Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.575    0.00 (0.00%)
Bid:
0.55
Ask:
0.60
Spread: 0.05 (9.091%)
Market Cap: £5.92m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Positive Initial Drilling Results - Spring Hill

8 Aug 2012 07:00

RNS Number : 5439J
Thor Mining PLC
08 August 2012
 



THOR MINING PLC

 

POSITIVE INITIAL DRILLING RESULTS

 

 SPRING HILL GOLD PROJECT (NT)

 

Dated: 8 August 2012

 

Initial assay results of up to 12 grams per tonne gold have been reported for the new 2012 drilling program for Thor Mining PLC's ("Thor") (AIM, ASX: THR) Spring Hill gold project south of Darwin in Australia's Northern Territory. 

The assays are from only the beginning of the drillholes - part of a three pronged approach by Thor in 2012 to test different gold resource options presenting at Spring Hill.

The results, tabulated below, are from near surface Reverse Circulation (RC) pre-collar portions of the holes, all of which are being extended by diamond drilling, and include the following highlights:.

SHDD008A 11.0m @ 5.1 grams/tonne (g/t) gold (Au) from 65 metres

including 6.0m @ 10.2g/t Au from 66.0m

• SHDD011 59.0m @ 1.4g/t Au from 1.0m

including 1.0m @ 12.4g/t Au from 51.0m

26.0m @ 0.7g/t Au from 71.0m

• SHDD012 5.0m @ 0.6g/t Au from 59.0m

·; Down hole intervals only - refer Table 1 for estimated true widths

 

Diamond drilling extensions for each hole will provide core for the main target area of each hole. The diamond tail for the deep Callie hole extending from SHDD009's pre-collar is nearing completion at more than 900 metres depth. Core logging and assay is progressing close behind the drilling with an update on results due soon.

 

The program objectives include testing: 

1. Mineralisation below Spring Hill's main existing Hong Kong lode (completion of 2011 program);

2. Callie style mineralisation at depth beneathSpring Hill; and

3. Satellite targets to the main Spring Hill resource, likely to be completed in a separate RC drill program later in the season, following receipt of regulatory approvals.

 

1. Further Hong Kong Mineralisation

 

On the basis of the 2011 drilling results,part of the 2012 drilling program is directed to test the overall continuity of the gold mineralising system below the known Hong Kong lode. As a result, the 2012 holes will aim deeper and have a broader spacing than 2011. Three holes are planned for this component ofthe program totalling 1,050 metres, with the first 100 metres of each hole using reverse circulation (RC) drilling, and the deeper portion with diamond drilling. The drill target zone has been selected to correspond with the strongest Hong Kong mineralisation. It is the assays from the RC portion of this drilling, intersecting gold mineralisation of the Main and Central Lodes, to the east of the target Hong Kong Lode that are reported in this announcement.

 

2. Callie Mineralisation Model

The Spring Hill gold deposit is potentially an indicator of more substantial mineralisation at depth. The structural and stratigraphic setting of the >5Moz Callie deposit in the Northern Territory Tanami region is analogous to the neighbouring >1Moz Cosmo Howley gold deposit. This geological setting comprises a sheeted vein system which may also exist deeper in the anticline, physically below the Spring Hill deposit and has the potential for substantial gold mineralisation.

The Callie mineralisation model which is a separate deposit in a separate but related setting, is targeted as part of Thor's 2012 Spring Hill drilling program.

One deep (900m) diamond drill hole is being drilled, with 150 metres RC precollar (SHDD009).

 

3. Satellite Targets

 

Satellite targets' comprising lightly explored occurrences of gold mineralisation in several locations in proximity to the main Spring Hill resource, are planned to be drill-tested in a separate RC drill program later in the season, following receipt of regulatory approvals.

 

Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said,

 

"We are delighted with this early level of mineralisation in the near surface sections of our drilling. While our main targets are below the areas drilled thus far, the extensive gold mineralisation above and east of these is very welcome."

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Gerry Beaney/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters/

Emma Wigan

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

 

Competent Person statement -

 

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

 

Table 1: Pre collar RC Drill results

Hole id

North Local/

GDA

East

Local/

GDA

RL Local/

GDA

Azimuth

 

Dip

Hole Depth

(m)

From

(m)

Interval

(m)

True Width

Au g/t

SHDD008

9700/ 8494010

9871/

794216

1234/

247

245

-65

89

30.0

1.0

0.20

All Holes are RC Pre-collars only, diamond tails yet to be drilled.

45.0

1.0

0.26

71.0

1.0

0.28

SHDD008A

9700/ 8494010

9873/ 794218

1234/

247

245

-75

101

2.0

1.0

0.26

45.0

1.0

5.35

52.0

1.0

0.24

65.0

11.0

7.5

5.07

including

66.0

5.0

4

10.22

77.0

1.0

0.23

90.0

1.0

0.42

SHDD008B

9698/

8494009

9873/

794219

1234/

247

245

-70

119

39.0

1.0

0.20

45.0

1.0

0.22

54.0

1.0

0.55

61.0

1.0

1.27

68.0

2.0

1.5

0.40

SHDD009

10025/

8494416

10124/

794286

1240/

253

245

-75

150

0.0

1.0

0.60

72.0

1.0

0.20

78.0

1.0

0.20

85.0

1.0

0.26

89.0

1.0

0.63

104.0

1.0

0.37

120.0

1.0

0.35

124.0

2.0

0.58

128.0

1.0

0.21

130.0

1.0

0.32

133.0

5.0

3.5

0.72

including

133.0

1.0

2.32

SHDD010

9650/

8493973

9886/

794253

1240/

253

245

-70

115

41.0

1.0

0.82

52.0

1.0

0.26

61.0

2.0

1.5

0.39

71.0

2.0

1.5

0.72

SHDD011

9758/

8493996

9732/

794066

1209/

232

245

-80

111

1.0

59.0

24

1.36

including

3.0

1.0

3.05

and

7.0

1.0

2.99

and

23.0

1.0

2.37

and

37.0

2.0

1.5

2.29

and

45.0

1.0

2.44

and

51.0

1.0

12.37

and

53.0

1.0

3.11

and

59.0

1.0

2.16

68.0

2.0

1.5

0.27

71.0

26.0

16

0.69

99.0

1.0

0.22

101.0

9.0

6

0.37

SHDD012

9575/

8493843

9751/

794170

1175/

188

245

-80

75

0.0

2.0

0.23

7.0

1.0

0.20

14.0

3.0

2.5

0.36

25.0

1.0

0.24

47.0

1.0

0.31

57.0

1.0

0.26

59.0

5.0

4.5

0.63

66.0

1.0

0.23

72.0

3.0

2

0.33

 

 

Intersection selection criteria:

·; Intersections are calculated using 0.2 g/t gold cutoff with a minimum interval of 2 metres and maximum of 2 metres internal dilution

·; High grade intersections (shown in bold) are calculated using 2 g/t gold cutoff with a maximum of 2 metres internal dilution

·; 'Interval' refers to the down-hole length of intersection

·; 'True width' is estimated from the outline of mineralisation interpreted on the relevant cross section

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBKFDKBBKKFFK
Date   Source Headline
9th Dec 20217:00 amRNSCommencement of Kapunda Copper Recovery Trials
7th Dec 20217:00 amRNSMolyhil Third Drillhole Intercepts Mineralisation
25th Nov 20219:15 amRNSIssue of Equity
23rd Nov 20217:00 amRNSOver 45m of Mineralisation Intercepted at Molyhil
22nd Nov 20218:45 amRNSDirector/PDMR Shareholding
16th Nov 20217:32 amRNSStage 1 Earn-in Completed at Alford East
11th Nov 202110:02 amRNSHolding(s) in Company
10th Nov 20211:04 pmRNSResult of AGM
10th Nov 202110:00 amRNSAGM Statement
8th Nov 20217:00 amRNSCommencement of Drilling at Molyhil Project
1st Nov 20217:00 amRNSSale Option Exercised for $1.8m at Pilot Mountain
29th Oct 20217:02 amRNSQuarterly Activity Report July to September 2021
25th Oct 20217:00 amRNSAlford East Presentation
18th Oct 20217:00 amRNSHydrogeology Results
12th Oct 20218:29 amRNSNotice of AGM
11th Oct 20217:00 amRNSRC Drilling Program Commences at Ragged Range
7th Oct 20217:00 amRNSNew Gold Assays Define Drill Ready Targets
4th Oct 20217:00 amRNSBoard Change
30th Sep 20211:11 pmRNSResults for the year ended 30 June 2021
30th Sep 20217:40 amRNSInvestor Presentation
17th Sep 20218:24 amRNSInvestor Presentation
17th Sep 20217:00 amRNSKapunda Drilling
15th Sep 20217:14 amRNSExercise of Options
13th Sep 20214:40 pmRNSSecond Price Monitoring Extn
13th Sep 20214:35 pmRNSPrice Monitoring Extension
13th Sep 20212:05 pmRNSSecond Price Monitoring Extn
13th Sep 20212:00 pmRNSPrice Monitoring Extension
13th Sep 20217:00 amRNSBoard Change
2nd Sep 20218:05 amRNSDirector Resignation
31st Aug 202111:45 amRNSSale Option - Pilot Mountain Project
31st Aug 20217:00 amRNSTotal Voting Rights
31st Aug 20217:00 amRNSAlford East Drilling Results
25th Aug 20217:00 amRNSCompletion of initial drilling program and results
11th Aug 20217:00 amRNSStrategic Placement
2nd Aug 20217:00 amRNSAppointment of Exploration Manager
30th Jul 20217:00 amRNSInvestor Presentation
27th Jul 20217:00 amRNSQuarterly Report April to June 2021
29th Jun 20217:00 amRNSPreliminary Drilling Results at Alford East, SA
25th Jun 20219:17 amRNSIssue of Warrants
23rd Jun 20217:00 amRNSExploration Update: Ragged Range, WA
10th Jun 20217:01 amRNSISR Explanatory Video
10th Jun 20217:00 amRNSDrilling Commences at Alford East
3rd Jun 20217:00 amRNSGrant funding for Molyhil
28th May 20217:00 amRNSDirector/PDMR Shareholding
25th May 20219:30 amRNSReplacement: Issue of Equity
25th May 20217:00 amRNSIssue of Equity
20th May 20217:00 amRNSSouth Australian Government Funding A$300,000
6th May 20217:00 amRNSInvestor Presentation
30th Apr 20217:00 amRNSQuarterly Report January to March 2021
27th Apr 20218:42 amRNSReplacement: Managing Director Appointment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.