PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTSG.L Regulatory News (TSG)

  • There is currently no data for TSG

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Drilling & Exploration Update

28 Oct 2020 07:00

RNS Number : 4043D
Trans-Siberian Gold PLC
28 October 2020
 

 Click on, or paste the following link into your web browser, to view the associated PDF document. 

http://www.rns-pdf.londonstockexchange.com/rns/4043D_1-2020-10-27.pdf

 

 

 

28 October 2020

Trans-Siberian Gold plc

("TSG", the "Company" or the "Group")

Exploration Drilling Update

Further High-Grade Results at Asacha Gold Mine

 

Trans-Siberian Gold plc (TSG.LN), a low cost, high grade gold producer in Kamchatka, Far East Russia, is pleased to provide an exploration update on Vein 25 North ("V25N") in the East Zone of the Asacha Gold Mine.

Highlights

· Selected results from ongoing surface drilling[1]:

o 1,305.4 g/t Au and 614 g/t Ag over 0.8 m Hole ID C2098

o 159.5 g/t Au and 120 g/t Ag over 5.0 m Hole ID C2105

o 32.3 g/t Au and 102 g/t Ag over 10.6 m 2 Hole ID N005

o 51.1 g/t Au and 84 g/t Ag over 2.4 m Hole ID C2099

o 63.4 g/t Au and 448 g/t Ag over 0.8 m Hole ID C2111

o 37.8 g/t Au and 94 g/t Ag over 1.8 m Hole ID C2109 

o 32.4 g/t Au and 204 g/t Ag over 1.7 m Hole ID C2117

o 16.2 g/t Au and 335 g/t Ag over 3.4 m 2 Hole ID N002

o 18.4 g/t Au and 519 g/t Ag over 2.6 m Hole ID C2100

o 15.1 g/t Au and 225 g/t Ag over 2.9 m Hole ID C2110

o 14.7 g/t Au and 37 g/t Ag over 2.6 m Hole ID C2092A

o 10.7 g/t Au and 14 g/t Ag over 3.3 m Hole ID C2097

· 23 additional holes drilled between mid July 2020 and mid October 2020.

· Extent of V25N now increased to 700 metres laterally and 325 metres vertically

· V25N still remains open to the North and at depth

· Total of 32,400 metres (116 holes) drilled since October 2019 over the Asacha licence

· Low over-all discovery cost of ~$14.29/oz. gold for the mineral resources defined at V25N

· Future drilling will focus on delineating V25N more precisely and aiming to increase contained ounces in the Indicated Resources category

· Other high potential targets will also be drill-tested including step-out extensions of Vein 25

 

Eugene Antonov, COO of Trans-Siberian Gold commented:

"We are excited to report the high-grade drilling results from our ongoing drilling campaign with a focus on expanding the scale of Vein 25. While the test mining carried out in Vein 25 South confirms the gold grades identified from drilling, the high-grade mineralisation remains open at depth and to the North. Our exploration team continues to deliver some very encouraging results and we are seeking to generate additional new targets over the Asacha license area. We look forward to updating our JORC-compliant Mineral Resource Estimate statement at the end of this year, which will incorporate all of the new drilling results and exploration data. Meanwhile the drilling campaign continues."

 

Table 1. 10 July 2020 to 17 October 2020 drilling results on Vein 25N

Hole ID

 

Collar coordinates

 

Azi- muth

Dip

Hole Length

From

To

Core Length

Horizontal Width

Au

Ag

 

X

Y

Z

degrees

m

m

m

m

m

g/t

g/t

C-2092A

54999

42254

333

270

-57

475

377.8

380.4

2.6

1.5

 14.7

 36.5

C-2093

54950

42289

332

270

-56

465.0

440.4

441.0

0.6

0.4

 0.1

 2.0

C-2094

55149

42314

376

270

-53

493.4

473.0

473.5

0.5

0.3

 15.0

 56.5

C-2095

55148

42315

377

270

-60

590

558.6

560.4

1.8

1.0

 0.6

 19.2

C-2096

54952

42111

305

270

-57

171

163.1

164.4

1.3

0.9

 17.4

 27.9

C-2097

55074

41979

287

90

-45

80

47.7

51.0

3.3

2.7

 10.7

 14.3

C-2098

54952

42109

305

270

-53

172

148.6

149.4

0.8

0.6

 1,305.4

 613.8

C-2099

54974

42126

309

270

-59

210

167.2

169.6

2.4

1.4

 51.1

 84.1

C-2100

55050

42283

353

270

-57

455

414.1

416.7

2.6

1.6

 18.4

 518.7

C-2101

54899

42115

302

270

-56

210

153.4

153.6

0.2

0.1

 3.3

 2.5

C-2102

54987

42301

341

270

-56

516

488.7

490.8

2.1

1.0

 1.5

 35.1

C-2103

54973

42129

309

270

-49

290

136.7

138.6

1.9

1.3

 0.2

 2.0

C-2104

54920

42149

308

271

-52

213.5

187.2

187.7

0.5

0.3

 5.2

 8.3

C-2105

54920

42150

308

270

-58

240

215.0

220.0

5.0

2.8

 159.5

 120.1

C-2106

55199

42297

373

270

-57

550

528.1

528.5

0.4

0.2

 9.8

 16.1

C-2107

54950

42076

300

270

-51

122

93.5

94.5

1.0

0.7

 0.1

 2.0

C-2108

55454

42189

319

270

-47

300

195.3

195.8

0.5

0.4

 29.1

 15.0

C-2109

55149

42318

377

268

-55

530

492.7

494.5

1.8

1.2

 37.8

 94.1

C-2110

55454

42189

319

270

-53

300

232.8

235.7

2.9

1.8

 15.1

 225.4

C-2111

55451

42226

325

270

-54

380

336.6

337.4

0.8

0.5

 63.4

 447.6

C-2112

55246

42298

364

270

-53

516

492.0

494.5

2.5

1.5

 8.6

 203.0

C-2113

55504

42197

319

270

-49

305

218.4

219.8

1.4

0.9

 1.6

 4.2

C-2114

55504

42197

319

270

-55

315

257.6

259.7

2.1

1.3

 1.3

 8.3

C-2115

54800

42214

302

270

-53

360

307.0

309.6

2.6

1.5

 9.4

 38.4

C-2116

55397

42235

331

270

-54

395

368.5

369.7

1.2

0.7

 6.7

 122.5

C-2117

54800

42214

302

270

-58

380

331.3

333.0

1.7

1.0

 32.4

 204.3

C-2118

55446

42265

335

270

-47

350

329.1

329.9

0.8

0.4

 8.2

 193.5

N-005

54869

41969

276

90

-70

190

168.3

178.9

10.6

4.2

 32.3

 102.3

N-006

55076

41962

286

85

-70

300

274.5

276.6

2.1

1.4

 12.6

 386.3

N-004

55199

42100

311

258

-70

250

238.7

239.7

1.0

0.3

 15.1

 18.7

N-002

55266

41925

282

90

-65

250

223.2

226.6

3.4

1.4

 16.2

 334.5

 

Note: "N-" holes were drilled for geotechnical studies; small portions of the veins could not be assayed; the vein could be thicker

 

 

Discovery & Expansion

 

V25N was discovered in September 2019, less than 1.5 km from the Company's operating mine and mill.

During the first three quarters of 2020, TSG's drilling campaign has been focused on expanding and delineating V25N. Very positive drilling results have enlarged the auriferous zone to at least 700 metres in length and 325 metres in depth. It now extends to within 50 metres of the existing adit that was developed last winter to reach V25S and where underground mine development is progressing. Together, V25N and V25S comprise an almost continuous gold zone 1 km long, located less than 1.5 km from the Asacha Gold Mine and mill that have been in continuous operation since 2011.

 

Mineral Resource Estimation

On 16 June 2020, TSG announced a new JORC-compliant Mineral Resource Estimate ("MRE") as of 30 April 2020 for the Asacha Gold Mine. The mineral resources for V25N was 5.4 tonnes (173,000 oz.) of gold in the Indicated category and 0.6 tonnes (19,000 oz.) of gold in the Inferred category. The combined V25N and V25S mineral resources add up to 7.0 tonnes of gold in the Indicated category at an average grade of 18.5 g/t Au and 1.8 tonnes in the Inferred category at an average grade of 13.7 g/t Au.

 

Since the publication of that MRE, multiple high-grade gold and silver results have been returned. When these results are combined with the new exploration data generated, we believe there is significant potential to upgrade the JORC-compliant MRE, which is expected to be commenced at the end of this year.

 

Drilling Campaign

 

Since the publication of the MRE in June 2020, the Group has drilled 31 new holes totalling 10,350 metres on V25N. Since October 2019, a total of 116 holes for 32,400 metres has been drilled on the Asacha license. Since October last year the estimated discovery cost of the additional mineral resources defined on V25N is averaging ~$14.29/oz. gold.

 

Two surface exploration rigs have been drilling on the Asacha license since the beginning of the year; drilling is expected to continue for a minimum of 12 months. The main objective of the next phase of drilling is to improve the definition and delineation of Vein 25 in order to increase the size of, and upgrade the category of, the resources to higher confidence categories. A series of step-out drillholes in the North and South far extensions of Vein 25 are also planned for the next few months. Additionally, a series of other high potential targets on the license area will be drill-tested (see Figure 2).

 

Geology

 

The vein intersections encountered at V25N show mineralogy, textures and alteration typical of a high-level low sulphidation epithermal gold system. The high-grade veins usually exhibit chalcedonic and/or colloform textures and hydrothermal breccias, with voids, strong clay alteration, trace to 2% manganese oxides and sometime fragments of ginguro (black mix of electrum, sulphides and sulfosalts). Typically, the quartz crystallinity and the silver/gold ratio increases with depth.

 

The gold is very finely disseminated in the veins, usually as a sub-microscopic dust, with only few intersections showing visible gold. This style of gold distribution is usually less prone to nugget effects and is expected to have good recovery at the mill.

 

Recently, underground development in the upper levels of V25S produced 22,740 tonnes of ore giving a final grade at the mill of 19.9 g/t gold. This bulk sampling was done in an area where the MRE estimate grade averaged 12-18 g/t Au. This clearly confirms the consistency and the low nugget effect of the gold in this part of Vein 25 and is a good indication of good future recovery in the rest of Vein 25.

 

Vein 25 (V25N & V25S) is quartz vein usually sub-vertical and dipping 80 to 85 degrees to the East. It pinches and swells, sometimes quite rapidly, but is reasonably well defined by a drilling grid of roughly 50m x 50m over 1 km laterally (North-South) and 350 metres vertically.

 

A vertical longitudinal section showing metal factors (true horizontal width X gold grade) and selected drilling results obtained to date from the 2019-2020 drilling campaign, including the latest results set out in this announcement, are shown in Figure 1.

 

 

 

 

 

 

 

 

 

 

 Figure 1. Zone 25 longitudinal with drill assay results and metal factors.

 

 

 

Figure 2. Asacha Property geology and drilling targets

 

 

Figure 3. Vein 25 detailed surface plan.

 

 

ENDS

 

Contacts

 

 

 

 

 

TSG

 

 

Stewart Dickson

+44 (0) 7799 694195

 

Arden Partners plc

 

 

Paul Shackleton (Corporate Finance)Tim Dainton / Fraser Marshall (Equity Sales)

+44 (0) 207 614 5900

 

Hudson Sandler (Financial PR)

+44 (0) 207 796 4133

 

Charlie Jack / Katerina Parker / Elfreda Kent

 

 

 

About TSG

TSG is focused on low cost, high grade mining operations and stable gold production from its 100% owned Asacha Gold Mine in Far East Russia. The Company also holds the licence for the development and exploration of the Rodnikova deposit, one of the largest gold fields in South Kamchatka.

 

Additional information, including figures and tables from this press release, is available from the Company's website: www.trans-siberiangold.com

 

QA/QC Program

A revised and upgraded QA/QC program has been implemented since H2 2019. It consists mainly of the insertion of one standard, one blank and one pulp duplicate in every batch sent for analysis to the laboratory at the Asacha Gold Mine. It is complemented by sending a batch of coarse duplicates to the laboratory every 600 assays and a batch of pulp duplicates to an independent external laboratory after about 600 assays. Overall, this represents some 20% of QA/QC samples.

 

 

Qualified Person Review

 

Information in this announcement that relates to exploration results is based on information compiled by Mr. Jacquelin Gauthier, P.Geo., consulting geologist to Trans-Siberian Gold plc. Mr. Gauthier has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which has been undertaken to qualify as a "Qualified Person" pursuant to Canada National Instrument 43-101 and a "Competent Person" in accordance with the AIM Rules Guidance Note for Mining and Oil & Gas Companies. Mr. Gauthier consents to the inclusion in the announcement of the matters based on the information in the form and context in which it appears.

 

 

Glossary of Technical Terms

"Au"

 

Chemical symbol for gold

"Ag"

"g/t"

Chemical symbol for silver

grams per tonne, equivalent to parts per million

"JORC"

The Australasian Joint Ore Reserves Committee Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 (the "JORC Code" or "the Code"). The Code sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves

"koz"

thousand troy ounces of gold

"m'

metre

"Mt"

million tonnes

"oz"

troy ounce (= 31.103477 grams)

"t"

tonne (= 1 million grammes)

 

 

Market Abuse Regulations

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

Disclaimer

This announcement contains "forward-looking statements" - that is, statements related to future, not past, events. In this context, forward-looking statements often address our expected future business and financial performance, and often contain words such as "expects," "anticipates," "intends," "plans," "believes," "seeks," "should" or "will." Forward-looking statements by their nature address matters that are, to different degrees, uncertain. For us, uncertainties arise from the behaviour of financial and metals markets, fluctuations in interest and/or exchange rates and metal prices; and from numerous other matters of national, regional and global scale, including those of a political, economic, business, competitive or regulatory nature. These uncertainties may cause our actual future results to be materially different that those expressed in our forward-looking statements.

 

 

 

[1] Since RNS announcement of 14 July 2020

2 "N" holes were drilled for geotechnical studies, small portions of the veins could not be assayed; the vein could be thicker

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLPPGPGUUPUPPM
Date   Source Headline
29th Sep 201612:16 pmRNSResult of General Meeting
5th Sep 20167:00 amRNSProposed capital reduction and Notice of GM
29th Jul 20161:27 pmRNSDirector/PDMR Shareholding
29th Jul 20161:26 pmRNSDirector/PDMR Shareholding
28th Jul 20164:23 pmRNSHolding(s) in Company
28th Jul 20163:47 pmRNSHolding(s) in Company
18th Jul 20167:00 amRNSAsacha mining and production update
30th Jun 20163:11 pmRNSResult of AGM
30th Jun 20167:00 amRNSHolding(s) in Company
30th Jun 20167:00 amRNSAsacha Mining and Production Update
9th Jun 20167:00 amRNSFinal Results
18th Apr 20167:00 amRNSAsacha mining and production update
9th Feb 20162:09 pmRNSStmnt re Share Price Movement
20th Jan 20167:00 amRNS4th Quarter Production Update
14th Oct 20157:00 amRNSAsacha mining and production update
28th Sep 20157:00 amRNSResults for the half year ended 30 Jun 2015
13th Jul 20157:00 amRNSAsacha production update
29th Jun 201512:47 pmRNSResult of Annual General Meeting
29th Jun 20159:10 amRNSAsacha mining and production update
8th Jun 20157:00 amRNS2014 Final Results and Notice of AGM
17th Apr 20157:00 amRNSAsacha mining and production update
26th Jan 20157:00 amRNSAsacha mining and production update
20th Oct 20147:00 amRNSAsacha mining and production update
30th Sep 20147:00 amRNSInterim Results for the half year ended 30/6/2014
11th Sep 20147:00 amRNSProduction Update & Rodnikova Licence Termination
17th Jul 20147:00 amRNSAsacha mining and production update
30th Jun 20143:00 pmRNSResult of AGM & Directorate Change
30th Jun 20147:00 amRNSAsacha mining and production update
9th Jun 20147:00 amRNSAnnual Financial Results & Notice of AGM
24th Apr 20147:00 amRNSAsacha mining and production update
21st Jan 20147:00 amRNSAsacha Mining and Production Update
17th Oct 20137:00 amRNSAsacha Mining & Production Update
30th Sep 20137:00 amRNSInterim results for the period ended 30 June 2013
19th Jul 20137:00 amRNSAsacha mining and production update
26th Jun 201311:24 amRNSResult of AGM
26th Jun 20137:00 amRNSAsacha mining and production update
19th Jun 20139:00 amRNSDirectorate Changes
5th Jun 20137:00 amRNSFinal Results for the year ended 31 December 2012
16th Apr 20137:00 amRNSAsacha mining and production update
22nd Feb 201310:12 amRNSChange of Adviser
23rd Jan 20137:00 amRNSAsacha Mining and Production Update
29th Oct 20127:00 amRNSAsacha Mining and Production Update
27th Sep 20127:00 amRNSHalf Yearly Report
16th Jul 20127:00 amRNSAsacha Mining & Production Update & New Loans
22nd Jun 201212:49 pmRNSAGM Statement
22nd Jun 20127:00 amRNSAGM Asacha Production Update
29th May 20127:00 amRNSPosting of Final Results and Notice of AGM
28th May 20127:00 amRNSFinal Results for the year ended 31 December 2011
24th Apr 20127:00 amRNSAsacha Mining and Production Update
3rd Feb 201212:33 pmRNSConversion of debt and Total Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.