Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.60    0.05 (9.09%)
Bid:
0.55
Ask:
0.65
Spread: 0.10 (18.182%)
Market Cap: £6.18m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Uranium Exploration Update

24 Sep 2024 07:00

RNS Number : 2781F
Thor Energy PLC
24 September 2024
Ā 

24 September 2024

Thor Energy PLC

Ā 

("Thor" or the "Company")

Ā 

Uranium Exploration Update: Drill Preparations Underway

Wedding Bell and Radium Mountain Projects, USA

Ā 

The directors of Thor Energy Plc ("Thor") (AIM, ASX: THR, OTCQB: THORF) are pleased to provide a drilling update on the Company's 100% owned Wedding Bell and Radium Mountain Projects, located in the uranium-vanadium mining district of the Uravan Mineral Belt, southwest Colorado, USA.

Highlights:

§ On-ground drill site preparations are now underway for our 2024 drilling programs at Rim Rock and Groundhog mine areas, with drilling scheduled to commence in early October (Figure 1).

§ The reverse circulation program includes infill and extension holes following up on Thor's successful 2022 and 2023 program, with the objective of completing a JORC mineral resource estimation.

§ At Groundhog, infill drilling will be centred around high-grade uranium and vanadium mineralisation intercepted in 23WBRA020 (ASX/AIM: 29 February 2024), with extension holes up to 300m to the north and east (Figure 2). 

23WBR020: 4.9m @ 1199ppm (0.12%) U3O8 and 6306ppm (0.63%) V2O5 from 82m,

Including, 0.6m @ 6250ppm (0.63%) U3O8 and 30348ppm (3.0%) V2O5 from 82.6m

§ At Rim Rock, infill drilling will be centred around 23WBRA011, 23WBRA012 and 23WBRA016 (ASX/AIM: 29 February 2024), with exension drilling toward the open areas to the east and south (Figure 3).

23WBR011: 6.1m @ 563ppm (0.06%) U3O8 and 9100ppm (0.9%) V2O5 from 74.7m,

Including, 1.5m @ 1624ppm (0.16%) U3O8 and 19637ppm (2.0%) V2O5 from 76.2m

§ Drill contractor Envirotech Drilling LLC and downhole logging contractor Jet West Geophysical Services LLC have both been secured/contracted.

Photo 1: Site preparation at Groundhog Prospect

Ā 

Nicole Galloway Warland, Managing Director of Thor Energy, commented:

Ā 

"With all approvals in place as announced in August, Thor is delighted to commence on ground drill site preparations for our upcoming infill and extension drill program. This highlights the Company's direction in focusing on our main priority in the Thor portfolio, our uranium and vanadium prospects at the Wedding Bell and Radium Mountain Projects.

Ā 

"We look forward to updating the market when drilling commences."Ā 

Ā 

Figure 1: Wedding Bell and Radium Mountain Projects, Colorado

Ā 

Figure 2: Drill collars at Groundhog Mine showing 2024 proposed collars in blue

Ā 

Figure 3: Drill collars at Rim Rock mine area showing 2024 proposed collars in blue

Figure 4: Uranium and Vanadium Project Location Map within the Uravan Mineral Belt

Ā 

Ā 

The Board of Thor Energy Plc has approved this announcement and authorised its release.

Ā 

For further information, please contact:

Thor Energy PLC

Nicole Galloway Warland, Managing Director

Ray Ridge, CFO / Company Secretary

Tel: +61 (8) 7324 1935

Tel: +61 (8) 7324 1935

Zeus Capital Limited (Nominated Adviser and Joint Broker)

Tel:Ā +44 (0) 203 829 5000

Antonio Bossi / Darshan Patel / Isaac Hooper

SI Capital Limited (Joint Broker)

Tel: +44 (0) 1483 413 500

Nick Emerson

Yellow Jersey (Financial PR)

thor@yellowjerseypr.com

Dom Barretto / Shivantha Thambirajah / Bessie Elliot

Tel: +44 (0) 20 3004 9512

Ā 

Competent Person Statement

The information in this report that relates to Geological interpretation and Exploration Results is based on information compiled by Nicole Galloway Warland, who holds a BSc Applied geology (HONS) and who is a Member of The Australian Institute of Geoscientists. Ms Galloway Warland is an employee of Thor Energy PLC. She has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Nicole Galloway Warland consents to the inclusion in the report of the matters based on her information in the form and context in which it appears.

About Thor Energy Plc

The Company is predominantly focused on uranium and energy metals that are crucial in the shift to a 'green' energy economy. Thor has several highly prospective projects that give shareholders exposure to uranium, vanadium, copper, tungsten, lithium, nickel and gold, located in the favourable mining jurisdictions of Australia and the USA.

Thor holds 100% interest in three uranium and vanadium projects (Wedding Bell, Radium Mountain and Vanadium King) in the Uravan Belt region of Colorado and Utah, with historical high-grade uranium and vanadium drilling and production results.

At Alford East in South Australia, Thor has earnt an 80% interest in oxide copper deposits considered amenable to extraction via In-Situ Recovery techniques (ISR). In January 2021, Thor announced an Inferred Mineral Resource Estimate.

Thor also holds a 26.3% interest in a private Australian copper development company EnviroCopper Limited (ECL), which Kapunda copper mine and the Alford West copper project, both situated in South Australia, and both considered amenable to recovery by way of ISR. Alligator Energy recently invested A$0.9M for a 7.8% interest in ECL with the rights to gain a 50.1% interest by investing a further A$10.1m over four years.

Thor holds 75% interest (with Investigator Resources 25%) of the advanced Molyhil tungsten project, including measured, indicated and inferred resources, in the Northern Territory of Australia, which was awarded Major Project Status by the Northern Territory government in July 2020.

Thor owns 100% of the Ragged Range Project, comprising 92 km2 of exploration licences with highly encouraging early-stage gold and nickel results in the Pilbara region of Western Australia.

For further information on Thor Energy and to see an overview of its projects, please visit the Company's website at https://thorenergyplc.com/.

Ā 

The Company notes that for the relevant market announcements noted above, that it is not aware of any new information or data that materially affects this information and that all material assumptions and technical parameters underpinning any estimates continue to apply and have not materially changed.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
Ā 
END
Ā 
Ā 
DRLUOAURSBUKUAR
Date   Source Headline
9th Feb 20187:00 amRNSAppendix 3B
8th Feb 201812:23 pmRNSHolding(s) in Company
8th Feb 20187:00 amRNSTrading Halt on the ASX
6th Feb 20187:00 amRNSExercise of Warrants
1st Feb 20187:00 amRNSQUARTERLY REPORT OCTOBER TO DECEMBER 2017
31st Jan 201811:00 amRNSDecember 2017 Appendix 5B
31st Jan 20187:00 amRNSAppendix 3B
30th Jan 20186:22 pmRNSHolding(s) in Company
24th Jan 201811:00 amRNSPrice Monitoring Extension
23rd Jan 201811:30 amRNSStrategic Financing
22nd Jan 20182:43 pmRNSAppendix 3B
22nd Jan 20187:00 amRNSDirector/PDMR Shareholding
18th Jan 20189:44 amRNSExercise Of Warrants
17th Jan 201812:34 pmRNSDirector/PDMR Shareholding
16th Jan 201811:21 amRNSDirector/PDMR Shareholding
16th Jan 20187:39 amRNSUS LITHIUM UPDATE
15th Jan 20187:00 amRNSCLARIFICATION OF UPGRADED ORE RESERVE AT MOLYHIL
8th Jan 201810:26 amRNSUPGRADED ORE RESERVE AND EXTENDED MINE LIFE
4th Jan 201811:20 amRNSWESTERN SHAW PROJECT - DUE DILIGENCE UPDATE
28th Dec 20178:59 amRNSAppendix 3B
27th Dec 20177:00 amRNSDirector Appointment and Business Update
21st Dec 20178:15 amRNSExercise of Warrants
21st Dec 20177:59 amRNSHolding(s) in Company
20th Dec 20178:45 amRNSAppendix 3Z
18th Dec 20179:35 amRNSAppendix 3B
15th Dec 201711:22 amRNSBOARD CHANGES
15th Dec 20177:45 amRNSAppendix 3B
12th Dec 20178:28 amRNSEXERCISE OF WARRANTS
8th Dec 20179:19 amRNSOPTION AGREEMENT TO ACQUIRE PILBARA PROJECT
7th Dec 20179:59 amRNSCHANGE OF BROKER
6th Dec 20179:30 amRNSAppendix 3B
30th Nov 20179:30 amRNSDirector/PDMR Shareholding
30th Nov 20179:15 amRNSAppendix 3B
29th Nov 201711:39 amRNSRESULT OF ANNUAL GENERAL MEETING
29th Nov 20179:02 amRNSAppendix 3B
28th Nov 201712:04 pmRNSEXERCISE OF WARRANTS
27th Nov 20171:36 pmRNSHOLDING(S) IN COMPANY
23rd Nov 20178:13 amRNSEXERCISE OF WARRANTS
21st Nov 201710:35 amRNSEARLY SETTLEMENT OF PRODUCTION PAYMENT
21st Nov 201710:06 amRNSHOLDING(S) IN COMPANY
21st Nov 20179:29 amRNSAppendix 3B
15th Nov 201711:19 amRNSEXERCISE OF WARRANTS
15th Nov 201710:43 amRNSAppendix 3B
13th Nov 20179:26 amRNSAppendix 3B
10th Nov 20178:06 amRNSDirector/PDMR Shareholding
10th Nov 20178:03 amRNSAppendix 3B
9th Nov 201710:00 amRNSEXERCISE OF WARRANTS
7th Nov 201711:17 amRNSEXERCISE OF WARRANTS
7th Nov 20177:25 amRNSNOTICE OF ANNUAL GENERAL MEETING
6th Nov 20175:20 pmRNSAppendix 3B

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.