The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTomco Energy Regulatory News (TOM)

Share Price Information for Tomco Energy (TOM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0385
Bid: 0.037
Ask: 0.04
Change: 0.00 (0.00%)
Spread: 0.003 (8.108%)
Open: 0.0385
High: 0.0385
Low: 0.0385
Prev. Close: 0.0385
TOM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

5 Mar 2012 07:00

RNS Number : 6418Y
TomCo Energy PLC
05 March 2012
 



5 March 2012

TomCo Energy Plc

(''TomCo Energy'' or ''the Company'')

(AIM:TOM)

 

Operational Update

Further to the announcement made on 23 August 2011 TomCo Energy PLC, the AIM quoted company with oil shale assets in the State of Utah, USA, is pleased to report progress on a number of key contracts which were entered into to provide some of the baseline environmental and operational information necessary for a comprehensive development plan for the Holliday Block and the various permit applications.

Highlights

·; In December 2011 the Company received the Hatch Engineering FEL 2 (Pre-Feasibility Study) Report for Red Leaf Resources Inc ("Red Leaf"), a key component to proving the project economics at Pre-Feasibility level

·; Several Epic Engineering studies completed in preparation for production at the Holliday Block

·; SRK Consulting ("SRK") engaged in February 2012 to report on TomCo's resource - results are expected in H2 of this year

·; Completion of early stage geological, infrastructure and water-use studies

Holliday Block

On 22nd of September 2011 the Company entered into an Engineering Service Agreement with Rocky Mountain Power ("RMP") under which RMP is evaluating various alternative routes and options for the provision of high voltage line power to the Holliday Block site for the supply of electricity for oil production. On 30th January 2012 the First Amendment to this Agreement was signed which detailed the costs and set out the timetable for the programme. This work continues.

 

In December 2011 the Company received the Hatch Engineering FEL 2 report produced for Red Leaf Resources Inc ("Red Leaf") under the terms of the Red Leaf "EcoShaleTM" License which details the engineering requirements for the development of the Holliday Block. The project economics from the FEL2 report remain in line with TomCo's admission document and the Board believes that it, along with the inclusion of Norwest's mining plan, should enable SRK to upgrade TomCo's JORC resource to "probable reserve" status, as it will prove the project economics at Pre-Feasibility Study level, as required under JORC.

 

As previously announced the Company has contracted Epic Engineering ("Epic") to undertake a number of studies to prepare the way for production at the Holliday Block and several of these have now been completed:

 

·; Roads and Access Study: the compilation of road status, usage and projected traffic loading, implied by the development of a 9500 bopd EcoShaleTM facility at Holliday Block and recommendations and costs of upgrades for consideration by the Uintah County authorities. This work has now been completed and sets out the recommendations and costs.

·; High Resolution Topographical Study of Holliday Block with a detailed ground survey, in order to further refine the geological model and assist with the upgrade of the resource assessments. This work has been completed and the results delivered to SRK for their work in reporting on the TomCo resource.

·; A boundary survey - involving a field survey and staking. This has been completed.

·; A Preliminary Environmental Study involving a field study of drainage, seeps and springs to prepare for a "Waters of the US" study. This is in progress.

·; A Water Resources Inventory undertaken by Epic providing data on drainage patterns, storm water predictions, seeps, springs etc in the Holliday Block area and providing necessary baseline data required for environmental studies and future development permit applications, and also to determine additional water supply requirements for the planned TomCo development. This is in progress.

On 29th July 2011 the Company contracted Norwest Corporation ("Norwest") to conduct field mapping at the Holliday Block to map the mahogany zone outcrop and to develop a detailed and fully costed provisional Mine Plan for TomCo's Holliday Block development. Norwest has been working closely with Red Leaf on their Mine Plan for the nearby Seep Ridge EcoShaleTM project and bring this experience to bear directly on the Holliday Block Project.

The TomCo Mine Plan will be based on the detailed geological model that will be developed by SRK Consultants (SRK) from the Company's initial core-hole drilling programme completed in 2010 and will be the principal input into the development of Feasibility Economics for the Project. This work is in progress.

Currently SRK are engaged to check the assays of the drill samples as part of the consideration of an upgrade of TomCo's JORC compliant indicated resource to measured resource, which involves updating the geological model with the new topographical survey data and the recalculation of the resource through incorporating check core assays and the detailed surface mapping of the Mahogany oil shale outcrop. These results are expected in H2 2012.

Sir Nicholas Bonsor, Chairman of TomCo, commented today,

"We are making good progress with the pre-development work with a significant number of studies completed and several more identified to complete our pre-development programme for the Holliday Block site. We will continue to keep our shareholders up to date with both corporate and operational developments as we move towards our production targets."

For further information please visit www.tomcoenergy.com or contact:

TomCo Energy - 0207 660 070

Sir Nicolas Bonsor, Chairman

 

Numis - 0207 260 1000

Alastair Stratton/Oliver Cardigan, Corporate Finance

James Black, Corporate Broking

 

Newgate Threadneedle - 0207 653 9840

Richard Gotla/Terry Garrett

 

Notes to Editors:

TomCo Energy Plc owns oil shale leases covering approximately 3,000 acres in the Green River Shale Formation, Uintah County, Utah. The leases have been independently estimated by SRK Consultants Ltd to hold up to 230 million barrels of oil in 4 separate tracts. Around 123 million barrels of this resource lie on the main tract of Holliday Block lease, and have now been classified as an Indicated Resource under the JORC Code.

TomCo has entered into a License with Red Leaf Resources Inc (Red Leaf), which owns the EcoShaleTM In-Capsule Process (EcoShale), to use this unique and environmentally sensitive technology to extract oil from TomCo's leases. Red Leaf is planning an eventual 9,500 bopd commercial operation at their Seep Ridge site, which lies about 15 miles SW of TomCo's Holliday Block lease.

 

TomCo's strategy is to develop the Holliday Block lease as a similar follow-on project to Seep Ridge using the EcoShaleTM In-Capsule Process, with the same targeted production of 9,500 bopd.

 

Glossary:

 

bopd: barrels of oil per day

 

JORC Code: The mineral resource classification code devised by the Australasian Joint Ore Reserves Committee.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFVVVFIVIIF
Date   Source Headline
15th Apr 20249:04 amRNSHolding(s) in Company
28th Mar 20242:56 pmRNSResults for the year ended 30 September 2023
25th Mar 20249:09 amRNSHolding(s) in Company
22nd Mar 20243:58 pmRNSHolding(s) in Company
19th Mar 20244:01 pmRNSHolding(s) in Company
6th Mar 20243:28 pmRNSHolding(s) in Company
28th Feb 20244:21 pmRNSHolding(s) in Company
21st Feb 20247:00 amRNS£300,000 Equity Fundraise
2nd Jan 20247:00 amRNS£50,000 Equity Fundraise and TSHII Update
1st Dec 20232:42 pmRNSHolding(s) in Company
1st Dec 202310:37 amRNSHolding(s) in Company
25th Oct 20237:00 amRNSHolding(s) in Company
13th Oct 20237:00 amRNS£100,000 Equity Fundraise
7th Sep 20231:37 pmRNSHolding(s) in Company
29th Aug 20234:09 pmRNSResult of Annual General Meeting
17th Aug 20234:54 pmRNSHolding(s) in Company
17th Aug 202312:24 pmRNSHolding(s) in Company
17th Aug 202310:00 amRNSTSHII Update & Updated Independent Reserves Report
7th Aug 20237:00 amRNSNotice of AGM
3rd Aug 20235:27 pmRNSHolding(s) in Company
2nd Aug 20235:05 pmRNSHolding(s) in Company
28th Jul 202312:24 pmRNSHolding(s) in Company
28th Jul 202312:11 pmRNSHolding(s) in Company
25th Jul 20234:09 pmRNSHolding(s) in Company
4th Jul 20232:48 pmRNSHolding(s) in Company
4th Jul 20237:00 amRNSConversion of Remainder of Convertible Loan Note
30th Jun 202310:58 amRNSHolding(s) in Company
30th Jun 20237:00 amRNSInterim Results
29th Jun 20234:37 pmRNSHolding(s) in Company
29th Jun 20233:11 pmRNSHolding(s) in Company
27th Jun 20231:59 pmRNSHolding(s) in Company
16th Jun 20232:20 pmRNSHolding(s) in Company
14th Jun 20237:00 amRNS£500,000 Equity Fundraise
6th Jun 20237:00 amRNSUpdate re TSHII
1st Jun 20235:27 pmRNSPartial Conversion of Convertible Loan Note
31st May 20234:27 pmRNSHolding(s) in Company
24th May 202312:30 pmRNSHolding(s) in Company
16th May 20232:34 pmRNSPartial Conversion of Convertible Loan Note
2nd May 20231:38 pmRNSUpdate re TSHII
28th Apr 20236:02 pmRNSHolding(s) in Company
28th Apr 20232:04 pmRNSHolding(s) in Company
28th Apr 20239:47 amRNSHolding(s) in Company
25th Apr 20232:44 pmRNSHolding(s) in Company
24th Apr 20237:00 amRNSDrawdown of initial Convertible Loan Note Facility
6th Apr 20231:30 pmRNSResults for the year ended 30 September 2022
6th Apr 20231:30 pmRNSRestoration - TomCo Energy Plc
3rd Apr 20237:30 amRNSSuspension - TomCo Energy Plc
3rd Apr 20237:00 amRNSSuspension of trading on AIM pending 2022 Accounts
30th Mar 20237:00 amRNSConvertible Loan Note Facility
6th Mar 20237:00 amRNSUpdate re TSHII

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.