The latest Investing Matters Podcast episode featuring financial educator and author Jared Dillian has been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUnion Jack Regulatory News (UJO)

Share Price Information for Union Jack (UJO)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 24.00
Bid: 23.00
Ask: 25.00
Change: 0.00 (0.00%)
Spread: 2.00 (8.696%)
Open: 24.00
High: 24.00
Low: 24.00
Prev. Close: 24.00
UJO Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Wressle-1 Extended Well Test Update

21 Jul 2015 07:00

RNS Number : 5713T
Union Jack Oil PLC
21 July 2015
 

Union Jack Oil plc

(AIM: UJO)

Wressle-1 Extended Well Test Update - Results of Penistone Flags Zone 3A Test

 

Union Jack Oil plc ("Union Jack" or "the Company"), an onshore oil and gas exploration company with a focus on drilling, development and investment opportunities in the United Kingdom hydrocarbon sector, notes that Egdon Resources PLC ("Egdon") has released an encouraging RNS regarding the results of the pumped test carried out over the Penistone Flags Zone 3A as part of the Extended Well Test ("EWT") at the Wressle-1 oil and gas discovery in licence PEDL180, located to the east of Scunthorpe. Union Jack holds an 8.33 per cent interest in PEDL180.

Egdon's RNS contained the following information:

During earlier initial testing, the Wressle-1 well produced oil and gas from three discrete reservoir intervals, the Ashover Grit, the Wingfield Flags, and the Penistone Flags as previously reported. At the end of those test operations, a completion was installed in the well to cater for a subsequent pumped EWT over the oil productive zones in the Ashover Grit (Zone 1) and the Penistone Flags (Zone 3A). 

Due to problems experienced with the downhole testing equipment, the pumped flow test of the Ashover Grit oil reservoir could not be undertaken first as originally planned, therefore test operations were switched to focus initially on the shallower Penistone Flags.

The Penistone Flags interval was pumped for a period of time and achieved average rates over a three day period of 131 barrels of oil per day ("bopd") and 222,000 cubic feet of gas per day, together totalling 168 barrels of oil equivalent per day ("boepd") with an average producing gas oil ratio ("GOR") of approximately 1,700 cubic feet of gas per barrel of oil ("scf/stb").

Due to increasing gas rates the pump was then stopped and the well allowed to naturally flow to surface on a series of decreasing choke sizes from 12/64" down to 8/64" (being the smallest available). Average rates over a two day period on the 8/64" choke were 105 bopd with 465,000 cubic feet of gas per day, together totalling 182 boepd with an average producing GOR of approximately 4,450 scf/stb.

During the course of this flow testing no associated formation water has been produced.

The gas production rate has increased to the point where it is approaching the limits allowed under the environmental permit and as such production from the interval has now been halted. The well is now being killed ready for the next operation to be conducted, an injection test over the Penistone Flags zone 3A interval, to provide further reservoir data.

On conclusion of this injection test, attention will return to resolving the operational issues and undertaking pumped oil production testing over the Ashover Grit interval.

Commenting on the latest flow test result, Mark Abbott, Managing Director of Egdon Resources said:

"I am pleased to report the continuing encouraging results from the Wressle-1 test programme. The hydrocarbon production rate of over 180 barrels of oil equivalent per day attained from the Penistone Flags oil zone has exceeded pre-test expectations. The production performance together with the planned injection test will provide valuable reservoir engineering data that will be used to plan for a commercial development of the Penistone Flags.

We now look forward to commencing operations on the EWT programme for the Ashover Grit and will provide another update in due course."

For further information please contact the following:

 

For further information please contact the following:

 

Union Jack Oil plc

David Bramhill

 

+44 (0) 77871 60682

Shore Capital

Nominated Adviser

Bidhi BhomaEdward Mansfield

Corporate Broking

Jerry Keen

+44 (0) 20 7408 4090

SP Angel

Joint Broker

Richard Hail

 

+44 (0) 20 3470 0470

Yellow Jersey PR Limited

Public Relations

Dominic Barretto

Kelsey Traynor

 

 

+44 (0) 7768 537 739

+44 (0) 7799 003 220

 

Notes to Editors:

 

The Wressle Oil Discovery -The Wressle Prospect was defined on proprietary 3D seismic data, which was acquired by Egdon in February 2012. The structure is located on trend with the producing Crosby Warren oil field and the Broughton-B1 oil discovery, both to the immediate northwest, and the Brigg-1 oil discovery to the immediate southeast. All contain oil in various different sandstone reservoirs within the Upper Carboniferous succession. The pre-drill gross mean Prospective Resources at Wressle, as calculated by Egdon, were estimated to be 2.1 million barrels of oil. This will be updated following the results of the current test operations.

The Wressle-1 well reached a total depth (TD) of 2240 metres measured depth (MD) (1814 metres true vertical depth below OS datum (TVDSS)) on 23 August 2014. Elevated mud gas readings were observed over large parts of the interval from the top of the Penistone Flags reservoir target (1831.5 metres MD) to TD. The interests in the Wressle-1 well are:

 

Egdon Resources U.K. Limited 25.00% (Operator)

Celtique Energie Petroleum Limited 33.33%

Europa Oil & Gas Limited 33.34%

Union Jack Oil plc 8.33%

 

The well was logged using measurement whilst drilling (MWD) logging tools run on the drill string. Petrophysical evaluation of the log data indicated the presence of potential hydrocarbon pay in three main intervals;

· Penistone Flags - up to 19.8 metres measured thickness (15.9 metres vertical thickness)

· Wingfield Flags - up to 5.64 metres measured thickness (5.1 metres vertical thickness)

· Ashover Grit - up to 6.1 metres measured thickness (5.8 metres vertical thickness)

On 9 February 2015 we updated shareholders on the successful Ashover Grit Flow Test which recorded flow rates of 80 barrels of oil per day and 47 thousand cubic feet of gas per day during a 16 hour main flow period. No appreciable volumes of water were observed. The oil is of good quality with a gravity of 39-40° API.

On 19 February 2015 we updated shareholders on the successful Wingfield Flags Flow Test which recorded flow rates of up to 182 barrels of oil per day of good quality 39-40 API oil on free flow, along with up to 456 thousand cubic feet of gas per day.

On 27 February 2015 we updated shareholders on the initial successful Penistone Flags test which produced gas at facilities-restricted flowrates of up to 1.7 million cubic feet of gas per day with associated oil of up to 12 barrels of oil per day and no free water.

On 27 March 2015 we updated shareholders on the second successful Penistone Flags test. Zone 3a in the Penistone Flags was perforated over a 7.5 metre interval and produced good quality oil with a gravity of 33o API. A total of 98.5 barrels of oil were recovered during the test (of which flow induced by swabbing operations produced 34.3 barrels of oil). This equates to a rate of approximately 77 barrels of oil per day (bopd).

 

Operations at the Wressle site will not involve the process of high volume hydraulic 'fracking' for shale gas.

Evaluation of potential recoverable hydrocarbons has been assessed in accordance with 2007 Petroleum Resources Management System prepared by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly sponsored by the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG) and the Society of Petroleum Evaluation Engineers (SPEE).

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSELFMSFISEIW
Date   Source Headline
24th May 20197:00 amRNSNotice of AGM
17th May 20192:06 pmRNSSecond Price Monitoring Extn
17th May 20192:00 pmRNSPrice Monitoring Extension
16th May 201912:00 pmRNSTR-1: Notification of Major Interest in Shares
13th May 201911:12 amRNSTR-1: Notification of Major Interest in Shares
13th May 20197:00 amRNSFinal Results for the Year Ended 31 December 2018
8th May 20195:00 pmRNSTR-1: Notification of Major Interest in Shares
30th Apr 20197:00 amRNSTotal Voting Rights
29th Apr 20197:00 amRNSWressle Planning Appeal Update
26th Apr 20197:00 amRNSCommencement of Drilling Operations at West Newton
16th Apr 20197:00 amRNSHolmwood Update
8th Apr 201911:25 amRNSResult of General Meeting and Total Voting Rights
20th Mar 20197:00 amRNSFundraising, Circular & Notice of General Meeting
14th Mar 20197:00 amRNSHolmwood Update
22nd Feb 201910:04 amRNSTR-1: Notification of Major Interest in Shares
20th Feb 20193:45 pmRNSBiscathorpe Update
5th Feb 20197:00 amRNSWressle Planning Update
25th Jan 20197:00 amRNSWressle Planning Extension Update
8th Jan 20199:50 amRNSTR-1: Notification of Major Interest in Shares
7th Jan 20191:30 pmRNSBiscathorpe Drilling Update
7th Dec 201811:52 amRNSTR-1: Notification of Major Interest in Shares
6th Dec 201811:30 amRNSBiscathorpe Drilling Update
5th Dec 201810:05 amRNSTR-1: Notification of Major Interest in Shares
4th Dec 201810:43 amRNSTR-1: Notification of Major Interest in Shares
4th Dec 20187:00 amRNSDirectorate Change and Grant of Options
3rd Dec 20187:00 amRNSCompletion of West Newton Farm-In
28th Nov 20184:15 pmRNSWressle Planning Decision
22nd Nov 20187:00 amRNSWressle Update
20th Nov 20187:00 amRNSDirector/PDMR Shareholding
15th Nov 20183:46 pmRNSWest Newton-A Wellsite Planning Update
7th Nov 20187:00 amRNSGrant of Options
5th Nov 20187:00 amRNSWest Newton Farm-in Agreement Signed
31st Oct 201811:00 amRNSPrice Monitoring Extension
31st Oct 20187:00 amRNSTotal Voting Rights
30th Oct 20187:00 amRNSBiscathorpe, Wressle and North Kelsey References
9th Oct 20187:00 amRNSTR-1: Notification of Major Interest in Shares
3rd Oct 20187:01 amRNSDirectors' Dealing
3rd Oct 20187:00 amRNSProposed Farm-in and Fundraising
18th Sep 20187:00 amRNSHalf Year Report
4th Sep 20187:00 amRNSHolmwood Update
29th Aug 20189:00 amRNSBiscathorpe Drilling Timetable and Update
14th Aug 20189:53 amRNSTR-1: Notification of Major Interest in Shares
1st Aug 20184:00 pmRNSWressle Planning Extension Update
24th Jul 20187:00 amRNSHolmwood Planning Update
18th Jul 20187:00 amRNSGrant of Options
5th Jul 20182:30 pmRNSSubmission of New Wressle Planning Application
4th Jun 20187:00 amRNSAcquisition of Additional Interest in Wressle
31st May 201811:47 amRNSResult of AGM
18th May 20187:00 amRNSAcknowledgement of Written Ministerial Statement
15th May 20187:00 amRNSWidmerpool Gulf and Humber Basin Acquisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.