Charles Jillings, CEO of Utilico, energized by strong economic momentum across Latin America. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSteppe Cement Regulatory News (STCM)

Share Price Information for Steppe Cement (STCM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 19.00
Bid: 18.00
Ask: 20.00
Change: 0.00 (0.00%)
Spread: 2.00 (11.111%)
Open: 19.00
High: 19.00
Low: 19.00
Prev. Close: 19.00
STCM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Market Update

15 Dec 2005 07:00

Steppe Cement Limited15 December 2005 Steppe Cement Limited Market Update on Proposals to Expand Production Capacity and Financing - 15 December 2005 The directors of Steppe Cement are pleased to update the market on proposals torefurbish the Company's two dry-process clinker production kilns. Clinker Production Capacity Since admission to AIM in September 2005, the Company has continued to operateits four wet-process kilns (numbers 1 to 4) which have a combined annual clinkerproduction capacity of 600,000 tonnes. At the same time the Company hasprogressed with studies to recommence production from its two dry-process kilns(numbers 5 and 6) which have been mothballed since 1995. Each of the dry-process kilns had a clinker production capacity of 1 milliontonnes per annum prior to them being mothballed. The findings of the studies into the dry-process lines and proposals of theCompany arising there from are: Line number 5 which was commissioned in 1975, had some design faults thatrequire the cyclones, kiln and cooler to be rebuilt. The Company proposes tomaintain the crushers, raw materials, coal and cement mills. Filters and controlequipment will be upgraded to western standards. It is anticipated that thissubstantial refurbishment will cost US$73 million inclusive of interest andtaxes during construction and will take 18 to 24 months to complete. The companyhas tendered 3 out of 9 packages and it expects that the kiln will bere-commissioned before the end of 2007. It will have a capacity of 1 milliontons of clinker (1.3 million tons cement). Line number 6 was commissioned in 1983 with an improved design from that used onthe number 5 line and the Company has been advised by its technical consultantsthat it can be refurbished and re-commissioned at a cost estimated atapproximately US$20 million. A project management team has been recruited toundertake this project and work has commenced. Present estimates are that thiswork will be unlikely to be completed before the winter of 2006/7 Onre-commissioning the number 6 line will have a maximum design capacity of 0.8million tons per annum of clinker (1.0 million tons of cement). Financing Proposals for the Expansion of Production Capacity: EBRD loanagreement, proposed bond issue and new equity capitalThe Company has signed a loan agreement with the European Bank forReconstruction and Development (EBRD) whereby EBRD will provide loans of US$35million towards the dry-process kiln refurbishment costs. An agreement has alsobeen signed with Halyk Finance of Kazakhstan, whereby Halyak Finance willdistribute to Kazakh domestic investors two fixed coupon, medium term, Tengedenominated bonds, equivalent in total to US$15 million. The balance required tofinance the two re-furbishment projects, of US$43 million, will be met byinternally generated funds and by a proposed share placing which it isanticipated will raise approximately US$20 million of new equity. The Company has received expressions of interest from several parties wishing tosubscribe to new equity and anticipates that it will complete such an issue nolater than January 2006. The material terms of the two loan facilities are summarised as follows: EBRD (US$35 million principal): Repayment term 10 equal instalments from May2008 to November 2012, establishment fee 1% Front-end plus 0.5% commitment feeon funds not drawn down, coupon LIBOR +3.75%. Halyk Finance (Two tranches of Tenge 1,025 million-equivalent to US$7.5 millioneach principal): Repayment term 5 years, establishment fee 1%, coupon 9%pa. Future Production and Demand During 2005, the shortage of cement production capacity in Kazakhstan was met byimports of 1.5 million tonnes from neighbouring countries. It is anticipated bythe Company that demand will increase further in 2006 and beyond as the KazakhGDP continues to grow in tandem with the increase in production of oil and othercommodities. Kazakhstan's ability to import cement is limited by railwaycapacity and the Company believes that it is vital for the economy of thecountry that it increases its production capacity as quickly as possible. From700,000 tons of cement in 2005 the Company expects to be able to produce 800,000tons in 2006, 1.5 million tons in 2007, and 2.5 million tons in 2008. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
26th Apr 20249:53 amRNSResult of EGM
9th Apr 20249:42 amRNSDirector's Dealing
5th Apr 20247:01 amRNSProposed Return of Cash to Shareholders and EGM
5th Apr 20247:00 amRNSTrading update for the quarter ended 31 March 2024
12th Jan 202410:15 amRNSYear End Trading Update
13th Dec 20239:15 amRNSUpdate re intention to pay a dividend
28th Nov 202311:44 amRNSDirector's Dealing
23rd Nov 20237:41 amRNSDirector's Dealing
11th Oct 20239:44 amRNSMarket Update for the Third Quarter September 2023
20th Sep 202310:19 amRNSDirector's Dealing
19th Sep 20239:00 amRNSHalf-year Report
13th Jul 20237:00 amRNSResult of AGM
12th Jul 20237:00 amRNSMarket Update - First half of 2023
4th Jul 20237:00 amRNSNotice of AGM and Submissions of Questions
9th Jun 20237:00 amRNSAnnual Financial Report
9th Jun 20237:00 amRNSNotice of AGM
13th Apr 20238:00 amRNSMarket update for the quarter ended 31 March 2023
11th Jan 20237:00 amRNSTrading Statement
17th Nov 20224:41 pmRNSSecond Price Monitoring Extn
17th Nov 20224:35 pmRNSPrice Monitoring Extension
10th Nov 20227:00 amRNSDividend Declaration
12th Oct 20227:00 amRNSPurchase of Shares by Substantial Shareholder
12th Oct 20227:00 amRNSPurchase of Shares by Family of Director
7th Oct 20227:00 amRNS3rd Quarter Market Update
26th Sep 20227:00 amRNSHalf-year Report
14th Jul 20227:00 amRNSChange in Holding(s) in Company
14th Jul 20227:00 amRNSResult of AGM
12th Jul 20227:00 amRNSMarket Update - First half of 2022
5th Jul 20227:00 amRNSNotice of AGM and Submissions of Questions
13th Jun 20227:00 amRNSFY2021 Accounts
13th Jun 20227:00 amRNSDividend Proposal and Nomination of Director
13th Jun 20227:00 amRNSNotice of AGM and 2021 Annual Report publication
20th Apr 202210:52 amRNSPurchase of Shares by Substantial Shareholder
13th Apr 20227:00 amRNSMarket Update for quarter ended 31 March 2022
4th Mar 20227:00 amRNSChange in Interests
13th Jan 20227:00 amRNSTrading Update for 2021
12th Nov 20217:00 amRNSStatement re Interim Dividend Policy
8th Oct 20217:00 amRNSSteppe Cement Ltd - 3rd Quarter Results
17th Sep 20217:00 amRNSInterim Results and General Market Update
8th Jul 20217:00 amRNSFinal Dividend FY2020
8th Jul 20217:00 amRNSAGM Results
7th Jul 20217:00 amRNSMarket update for the first half of 2021
7th Jun 20218:01 amRNSFinal Results and Accounts 2020
7th Jun 20218:00 amRNSNotice of AGM + Annual Report 2020
13th Apr 20217:00 amRNSMarket Update for Quarter ended 31 March 2021
19th Feb 20217:00 amRNSHolding(s) in Company
11th Jan 20217:00 amRNSPreliminary Update for the Year ended 31 Dec 2020
29th Oct 20208:00 amRNSDeclaration of Interim Dividend
9th Oct 20207:00 amRNSMarket Update for 3rd Quarter ended 30 Sept 2020
5th Oct 20208:36 amRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.