Less Ads, More Data, More Tools Register for FREE

Pin to quick picksThor Energy Regulatory News (THR)

Share Price Information for Thor Energy (THR)

Share Price is delayed by 15 minutes
Get Live Data
0.55    0.00 (0.00%)
Bid:
0.50
Ask:
0.60
Spread: 0.10 (20.00%)
Market Cap: £5.67m
THR Live PriceLast checked at - London Stock Exchange

Intraday Thor Energy Share Chart

Positive Initial Drilling Results - Spring Hill

8 Aug 2012 07:00

RNS Number : 5439J
Thor Mining PLC
08 August 2012
 



THOR MINING PLC

 

POSITIVE INITIAL DRILLING RESULTS

 

 SPRING HILL GOLD PROJECT (NT)

 

Dated: 8 August 2012

 

Initial assay results of up to 12 grams per tonne gold have been reported for the new 2012 drilling program for Thor Mining PLC's ("Thor") (AIM, ASX: THR) Spring Hill gold project south of Darwin in Australia's Northern Territory. 

The assays are from only the beginning of the drillholes - part of a three pronged approach by Thor in 2012 to test different gold resource options presenting at Spring Hill.

The results, tabulated below, are from near surface Reverse Circulation (RC) pre-collar portions of the holes, all of which are being extended by diamond drilling, and include the following highlights:.

SHDD008A 11.0m @ 5.1 grams/tonne (g/t) gold (Au) from 65 metres

including 6.0m @ 10.2g/t Au from 66.0m

• SHDD011 59.0m @ 1.4g/t Au from 1.0m

including 1.0m @ 12.4g/t Au from 51.0m

26.0m @ 0.7g/t Au from 71.0m

• SHDD012 5.0m @ 0.6g/t Au from 59.0m

·; Down hole intervals only - refer Table 1 for estimated true widths

 

Diamond drilling extensions for each hole will provide core for the main target area of each hole. The diamond tail for the deep Callie hole extending from SHDD009's pre-collar is nearing completion at more than 900 metres depth. Core logging and assay is progressing close behind the drilling with an update on results due soon.

 

The program objectives include testing: 

1. Mineralisation below Spring Hill's main existing Hong Kong lode (completion of 2011 program);

2. Callie style mineralisation at depth beneathSpring Hill; and

3. Satellite targets to the main Spring Hill resource, likely to be completed in a separate RC drill program later in the season, following receipt of regulatory approvals.

 

1. Further Hong Kong Mineralisation

 

On the basis of the 2011 drilling results,part of the 2012 drilling program is directed to test the overall continuity of the gold mineralising system below the known Hong Kong lode. As a result, the 2012 holes will aim deeper and have a broader spacing than 2011. Three holes are planned for this component ofthe program totalling 1,050 metres, with the first 100 metres of each hole using reverse circulation (RC) drilling, and the deeper portion with diamond drilling. The drill target zone has been selected to correspond with the strongest Hong Kong mineralisation. It is the assays from the RC portion of this drilling, intersecting gold mineralisation of the Main and Central Lodes, to the east of the target Hong Kong Lode that are reported in this announcement.

 

2. Callie Mineralisation Model

The Spring Hill gold deposit is potentially an indicator of more substantial mineralisation at depth. The structural and stratigraphic setting of the >5Moz Callie deposit in the Northern Territory Tanami region is analogous to the neighbouring >1Moz Cosmo Howley gold deposit. This geological setting comprises a sheeted vein system which may also exist deeper in the anticline, physically below the Spring Hill deposit and has the potential for substantial gold mineralisation.

The Callie mineralisation model which is a separate deposit in a separate but related setting, is targeted as part of Thor's 2012 Spring Hill drilling program.

One deep (900m) diamond drill hole is being drilled, with 150 metres RC precollar (SHDD009).

 

3. Satellite Targets

 

Satellite targets' comprising lightly explored occurrences of gold mineralisation in several locations in proximity to the main Spring Hill resource, are planned to be drill-tested in a separate RC drill program later in the season, following receipt of regulatory approvals.

 

Commenting, Mr Mick Billing, Executive Chairman of Thor Mining, said,

 

"We are delighted with this early level of mineralisation in the near surface sections of our drilling. While our main targets are below the areas drilled thus far, the extensive gold mineralisation above and east of these is very welcome."

 

Enquiries:

 

Mick Billing

+61 (8) 7324 1935

 

Thor Mining PLC

Executive Chairman

Allan Burchard

+61 (8) 7324 1935

 

Thor Mining PLC

CFO/Company Secretary

Gerry Beaney/ David Hignell

+44 (0) 207 383 5100

 

Grant Thornton Corporate Finance

 

Nominated Adviser

Nick Emerson/

Renato Rufus

+44 (0) 1483 413500

Simple Investments

Broker

Alex Walters/

Emma Wigan

+44 (0) 7771 713608

+44 (0) 207 839 9260

Cadogan PR

Financial PR

 

Competent Person statement -

 

The information in this report that relates to exploration results is based on information compiled by Richard Bradey, who holds a BSc in applied geology and an MSc in natural resource management and who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Bradey is an employee of Thor Mining PLC. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Richard Bradey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

 

 

Updates on the Company's activities are regularly posted on Thor's website www.thormining.com, which includes a facility to register to receive these updates by email.

 

Table 1: Pre collar RC Drill results

Hole id

North Local/

GDA

East

Local/

GDA

RL Local/

GDA

Azimuth

 

Dip

Hole Depth

(m)

From

(m)

Interval

(m)

True Width

Au g/t

SHDD008

9700/ 8494010

9871/

794216

1234/

247

245

-65

89

30.0

1.0

0.20

All Holes are RC Pre-collars only, diamond tails yet to be drilled.

45.0

1.0

0.26

71.0

1.0

0.28

SHDD008A

9700/ 8494010

9873/ 794218

1234/

247

245

-75

101

2.0

1.0

0.26

45.0

1.0

5.35

52.0

1.0

0.24

65.0

11.0

7.5

5.07

including

66.0

5.0

4

10.22

77.0

1.0

0.23

90.0

1.0

0.42

SHDD008B

9698/

8494009

9873/

794219

1234/

247

245

-70

119

39.0

1.0

0.20

45.0

1.0

0.22

54.0

1.0

0.55

61.0

1.0

1.27

68.0

2.0

1.5

0.40

SHDD009

10025/

8494416

10124/

794286

1240/

253

245

-75

150

0.0

1.0

0.60

72.0

1.0

0.20

78.0

1.0

0.20

85.0

1.0

0.26

89.0

1.0

0.63

104.0

1.0

0.37

120.0

1.0

0.35

124.0

2.0

0.58

128.0

1.0

0.21

130.0

1.0

0.32

133.0

5.0

3.5

0.72

including

133.0

1.0

2.32

SHDD010

9650/

8493973

9886/

794253

1240/

253

245

-70

115

41.0

1.0

0.82

52.0

1.0

0.26

61.0

2.0

1.5

0.39

71.0

2.0

1.5

0.72

SHDD011

9758/

8493996

9732/

794066

1209/

232

245

-80

111

1.0

59.0

24

1.36

including

3.0

1.0

3.05

and

7.0

1.0

2.99

and

23.0

1.0

2.37

and

37.0

2.0

1.5

2.29

and

45.0

1.0

2.44

and

51.0

1.0

12.37

and

53.0

1.0

3.11

and

59.0

1.0

2.16

68.0

2.0

1.5

0.27

71.0

26.0

16

0.69

99.0

1.0

0.22

101.0

9.0

6

0.37

SHDD012

9575/

8493843

9751/

794170

1175/

188

245

-80

75

0.0

2.0

0.23

7.0

1.0

0.20

14.0

3.0

2.5

0.36

25.0

1.0

0.24

47.0

1.0

0.31

57.0

1.0

0.26

59.0

5.0

4.5

0.63

66.0

1.0

0.23

72.0

3.0

2

0.33

 

 

Intersection selection criteria:

·; Intersections are calculated using 0.2 g/t gold cutoff with a minimum interval of 2 metres and maximum of 2 metres internal dilution

·; High grade intersections (shown in bold) are calculated using 2 g/t gold cutoff with a maximum of 2 metres internal dilution

·; 'Interval' refers to the down-hole length of intersection

·; 'True width' is estimated from the outline of mineralisation interpreted on the relevant cross section

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBKFDKBBKKFFK
Date   Source Headline
25th Mar 20191:27 pmRNSClearance for Drilling - Bonya Tungsten
8th Mar 20197:00 amRNSCopper Project Q & A - March 2019
5th Mar 20199:22 amRNSStrategic Development: Australian Copper Interests
28th Feb 201912:31 pmRNSHalf-year Report
4th Feb 20197:00 amRNSBonya Rock Chip Assays
1st Feb 201912:04 pmRNSAppointment of Joint Broker
31st Jan 20197:00 amRNSAPPENDIX 5B OCTOBER TO DECEMBER 2018
30th Jan 201911:10 amRNSQUARTERLY REPORT OCTOBER TO DECEMBER 2018
8th Jan 20198:20 amRNSInvestor Presentation
18th Dec 20187:00 amRNSKapunda Copper Project Proof of Concept
13th Dec 20188:20 amRNSPilot Mountain Increased Mineral Resource Estimate
10th Dec 20189:47 amRNSAppendix 3B
5th Dec 20187:05 amRNSExercise of Warrants
5th Dec 20187:00 amRNSAppendix 3B
30th Nov 20187:00 amRNSAnnual General Meeting Presentation
30th Nov 20187:00 amRNSHolding(s) in Company
28th Nov 20183:30 pmRNSExercise of Warrants
28th Nov 201810:17 amRNSResult of AGM
26th Nov 20184:40 pmRNSSecond Price Monitoring Extn
26th Nov 20184:35 pmRNSPrice Monitoring Extension
26th Nov 20182:05 pmRNSSecond Price Monitoring Extn
26th Nov 20182:00 pmRNSPrice Monitoring Extension
26th Nov 20187:00 amRNSBonya Copper Maiden Resource Estimate
23rd Nov 20189:35 amRNSAppendix 3B
21st Nov 20189:59 amRNSIssue of Equity
20th Nov 20187:00 amRNSAppointment of Corporate Advisor - Molyhil
9th Nov 20187:00 amRNSAppendix 3B
5th Nov 20189:09 amRNSExercise of Warrants
2nd Nov 20187:00 amRNSAppendix 3B
31st Oct 20187:00 amRNSQUARTERLY REPORT JULY TO SEPTEMBER 2018
31st Oct 20187:00 amRNSAPPENDIX 5B JULY TO SEPTEMBER 2018
30th Oct 20187:00 amRNSWarrant Exercise - Director Dealing
29th Oct 20187:40 amRNSResearch Report
5th Oct 20189:43 amRNSAppendix 3B
4th Oct 201810:14 amRNSIssue of Shares for Bonya Acquisition
24th Sep 201811:02 amRNSBonya Licence Transfer Approved
21st Sep 201812:00 pmRNSFinal Results
11th Sep 20188:39 amRNSUS Lithium - Update on Sale Process
7th Sep 20188:48 amRNSPilot Mountain Scoping Study
28th Aug 20187:01 amRNSKapunda Project Laboratory Copper Extraction
23rd Aug 20187:15 amRNSUpgraded Definitive Feasibility Study - Molyhil
21st Aug 201811:05 amRNSSecond Price Monitoring Extn
21st Aug 201811:00 amRNSPrice Monitoring Extension
21st Aug 20187:00 amRNSTrading Halt on the ASX
6th Aug 20183:15 pmRNSUS Lithium Investment Update
6th Aug 201812:17 pmRNSAppendix 3B
6th Aug 20187:00 amRNSAppointment of Joint Broker
1st Aug 20189:40 amRNSAPPENDIX 5B TO QUARTERLY REPORT APRIL TO JUNE 2018
1st Aug 20189:19 amRNSQUARTERLY REPORT APRIL TO JUNE 2018
31st Jul 20187:00 amRNSExercise of warrants

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.