The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSovereign Metals Regulatory News (SVML)

Share Price Information for Sovereign Metals (SVML)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 26.50
Bid: 26.00
Ask: 27.00
Change: 0.00 (0.00%)
Spread: 1.00 (3.846%)
Open: 26.50
High: 26.50
Low: 26.50
Prev. Close: 26.50
SVML Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kasiya's Graphite Warming Potential Amongst Lowest

15 Mar 2023 07:00

RNS Number : 9972S
Sovereign Metals Limited
15 March 2023
 

SOVEREIGN METALS LIMITED

 

NEWS RELEASE I 15 MARCH 2023

 

KASIYA'S GRAPHITE GLOBAL WARMING POTENTIAL TO BE AMONGST LOWEST IN THE WORLD

·

Independent benchmarking indicates Sovereign's graphite co-product from Kasiya should have significantly lower global warming potential versus current and developing natural graphite projects

·

Global warming potential (GWP) of producing one tonne of flake graphite concentrate at Kasiya estimated to be 0.2 tonnes of CO2 equivalent emissions (CO2e)

·

Kasiya has the lowest GWP compared with currently known and planned future natural graphite projects:

Up to 60% lower than currently reported GWP of graphite producers and developers, including suppliers to Tesla Inc.

3x less polluting than proposed Tanzanian natural graphite production from hard rock sources

6x less polluting than current Chinese natural graphite production which accounts for up to 80% of current global graphite supply

·

In 2022, the lithium-ion battery market became the biggest end-market for natural flake graphite

·

Despite graphite being only a co-product to future potential rutile production, Kasiya is still one of the largest and potentially lowest production cost flake graphite resources in the world as it is hosted in soft and friable saprolite material instead of hard rock

·

Mining is planned to be via hydro-methods (high-powered water monitors) with the operation powered almost 100% by renewable sources (hydro-generated grid and on-site solar power)

·

Previously, Sovereign had announced that its primary product of natural rutile is expected to have a GWP of only 0.1 tonnes CO2e - up to 97% lower than alternative titanium feedstocks produced by upgrading ilmenite

 

Sovereign Metals Limited (ASX: SVM, AIM: SVML) (the Company or Sovereign) is pleased to announce the combined results of internal company analysis, supplemented with an independent benchmarking study by UK-based consultancy Minviro Ltd (Minviro) which compared the global warming potential (GWP) of producing natural flake graphite from the Kasiya Project (Kasiya or the Project) against relevant current and future natural graphite projects.

 

The cradle-to-gate life cycle assessment (LCA) was carried out by Minviro comparing current natural graphite production from China which produces almost 80% of the world's natural graphite, and proposed near-term production from Tanzania, which offers a regional benchmark against Kasiya in Malawi. The LCA study followed ISO 14067:2008 guidelines and was critically reviewed by a panel of three independent experts.

 

A number of graphite producers and explorers/developers have conducted their own LCAs, with conclusions of a select number being made public. Kasiya's graphite product currently has the lowest GWP of publicly reported current and future potential graphite production.

 

The benchmarking study found that the total GWP of 0.2 tonnes CO2e per tonne of natural flake graphite concentrate produced at Kasiya is significantly lower than the total GWP per tonne produced in Heilongjiang Province, China (1.2 tonnes CO2e) and the total GWP per tonne produced in Tanzania (0.6 tonnes CO2e).

 

Sovereign's Managing Director, Dr Julian Stephens, commented: "It is remarkable that our graphite co-product from planned rutile production at Kasiya will not only be potentially one of the lowest cost flake graphite projects in the world but now can also be considered to have one of the lowest global warming potentials of current and future graphite mines. Producers and users of lithium-ion batteries are already taking note of the carbon footprint associated with the raw materials that feed into battery technology - so to be developing Kasiya at this time is truly exciting."

 

Minviro's LCA has already previously shown the potential for Sovereign's primary product of natural rutile to significantly reduce the carbon footprint of the titanium pigment industry.

 

Each tonne of natural rutile produced at Kasiya is expected to have a Global Warming Potential of only 0.1 tonnes CO2 eq., which equates to a 95% to 97% reduction in total greenhouse gas emissions (20 to 33 times less) compared to production of titania slag and synthetic rutile respectively - both of which are alternative titanium feedstocks produced by upgrading ilmenite via energy and carbon intensive processes.

 

ENQUIRIES

 

Dr Julian Stephens (Perth)Managing Director

+61(8) 9322 6322

Sam Cordin (Perth)+61(8) 9322 6322

Sapan Ghai (London)+44 207 478 3900

 

 

Nominated Adviser on AIM

 

RFC Ambrian

 

Bhavesh Patel / Andrew Thomson

+44 20 3440 6800

 

 

Joint Brokers

 

Berenberg

+44 20 3207 7800

Matthew Armitt

 

Jennifer Lee

 

 

 

Optiva Securities

+44 20 3137 1902

Daniel Ingram

 

Mariela Jaho

 

Christian Dennis

 

 

Why is Kasiya's Graphite able to achieve such a low carbon-footprint?

 

The GWP for Kasiya's flake graphite product was based on information in the Kasiya Scoping Study from December 2021. This was followed up with an Expanded Scoping Study in June 2022 (see announcement here: http://www.investi.com.au/api/announcements/svm/c6f18bca-8aa.pdf). The significantly lower GWP for Kasiya graphite is due to the fact that it is hosted in soft, friable saprolite material which will be mined via hydro methods (high pressure water monitors) powered by renewable energy sources - hydro power from the Malawi grid and on-site solar power. This is opposed to the production in Heilongjiang Province, China where hard-rock ore requires drilling, blasting, excavation, trucking, crushing, and grinding - overall high CO2e activities.

 

About Kasiya's Graphite

 

The Kasiya discovery in central Malawi is the largest natural rutile deposit and one of the largest flake graphite deposits in the world.

 

The lithium-ion battery sector is the main emerging market for flake graphite. Greater capacity batteries, such as those required for electric vehicles, are expected to drive significant demand for graphite over the coming years. It is forecast the battery sector will become the largest graphite market segment by 2028.

 

Kasiya will be a simple and conventional operation using traditional and well-developed processes used across the globe on numerous mineral sands and graphite operations.

 

The proposed large-scale operation will process soft, friable mineralisation that occurs from surface in an area with excellent access and water availability. The Project has high quality surrounding infrastructure including hydro-sourced grid power, bitumen roads and recently upgraded rail lines connecting to the deep water of ports of Nacala and Beira on the Indian Ocean.

 

Forward Looking Statement

 

This release may include forward-looking statements, which may be identified by words such as "expects", "anticipates", "believes", "projects", "plans", and similar expressions. These forward-looking statements are based on Sovereign's expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of Sovereign, which could cause actual results to differ materially from such statements. There can be no assurance that forward-looking statements will prove to be correct. Sovereign makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

 

Competent Persons Statement

 

The information in this announcement that relates to the Mineral Resource Estimate is extracted from the announcement dated 5 April 2022. The announcement is available to view on www.sovereignmetals.com.au. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the announcement; b) all material assumptions included in the announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this report have not been materially changed from the announcement.

 

The information in this announcement that relates to Production Targets, Processing, Infrastructure and Capital and Operating Costs, is extracted from the announcement dated 16 December 2021 entitled 'Kasiya Scoping Study Confirms Globally Significant Natural Rutile Project' (Announcement). Sovereign confirms that: a) it is not aware of any new information or data that materially affects the information included in the announcement; b) all material assumptions and technical parameters underpinning the Production Target, and related forecast financial information derived from the Production Target included in the Announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this presentation have not been materially modified from the Announcement.

 

The information in this announcement that relates to Metallurgy is extracted from the announcement dated 7 December 2021. The announcement is available to view on www.sovereignmetals.com.au. Sovereign confirms that a) it is not aware of any new information or data that materially affects the information included in the announcement; b) all material assumptions included in the announcement continue to apply and have not materially changed; and c) the form and context in which the relevant Competent Persons' findings are presented in this report have not been materially changed from the announcement.

 

To view this announcement in full, including all figures and illustrations, please refer to http://www.investi.com.au/api/announcements/svm/61a82ede-fa0.pdf.

 

Table 1: Kasiya Mineral Resource Estimate at 0.7% Rutile Cut-off

 

 

Mineral Resource Category

Material Tonnes (millions)

Rutile(%)

Rutile Tonnes (millions)

Total Contained Graphite (TGC) (%)

TGC Tonnes (millions)

RutEq. Grade* (%)

Indicated

662

1.05%

6.9

1.43%

9.5

1.76%

Inferred

1,113

0.99%

11.0

1.26%

14.0

1.61%

Total

1,775

1.01%

18.0

1.32%

23.4

1.67%

* RutEq. Formula: Rutile Grade x Recovery (98%) x Rutile Price (US$1,308/t) + Graphite Grade x Recovery (62%) x Graphite Price (US$1,085/t) / Rutile Price (US$1,308/t). All assumptions are taken from this Study ** Any minor summation inconsistencies are due to rounding.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCJAMTTMTBBMRJ
Date   Source Headline
1st May 20247:00 amRNSIncreased Graphite Bulk Sample Capacity
30th Apr 20247:00 amRNSMarch 2024 Quarterly Report
23rd Apr 20247:00 amRNSGraphite Expert Appointed to Development Team
15th Apr 20247:00 amRNSSustainable Farming on Target to Triple Crop Yield
12th Apr 20247:00 amRNSIssue of Performance Rights
28th Mar 20247:00 amRNSChange of Director’s Interest Notice
27th Mar 20247:00 amRNSFollow-Up Drilling Initiated North of Kasiya
20th Mar 20249:57 amRNSRepresentative Bulk Sample Shipped
19th Mar 20247:00 amRNSAppointment of Stifel as Joint Broker
13th Mar 20247:00 amRNSHalf-Year Accounts
1st Mar 20247:00 amRNSCapabilities Strengthened with Key Appointments
26th Feb 20247:00 amRNSCommissioning of Sustainable Farming Initiative
15th Feb 20247:00 amRNSAppointment of Experienced ESG Officer
5th Feb 20247:00 amRNSInvestor Presentation
1st Feb 20247:00 amRNSExtensions To Rutile & Graphite Mineralisation
31st Jan 20247:00 amRNSDecember 2023 Quarterly Report
23rd Jan 20247:00 amRNSExperienced Social Specialist Firm Appointed
27th Nov 20237:00 amRNSCompany Presentation
24th Nov 20237:00 amRNSResult of AGM
2nd Nov 20237:00 amRNSLithium-Ion Battery Graphite Program Upscaled
31st Oct 20237:00 amRNSSeptember 2023 Quarterly Report
20th Oct 20237:00 amRNSInitial Director’s Interest Notice
18th Oct 20237:00 amRNSNotice of AGM
16th Oct 20237:00 amRNSKey Mgmt Appointments for Development at Kasiya
11th Oct 20237:00 amRNSKasiya Pre-Feasibility Study Results Presentation
29th Sep 20237:00 amRNSIssue of Shares and AGM Date
29th Sep 20237:00 amRNSAnnual Report 2023
28th Sep 20237:00 amRNSKasiya Pre-Feasibility Study Results
25th Aug 20237:00 amRNSIssue of Shares
23rd Aug 20237:00 amRNSResults of Meeting
16th Aug 20238:24 amRNSNotice of Change of Interest of Substantial Holder
28th Jul 202310:49 amRNSNotice of Change of Interest of Substantial Holder
28th Jul 20237:00 amRNSJune 2023 Quarterly Report
25th Jul 202311:01 amRNSNotice of Substantial Holder
21st Jul 20237:00 amRNSNotice of GM
17th Jul 20237:00 amRNSRio to Invest $40.4m to Become Strategic Investor
21st Jun 20237:00 amRNSChange of AIM Nominated Adviser
20th Jun 20237:00 amRNSGraphite Bulk Sample Operations Commenced
8th Jun 20237:00 amRNSKasiya Graphite for use in Lithium ion Batteries
6th Jun 20237:00 amRNSLapse of Performance Rights
16th May 20237:00 amRNSExpiry of Unlisted Options
28th Apr 20237:00 amRNSMarch 2023 Quarterly Report
5th Apr 20237:00 amRNSKasiya Indicated Resource Increased By Over 80%
20th Mar 20237:00 amRNSDemerger Timetable
17th Mar 20237:00 amRNSResult of Meeting
15th Mar 20237:00 amRNSKasiya's Graphite Warming Potential Amongst Lowest
14th Mar 20237:00 amRNSHalf-year Report
15th Feb 20237:00 amRNSNotice of General Meeting
6th Feb 20237:00 amRNSCompany Presentation
31st Jan 20237:00 amRNSDecember 2022 Quarterly Report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.