Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0255
Bid: 0.024
Ask: 0.027
Change: 0.0015 (6.25%)
Spread: 0.003 (12.50%)
Open: 0.024
High: 0.0255
Low: 0.0225
Prev. Close: 0.024
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Arreton - Planning Application Submitted

23 Mar 2020 07:00

RNS Number : 1175H
UK Oil & Gas PLC
23 March 2020
 

UK Oil & Gas PLC

("UKOG" or the "Company")

 

Arreton oil discovery planning application submitted to Isle of Wight council

 

 

 

UK Oil & Gas PLC (London AIM: UKOG) is pleased to announce that it has filed a planning application ("Application") with the Isle of Wight Council for the appraisal drilling and flow testing of the Arreton oil discovery. Following a one-week statutory notice period, the application is expected to go "live" on 27 March 2020.

 

The Application details the planned construction, operation and eventual decommissioning of a well site for the appraisal of hydrocarbons via a deviated borehole (Arreton-3 or "A-3") plus a possible horizontal sidetrack off the "mother" borehole (Arreton-3z or "A-3z"), all to be undertaken within a temporary period of three years.

 

UKOG has spent considerable time and undertaken much research to minimise the potential noise and visual impact of the site, which will be largely screened from public view. The Company has chosen a site adjacent to land which already supports non-agricultural commercial uses. The land immediately to the east supports the Wight Farm Anaerobic Digestion Energy Power Station and to the west supports the Blackwater Quarry and ancillary operations connected to the working of aggregates.

 

As reported in the Company's July 2018 AIM admission document, the Arreton conventional oil discovery, a geological analogue of the Company's Horse Hill oil field (UKOG net 85.635%), contains three stacked Jurassic oil pools containing a third party (Xodus) calculated aggregate gross P50 oil in place of 127 million barrels ("mmbbl"). UKOG's net share of associated mid case recoverable Contingent Resource volumes were stated by Xodus to be a material 14.9 mmbbl.

 

The A-3 well is envisaged to duplicate or "twin" the A-1 and A-2 discovery wells drilled by BP and the Gas Council (now Spirit Energy) in 1952 and 1974, respectively. Should short term flow testing of A-3 indicate likely commercial viability, it is envisaged that an A-3z horizontal sidetrack would be drilled and put on extended well test to assess longer-term flow performance.

 

UKOG holds a 95% operated interest in Petroleum Exploration Development Licence 331, which extends over a 200 km² area covering most of the southern half of the Isle of Wight.

 

Stephen Sanderson, UKOG's Chief Executive, commented:

 

"Whilst UKOG's primary focus will remain on maintaining continued long-term stable and profitable oil production at Horse Hill, our efforts will also continue with those actions necessary to ensure that both the Arreton oil and Loxley gas appraisal projects move forwards as swiftly as the current UK situation permits."

 

Qualified Person's Statement

 

Matt Cartwright, UKOG's Commercial Director, who has over 36 years of relevant experience in the global oil industry, has approved the information contained in this announcement. Mr Cartwright is a Chartered Engineer and member of the Society of Petroleum Engineers.

 

For further information, please contact:

 

UK Oil & Gas PLC

Stephen Sanderson / Kiran Morzaria Tel: 01483 941493

 

WH Ireland Ltd (Nominated Adviser and Broker)

James Joyce / James Sinclair-Ford Tel: 020 7220 1666

 

Cenkos Securities PLC (Joint Broker)

Joe Nally / Neil McDonald Tel: 020 7397 8919

 

Novum Securities (Joint Broker)

John Bellis Tel: 020 7399 9400

 

Public Relations

Brian Alexander Tel: 01483 941493

 

Glossary

 

appraisal well

a borehole designed to determine the lateral and or vertical extent of a discovered hydrocarbon accumulation

Contingent Resource(s)

those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies. Contingent Resources are further categorized in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterized by their economic status

deviated well

a well whose bottom hole location does not directly underlie its surface location. Such wells are common as a surface location cannot always be directly located over the subsurface target zone.

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

extended well test

a well test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days per zone

 

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at commercial flow rates and overall volumes.

oil field

an accumulation, pool or group of pools of oil in the subsurface that produces oil to surface. An oil field consists of a reservoir in a shape that will trap hydrocarbons and that is covered by an impermeable or sealing rock

oil in place

the quantity of oil or petroleum that is estimated to exist in naturally occurring accumulations in the ground before any extraction to surface.

P50 or best estimate

a 50% probability that a stated volume will be equalled or exceeded

recoverable volumes or resources

those quantities of petroleum (i.e. oil in this case) estimated, as of a given date, to be potentially recoverable to surface from known accumulations

sidetrack

to re-enter an existing wellbore and to drill out of one side in order to reach a different bottom hole location or target. In the case of A-3 the near vertical deviated mother borehole will be used as a pilot hole and a horizontal sidetrack will be drilled out entirely within the oil-bearing reservoir with the aim of increasing overall exposure to reservoir rock and thus potentially increasing flow rates.

 

UKOG Licence Interests

 

The Company has interests in the following UK licences:

 

Asset

Licence

UKOG Interest

Licence Holder

Operator

Area (km2)

Status

Avington 1

PEDL070

5%

UKOG (GB) Limited

IGas Energy Plc

18.3

Field currently temporarily shut in

Broadford Bridge/Loxley/Godley Bridge 2, 3, 8

PEDL234

100%

UKOG (234) Ltd 4

UKOG (234) Ltd 4

300.0

BB-1/1z oil discovery, Loxley-1 gas appraisal well planning application submitted

A24 3

PEDL143

67.5%

UKOG

UKOG 7

91.8

Finalising new site selection to drill Portland and Kimmeridge prospects

Horndean 1

PL211

10%

UKOG (GB) Limited

IGas Energy Plc

27.3

Field in stable production

Horse Hill 5

PEDL137

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

99.3

Production tests ongoing, HH-2/2z drilling completed

Horse Hill 5

PEDL246

85.635%

Horse Hill Developments Ltd 

Horse Hill Developments Ltd 

43.6

As above

Isle of Wight (Onshore) 2, 3

PEDL331

95%

UKOG

UKOG

200.0

Preparing planning submission for Arreton oil appraisal well and Godshill exploration well

Markwells Wood

PEDL126

100%

UKOG (GB) Limited

UKOG (GB) Limited

11.2

MW-1 P&A

Notes:

 

1. Oil field currently in stable production.

2. Oil discovery pending development and/or appraisal drilling.

3. Exploration asset with drillable prospects and leads.

4. Contains the Broadford Bridge-1/1z Kimmeridge oil discovery, the eastern extension of the Godley Bridge Portland gas discovery, plus further undrilled Kimmeridge exploration prospects.

5. Portland and Kimmeridge oil field with productive and commercially viable zones, HH-1 in stable oil production, HH-2z EWT ongoing, production planning consent granted in September 2019, long term Production consent granted March 2020.

6. UKOG has a direct 77.9% interest in HHDL, which has a 65% interest in PEDL137 and PEDL246.

7. OGA consent received for the transfer of operatorship from Europa to UKOG

8. Gas discovery pending appraisal drilling and development with underlying Kimmeridge potential

 

The information contained within this announcement is deemed by the Company to constitute inside information under the Market Abuse Regulation (EU) No. 596/2014

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCBCGDXLXDDGGD
Date   Source Headline
9th Apr 20219:00 amRNSPrice Monitoring Extension
8th Apr 202111:05 amRNSSecond Price Monitoring Extn
8th Apr 202111:00 amRNSPrice Monitoring Extension
8th Apr 20219:05 amRNSSecond Price Monitoring Extn
8th Apr 20219:00 amRNSPrice Monitoring Extension
7th Apr 20214:41 pmRNSSecond Price Monitoring Extn
7th Apr 20214:36 pmRNSPrice Monitoring Extension
7th Apr 20217:00 amRNSFormal drilling consent for Basur-3 granted
6th Apr 20212:06 pmRNSSecond Price Monitoring Extn
6th Apr 20212:01 pmRNSPrice Monitoring Extension
1st Apr 20214:41 pmRNSSecond Price Monitoring Extn
1st Apr 20214:36 pmRNSPrice Monitoring Extension
31st Mar 20214:41 pmRNSSecond Price Monitoring Extn
31st Mar 20214:36 pmRNSPrice Monitoring Extension
31st Mar 202111:06 amRNSSecond Price Monitoring Extn
31st Mar 202111:00 amRNSPrice Monitoring Extension
31st Mar 20217:06 amRNSExtension to publication of final results
23rd Mar 20217:00 amRNSBasur-3 drilling site construction commences
4th Mar 20217:00 amRNSLoxley appeal inquiry scheduled for July 2021
15th Feb 20212:00 pmRNSPrice Monitoring Extension
11th Feb 20211:31 pmRNSSecond Instalment Purchase of Horse Hill Equipment
10th Feb 20217:01 amRNSJudge upholds injunction against unlawful protest
10th Feb 20217:00 amRNSLoxley appeal submitted to Planning Inspectorate
4th Feb 202111:25 amRNSInterim injuction against unlawful protest update
20th Jan 20217:00 amRNSCompletion of Resan licence agreement with AME
15th Jan 202110:00 amRNSHorse Hill oil field update
15th Jan 20218:44 amRNSAmended - Formal Government Consent - Resan
15th Jan 20217:00 amRNSGovernment consent - Resan licence acquisition
22nd Dec 20207:00 amRNSHorse Hill judicial review challenge dismissed
17th Dec 20207:00 amRNSAppeal against Loxley planning decision
10th Dec 20207:00 amRNSApplication for 3 new Turkish licences
4th Dec 20203:48 pmRNSExercise of Warrants
27th Nov 20204:41 pmRNSSecond Price Monitoring Extn
27th Nov 20204:36 pmRNSPrice Monitoring Extension
27th Nov 20203:42 pmRNSLoxley Gas Project Planning Consent Refused
25th Nov 202011:05 amRNSSecond Price Monitoring Extn
25th Nov 202011:00 amRNSPrice Monitoring Extension
20th Nov 20207:00 amRNSUpdate: Horse Hill Judicial Review
13th Nov 202012:35 pmRNSHorse Hill Judicial Review
5th Nov 20202:28 pmRNSHorse Hill oil field update
16th Oct 20207:00 amRNSDate for Loxley planning consent redetermination
14th Oct 20207:00 amRNSTurkey Resan licence update
2nd Oct 20202:06 pmRNSSecond Price Monitoring Extn
2nd Oct 20202:00 pmRNSPrice Monitoring Extension
2nd Oct 202011:43 amRNS£2.2m placing funding initial Turkey operations
1st Oct 202012:00 pmRNSHorse Hill-1 Portland intervention commences
21st Sep 20204:40 pmRNSSecond Price Monitoring Extn
21st Sep 20204:35 pmRNSPrice Monitoring Extension
21st Sep 20202:06 pmRNSSecond Price Monitoring Extn
21st Sep 20202:01 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.