237:00 amRNSTurkey: Operational Update & New Pinarova-1 well
19th Dec 202211:59 amRNSHolding(s) in Company
1st Dec 20229:06 amRNSDirector Share Purchase
24th Nov 20225:50 pmRNSHolding(s) in Company
23rd Nov 20222:05 pmRNSSecond Price Monitoring Extn
23rd Nov 20222:00 pmRNSPrice Monitoring Extension
8th Nov 20227:10 amRNSDirector Share Purchase
14th Oct 20227:09 amRNSHigh Court upholds Loxley planning consent
6th Oct 20227:00 amRNSDirector Share Purchase
16th Sep 20227:00 amRNSTurkey Phase 2 seismic completed
13th Sep 20226:16 pmRNSHolding(s) in Company
12th Sep 20229:05 amRNSSecond Price Monitoring Extn
12th Sep 20229:00 amRNSPrice Monitoring Extension
12th Sep 20227:00 amRNSSuccessful Placing and appointment of new CFO
8th Sep 20229:05 amRNSSecond Price Monitoring Extn
8th Sep 20229:00 amRNSPrice Monitoring Extension
6th Sep 20222:00 pmRNSPrice Monitoring Extension
5th Sep 20224:41 pmRNSSecond Price Monitoring Extn
5th Sep 20224:35 pmRNSPrice Monitoring Extension
30th Aug 202211:02 amRNSDirector/PDMR Shareholding
15th Aug 202211:59 amRNSHorse Hill Update
27th Jul 20224:41 pmRNSSecond Price Monitoring Extn
27th Jul 20224:35 pmRNSPrice Monitoring Extension
27th Jul 20222:00 pmRNSSuccessful Placing
25th Jul 20227:00 amRNSDirector/PDMR Shareholding
20th Jul 20227:00 amRNSOperational Update
30th Jun 20227:05 amRNSInterim Results
30th Jun 20227:00 amRNSTurkey operational update
28th Jun 20221:40 pmRNSResult of Annual General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.