Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksTlou Energy Regulatory News (TLOU)

Share Price Information for Tlou Energy (TLOU)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.00
Bid: 1.90
Ask: 2.10
Change: 0.00 (0.00%)
Spread: 0.20 (10.526%)
Open: 2.00
High: 2.00
Low: 2.00
Prev. Close: 2.00
TLOU Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

First development pod successfully completed

12 Feb 2019 07:00

RNS Number : 6980P
Tlou Energy Ltd
12 February 2019
 

12 February 2019

 

Tlou Energy Limited

("Tlou" or "the Company")

 

First development pod successfully completed

 

 

Tlou Energy Limited, the ASX, AIM and BSE listed company focused on delivering power in Botswana and southern Africa through the development of coal bed methane ('CBM'), has successfully completed the drilling of the Lesedi 3 development pod at its CBM project in Botswana.

 

Highlights

· Lateral wells Lesedi 3A and Lesedi 3B have been successfully completed with both wells intersecting with the vertical well Lesedi 3P to complete the Lesedi 3 development pod.

· Dewatering and gas flow testing at Lesedi 3 will commence following the installation of production equipment.

· The drill rig is being moved to the second planned production pod, Lesedi 4.

 

Pilot well drilling program

The Company commenced drilling of development wells at its gas field in late 2018. The wells are being drilled as 'dual lateral pods', comprising a single vertical production well intersected by two lateral wells. The lateral wells are being drilled through the gassy coal seam with gas extracted from this coal produced through the vertical production well where it can be gathered and used for power generation. Pod One is designated 'Lesedi 3' and comprises a vertical production well ('Lesedi 3P') and two lateral wells ('Lesedi 3A' & 'Lesedi 3B'). Pod Two is designated 'Lesedi 4',

 

The Company can confirm that drilling operations at Lesedi 3 have been completed. Lateral well Lesedi 3A was drilled ~1,437m Measured Depth (MD) and Lesedi 3B was drilled ~1,440m MD with both lateral wells successfully intersecting with vertical well Lesedi 3P to complete the dual lateral pod.

 

Lesedi 3 is now being prepared for installation of production facilities prior to the commencement of de-watering and lowering of the pressure in the coal seam to achieve gas flow.

 

The drilling rig is being moved to commence drilling of the second planned development pod, Lesedi 4. The Company will provide further updates as the drilling operations progress.

 

The development drilling program is being conducted in accordance with health and safety requirements and are consistent with the Company's approved environmental impact statement. If results are positive, these wells will form part of the Company's initial gas-to-power project which will include installation of transmission lines and grid connection.

 

Schematic of a Dual Lateral Pod

http://www.rns-pdf.londonstockexchange.com/rns/6980P_1-2019-2-11.pdf

 

****

For further information regarding this announcement please contact:

 

Tlou Energy Limited

+61 7 3012 9793

Tony Gilby, Managing Director

 

Solomon Rowland, General Manager

 

 

 

Grant Thornton (Nominated Adviser)

+44 (0)20 7383 5100

Samantha Harrison, Colin Aaronson, Harrison Clarke

 

 

 

Shore Capital (Broker)

+44 (0) 207 408 4090

Jerry Keen, Toby Gibbs, Mark Percy

 

 

 

FlowComms Limited (Investor Relations)

+44 (0) 7891 677 441

Sasha Sethi

 

Company Information

Tlou Energy is focused on delivering Gas-to-Power solutions in Botswana and southern Africa to alleviate some of the chronic power shortage in the region. Tlou is developing projects using coal bed methane ('CBM') natural gas. Botswana has a significant energy shortage and generally relies on imported power and diesel generation to fulfil its power requirements. As 100% owner of the most advanced gas project in the country, the Lesedi CBM Project, Tlou Energy provides investors with access to a compelling opportunity using domestic gas to produce power and displace expensive diesel and imported power.

 

The Company is listed on the Australian Securities Exchange, London's AIM market and the Botswana Stock Exchange and is led by an experienced Board, management and advisory team including individuals with successful track records in the CBM industry.

 

Since establishment, the Company has significantly de-risked the project in consideration of its goal to become a significant gas-to-power producer. The Company flared its first gas in 2014 and has a 100% interest in a Mining Licence and nine Prospecting Licences covering an area of ~8,300 Km2 in total. The Lesedi and Mamba Projects already benefit from significant independently certified 2P gas Reserves of ~41 BCF. In addition, 3P gas Reserves of ~427 BCF and Contingent Gas Resources of ~3,044 BCF provide significant additional potential.

 

The Company is planning an initial scalable gas-to-power project. Following successful implementation of this first scalable project, the Company looks forward to evaluating longer-term prospects for the delivery of electricity generated from CBM in Botswana to neighbouring countries.

 

Lesedi and Mamba CBM Project permits and surrounding power infrastructure

 

http://www.rns-pdf.londonstockexchange.com/rns/6980P_2-2019-2-11.pdf

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLEAAAFFDANEAF
Date   Source Headline
29th Apr 20247:00 amRNSFurther Placement of Entitlement Offer Shortfall
26th Apr 20247:00 amRNSQuarterly Activities Report q/e 31 March 2024
26th Mar 20247:00 amRNSPlacement of Entitlement Offer Shortfall
8th Mar 20247:00 amRNSInterim Results
23rd Feb 20247:00 amRNSLesedi Project Update
5th Feb 20247:00 amRNSResults of Entitlement Offer
24th Jan 20247:00 amRNSQuarterly Activities Report q/e 31 December 2023
8th Jan 20247:00 amRNSNon-Renounceable Entitlement Offer Extension
22nd Dec 202311:18 amRNSResult of General Meeting
15th Dec 20237:00 amRNSNon-Renounceable Entitlement Offer
27th Nov 20237:00 amRNSFirst Gas Flow from Lesedi 6 Production Pod
24th Nov 20239:00 amRNSNotice of General Meeting
6th Nov 20237:00 amRNSA$3m Loan Agreement
31st Oct 20237:00 amRNSResults of AGM and Chairman's Address
27th Oct 20237:00 amRNSQuarterly Activities Report q/e 30 September 2023
6th Oct 20237:00 amRNSCompletion of Private Placement
29th Sep 20238:31 amRNSFinal Results
29th Sep 20237:00 amRNSNotice of AGM
11th Sep 20239:19 amRNSDate of 2023 Annual General Meeting
11th Sep 20237:00 amRNSLesedi Drilling and Project Update
25th Jul 20237:00 amRNSQuarterly Activities Report q/e 30 June 2023
22nd Jun 20233:22 pmRNSUpdate - Results of Entitlement Offer
20th Jun 20237:22 amRNSResults of Entitlement Offer
14th Jun 20237:00 amRNSDrilling and Operational Update
12th Jun 20234:23 pmRNSPublication of Supplementary Prospectus
5th Jun 20237:38 amRNSEntitlement Offer – Extension of Closing Date
23rd May 20239:43 amRNSDespatch of Prospectus to Eligible Shareholders
12th May 20237:00 amRNSPartially Underwritten Entitlement Offer
2nd May 20237:00 amRNSA$2m Loan Agreement Signed
28th Apr 20237:00 amRNSQuarterly Activities Report
13th Apr 20237:09 amRNSLesedi 6 Production Well Drilling
27th Mar 20237:13 amRNSA$200k placement
15th Mar 20237:00 amRNSGas Production Well and Core-hole Drilling
9th Mar 20237:00 amRNSInterim Results
23rd Feb 20232:25 pmRNSInterview with Proactive Investors
27th Jan 20237:00 amRNSOperational Report Quarter ended 31 December 2022
25th Jan 202311:42 amRNSIssue of Shares and Total Voting Rights
19th Jan 20235:16 pmRNSChange of Adviser
18th Jan 20238:14 amRNSResults of General Meeting
19th Dec 20227:00 amRNSNotice of General Meeting
15th Dec 20227:00 amRNSA$3 million placement
17th Nov 202212:16 pmRNSHolding(s) in Company
17th Nov 202212:16 pmRNSHolding(s) in Company
15th Nov 20222:05 pmRNSSecond Price Monitoring Extn
15th Nov 20222:00 pmRNSPrice Monitoring Extension
11th Nov 20222:05 pmRNSSecond Price Monitoring Extn
11th Nov 20222:00 pmRNSPrice Monitoring Extension
11th Nov 20227:00 amRNSA$3 million placement
9th Nov 202212:09 pmEQSTlou Energy raises A$2mln to get Lesedi into development by end 2023
4th Nov 20227:28 amRNSA$2 million placement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.