Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTower Resources Regulatory News (TRP)

Share Price Information for Tower Resources (TRP)

Share Price is delayed by 15 minutes
Get Live Data
0.0205    -0.0005 (-2.38%)
Bid:
0.02
Ask:
0.021
Spread: 0.001 (5.00%)
Market Cap: £8.26m
TRP Live PriceLast checked at - London Stock Exchange

Intraday Tower Resources Share Chart

Application to Continue Exploration in Uganda EA5

23 Mar 2010 07:00

RNS Number : 9835I
Tower Resources PLC
23 March 2010
 



 

 

 

PRESS RELEASE 23 March 2010

 

Tower Resources plc

("Tower" or the "Company")

 

Neptune Petroleum applies to continue exploration in Uganda EA5 for another two years

 

Tower Resources plc announces that its wholly owned subsidiary Neptune Petroleum (Uganda) Limited, has applied to the Minister of Energy and Mineral Development, the Government of Uganda, to continue exploration of Licence EA5 into the Third Exploration Period. This period extends from March 27th 2010 until March 26th 2012. The forward programme will comprise geophysical activity as the next stage of operations, followed by a further exploration well, and this work programme together with relinquishment obligations are being discussed with government technical specialists. Agreement to proceed with the exploration programme is expected soon.

 

The Tower Board has concluded that the information from the first two exploration wells on EA5 demonstrates considerable exploration potential still exists in the Licence.

 

Avivi-1 encountered thick sequences of organic rich sediments which are likely to represent good mature source rocks in the deeper areas of the basin. The thick clays should also provide very effective trap sealing properties. Wireline logs and water samples demonstrate that the Avivi structure is water bearing but mid-mature oil was entrained in the sampled water confirming that oil has been generated in the Licence and is currently migrating. The composition of this oil is similar to that of oil recovered from Iti-1 and surface oil samples. Pressure data from Avivi-1, when combined with pressure data from Iti-1, is consistent with a possible oil accumulation at Iti-1 in low permeability reservoir sand. The uncertainty related to generation and migration of oil in the Rhino Camp Basin has, therefore, been significantly de-risked.

 

The lack of good quality reservoir at either well location increases the emphasis on identifying structures in the deepest area of the basin, where the chances of encountering better reservoir are improved. This can only be achieved by substantially increasing seismic coverage in the areas of greatest interest, which will be addressed in the forward work programme.

 

Most of the funding for the programme in the Third Exploration Period is expected to come from third parties and the Board is confident that this can be achieved. The company expects to have cash of about $3.5 million after well costs are satisfied and this is sufficient to meet costs for the immediate future. Subject to Government approval and availability of equipment, Neptune is aiming to undertake an aero-gradiometry survey over the area of greatest interest as soon as possible, to improve structural definition, and intends to fund this programme from available cash resources.

 

Namibia

 

The Namibian 3-D seismic survey is now scheduled to begin early in May but it is still expected that processing and interpretation can be completed around the end of 2010. There is no change to the estimated end 2011 date for drilling the first exploration well. There will likely be growing focus on the northern area of Namibia and the prospectivity of the 0010 Licence during 2010.

 

Peter Kingston, Tower's Executive Chairman commented: "The Tower Board has had no hesitation in deciding to continue with its exploration programme in Uganda for another two years. In particular, it is pleased that there is growing evidence of the presence of mature oil in the EA5 Licence. This is typical exploration progress, with valuable information being gained from each phase of activity which suggests that there is still everything to play for. The Board is also encouraged that exploration in Namibia is moving closer to well drilling programmes and the ultimate test of exploration potential in the area."

 

In accordance with AIM guidelines, Peter Kingston, who is a petroleum reservoir engineer with over 40 years experience in technical, executive and advisory roles in the oil exploration and production industry, and is Executive Chairman of the Company, is the qualified person that has reviewed and approved the technical information contained in this announcement. 

 

For more information on Tower Resources, please visit; www.towerresources.co.uk

 

Contacts:

 

Astaire Securities (NOMAD and Joint Broker)

020 7448 4400

Jerry Keen / Lindsay Mair

Westhouse Securities (Joint Broker)

020 7601 6100

Tim Feather

Walbrook PR

020 7933 8780

Paul McManus / Louise Goodeve

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCPGUWUWUPUGRP
Date   Source Headline
5th Jun 20264:17 pmRNSPosting of the Annual Report and Notice of Meeting
2nd Jun 20267:00 amRNSPreliminary Results to 31 December 2025
31st Mar 20267:00 amRNSTotal Voting Rights
16th Mar 20267:00 amRNSLicense and Farmout Approval Update & Subscription
16th Mar 20267:00 amRNSLicense and Farmout Approval Update & Subscription
27th Feb 20267:00 amRNSTotal Voting Rights
28th Jan 20267:00 amRNSSubscription to raise £375,000
28th Nov 20257:00 amRNSTotal Voting Rights
17th Nov 20257:00 amRNSSubscription to raise £280,000
31st Oct 20257:00 amRNSTotal Voting Rights
17th Oct 20257:00 amRNSSubscription to raise £550,000
30th Sep 20257:00 amRNSInterim Results to 30 June 2025
1st Sep 20257:00 amRNSBridge Loan
1st Jul 20257:00 amRNSBridge Loan
30th Jun 20252:00 pmRNSResult of Annual General Meeting
10th Jun 20257:00 amRNSLetter of Award for Rig Contract in Cameroon
6th Jun 20254:12 pmRNSPosting of the Annual Report and Notice of Meeting
2nd Jun 20257:00 amRNSPreliminary Results to 31 December 2024
9th Apr 20257:00 amRNSGrant of Restricted Shares under LTIP
26th Mar 20257:00 amRNSBridge Loan
7th Mar 20257:00 amRNSNamibia and Cameroon Update
31st Jan 20251:57 pmRNSReplacement: Total Voting Rights
31st Jan 20257:00 amRNSTotal Voting Rights
22nd Jan 20256:02 pmRNSExercise of Warrants
15th Jan 20255:37 pmRNSTR-1: Notification of major holdings
10th Jan 20257:00 amRNSTransformational Farm-out Agreements
3rd Dec 20241:21 pmRNSTotal Voting Rights
11th Nov 20247:00 amRNSSubscription to raise £275,000
31st Oct 20247:00 amRNSTotal Voting Rights
24th Oct 20245:27 pmRNSTR-1: Notification of major holdings
16th Oct 20247:00 amRNSCameroon Farm-out Update & Placing
1st Oct 20247:00 amRNSExercise of Warrants
30th Sep 20247:00 amRNSInterim Results to 30 June 2024
13th Aug 20247:00 amRNSIssue of Warrants to Directors
2nd Aug 20247:05 amRNSBoard Changes
2nd Aug 20247:00 amRNSNamibia Update
18th Jul 20242:00 pmRNSResult of Annual General Meeting
1st Jul 20247:00 amRNSIssue of Warrants to Directors
28th Jun 20247:00 amRNSTotal Voting Rights
21st Jun 20247:00 amRNSPosting of Annual Report and Notice of Meeting
13th Jun 20241:56 pmRNSHolding(s) in Company
6th Jun 20247:00 amRNSSubscription and Director’s Dealings
3rd Jun 20247:06 amRNSPreliminary Results to 31 December 2023
23rd May 202412:30 pmRNSCameroon Rig Update
23rd Apr 20247:00 amRNSTR-1: Notification of major holdings
28th Mar 20247:00 amRNSTotal Voting Rights and Broker Update
29th Feb 20247:00 amRNSTotal Voting Rights
16th Feb 20247:00 amRNSGrant of Options under Long Term Incentive Plan
15th Feb 20247:00 amRNSRepayment of EECP Facility and Subscription
9th Feb 20247:00 amRNSShare Issuance to EECP

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.