The next focusIR Investor Webinar takes places on 14th May with guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerabi Regulatory News (SRB)

Share Price Information for Serabi (SRB)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 66.00
Bid: 65.00
Ask: 67.00
Change: 1.50 (2.33%)
Spread: 2.00 (3.077%)
Open: 64.50
High: 66.00
Low: 64.50
Prev. Close: 64.50
SRB Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Robust first quarter for 2023

19 Apr 2023 07:00

Robust first quarter for 2023

Robust first quarter for 2023

Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian-focused gold mining and development company, is pleased to report operational results for the first quarter of 2023 and provide a review of its development and exploration activities.

HIGHLIGHTS

First quarter gold production totalled 8,005 ounces, a 13% improvement on the corresponding quarter in 2022.Plant feed grades were the highest since the third quarter of 2021, benefitting in part from higher grade ore from Coringa. The Coringa mine development continued to progress well with the high grade portion of the ore being transported to Palito and contributing over 2,200 ounces towards the first quarter total.Cash held at 31 March 2023 was US$13.2 million.

Mike Hodgson, CEO of Serabi, commented:

“The Company has started the year with over 8,000 ounces of gold produced during the first quarter, a very satisfying result, and the strong end to the period has carried over onto the start of the second quarter.

“The quarter saw steady mine output from Palito, and the reported average quarterly plant feed grade of 6.49 grammes per tonne (“g/t”) is the highest since the third quarter of 2021. This was a result of better Palito Run of Mine (“ROM”) grades but also some excellent plant feed from the Coringa mine development, which averaged over 9 g/t for the quarter.

“The mine development at the Coringa Project is continuing as planned, and whilst the mine is still very much only a pilot operation, the development grades as we explore and evaluate the orebody have been spectacular. Investors will recall the Coringa mine is operating under a trial mining license which allows the mine to be developed and mined. Ore is brought to surface and stockpiled, with the higher grade portion being trucked to Palito for processing. The plant feed grades have been excellent, and the modest volume of development ore that has come to the Palito Plant has contributed over 2,200 ounces of gold, replacing reduced production from Sao Chico.

“It is an exciting time for the Company and this solid start to 2023 provides an excellent platform for the year ahead. Coringa permitting continues to progress with the imminent completion of the indigenous study (“ECI”). We very much hope the ECI will be positively received by the various government agencies and will result in the award of the installation License (“LI”) in the coming months.”

OPERATIONAL RESULTS

Total production for the first quarter of 2023 was 8,005 ounces. Coringa contributed 2,229 ounces to this total.

Total ore mined from the Palito Complex during the quarter was 29,691 tonnes at 6.33 g/t compared to 38,293 tonnes at 6.20 g/t of gold for the fourth quarter of 2022. Development mining operations at Coringa generated a total of 9,841 tonnes at 7.63 g/t in the quarter.

39,004 tonnes of ROM ore was processed through the Palito plant during the quarter, with an average grade of 6.75 g/t of gold, compared with 42,692 tonnes at 6.01 g/t in the fourth quarter of 2022. This included 7,731 tonnes of Coringa ore at a feed grade of 9.22 g/t gold.

A total of 2,010 metres of horizontal development has been completed at Palito during the quarter, of which 930 metres was ore development. The balance is the ramp, cross cuts and stope preparation development. Horizontal development at Coringa totalled 452 metres, of which 395 metres was in ore.

SUMMARY PRODUCTION STATISTICS FOR 2023 AND 2022
  Qtr 1YTDQtr 1Qtr 2Qtr 3Qtr 4Full Year
2023202320222022202220222022
Group        
Gold production (1)(2) Ounces8,0058,0057,0628,4188,5427,79831,819
Mined oreTonnes41,54641,54640,60644,00846,86342,264173,741
 Gold grade (g/t)6.496.495.956.266.226.016.12
Milled oreTonnes39,00439,00441,35743,48844,86742,692172,404
 Gold grade (g/t)6.756.755.726.436.346.056.14
Palito Complex        
Gold production (1)(2)Ounces5,7765,7767,0628,4187,9727,35530,807
Mined oreTonnes29,69129,69140,60644,00843,18038,293166,087
 Gold grade (g/t)6.336.335.846.266.286.206.15
Milled oreTonnes31,27331,27341,35743,48842,25739,573166,675
 Gold grade (g/t)6.146.145.726.436.306.176.16
Horizontal developmentMetres2,0102,0102,9383,3532,4582,24510,994
Coringa        
Gold production (1)(2)Ounces2,2292,229  5704431,013
Mined oreTonnes9,8419,841  3,6833,9717,654
 Gold grade (g/t)7.637.63  5.464.154.78
Milled oreTonnes7,7317,731  2,6103,1195,729
 Gold grade (g/t)9.229.22  7.004.585.68
Horizontal developmentMetres4524522123026326451,791

(1) The table may not sum due to rounding.

(2) Production numbers are subject to change pending final assay analysis from refineries.

CORINGA UPDATE

The Company provided a full update regarding activities and the status of the Coringa project on 22 March 2023. As noted in that update Brazilian law provides for automatic extension of the trial mining licence or Guia de Utilização (“GUIA”) and the GUIA Operating Licence (“LOG”) if a formal renewal has not been issued at the date of their initial expiry and provided that renewal applications have been submitted prior to the expiry date. The automatic extension period for the GUIA, which is limited to 12 months from the expiry date, currently runs until 8 February 2024 taking account of a previous six month COVID related extension to the original expiry dates for the GUIA and LOG of 8 August 2022.

FINANCE UPDATE

Cash balances at the end of March 2023 were US$13.9 million. This compares with a cash balance of US$7.2 million at the end of December 2022. During the quarter, the Group secured a US$5.0 million loan from Santander Bank in Brazil repayable in February 2024. This ensures that the Group has adequate working capital to repay a similar loan of US$5.0 million that becomes due in May 2023.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018.

The person who arranged for the release of this announcement on behalf of the Company was Clive Line, Director.

Enquiries

SERABI GOLD plcMichael Hodgson t +44 (0)20 7246 6830Chief Executive m +44 (0)7799 473621

Clive Line t +44 (0)20 7246 6830Finance Director m +44 (0)7710 151692

e contact@serabigold.com

www.serabigold.com

BEAUMONT CORNISH LimitedNominated Adviser & Financial AdviserRoland Cornish / Michael Cornish t +44 (0)20 7628 3396

PEEL HUNT LLPJoint UK BrokerRoss Allister t +44 (0)20 7418 9000

TAMESIS PARTNERS LLPJoint UK BrokerCharlie Bendon/ Richard Greenfield t +44 (0)20 3882 2868

CAMARCOFinancial PRGordon Poole / Emily Hall t +44 (0)20 3757 4980

Copies of this announcement are available from the Company's website at www.serabigold.com.

See www.serabigold.com for more information and follow us on twitter @Serabi_Gold

GLOSSARY OF TERMS

The following is a glossary of technical terms:

“Ag”means silver.
“Au”means gold.
“assay”in economic geology, means to analyse the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.
“CIM”means the Canadian Institute of Mining, Metallurgy and Petroleum.
“chalcopyrite”is a sulphide of copper and iron.
“Cu”means copper.
“cut-off grade”the lowest grade of mineralised material that qualifies as ore in a given deposit; rock of the lowest assay included in an ore estimate.
“dacite porphyry intrusive”a silica-rich igneous rock with larger phenocrysts (crystals) within a fine-grained matrixi
“deposit”is a mineralised body which has been physically delineated by sufficient drilling, trenching, and/or underground work, and found to contain a sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable ore body or as containing ore reserves, until final legal, technical, and economic factors have been resolved.
“electromagnetics”is a geophysical technique tool measuring the magnetic field generated by subjecting the sub-surface to electrical currents.
“garimpo”is a local artisanal mining operation
“garimpeiro”is a local artisanal miner.
“geochemical”refers to geological information using measurements derived from chemical analysis.
“geophysical”refers to geological information using measurements derived from the use of magnetic and electrical readings.
“geophysical techniques”include the exploration of an area by exploiting differences in physical properties of different rock types. Geophysical methods include seismic, magnetic, gravity, induced polarisation and other techniques; geophysical surveys can be undertaken from the ground or from the air.
“gossan”is an iron-bearing weathered product that overlies a sulphide deposit.
“grade”is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or parts per billion (ppb).
“g/t”means grams per tonne.
“granodiorite”is an igneous intrusive rock similar to granite.
“hectare” or a “ha”is a unit of measurement equal to 10,000 square metres.
“igneous”is a rock that has solidified from molten material or magma.
“IP”refers to induced polarisation, a geophysical technique whereby an electric current is induced into the sub-surface and the conductivity of the sub-surface is recorded.
“intrusive”is a body of rock that invades older rocks.
“mineralisation”the concentration of metals and their chemical compounds within a body of rock.
“mineralised”refers to rock which contains minerals e.g. iron, copper, gold.
“Mo-Bi-As-Te-W-Sn”Molybdenum-Bismuth-Arsenic-Tellurium-Tungsten-Tin
“monzogranite”a biotite rich granite, often part of the later-stage emplacement of a larger granite body.
“mt”means million tonnes.
“ore”means a metal or mineral or a combination of these of sufficient value as to quality and quantity to enable it to be mined at a profit.
“oxides”are near surface bed-rock which has been weathered and oxidised by long term exposure to the effects of water and air.
“ppm”means parts per million.
“saprolite”is a weathered or decomposed clay-rich rock.
“sulphide”refers to minerals consisting of a chemical combination of sulphur with a metal.
“vein”is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.
“VTEM”refers to versa time domain electromagnetic, a particular variant of time-domain electromagnetic geophysical survey to prospect for conductive bodies below surface.

Assay ResultsAssay results reported within this release include those provided by the Company's own on-site laboratory facilities at Palito and have not yet been independently verified. Serabi closely monitors the performance of its own facility against results from independent laboratory analysis for quality control purpose. As a matter of normal practice, the Company sends duplicate samples derived from a variety of the Company's activities to accredited laboratory facilities for independent verification. Since mid-2019, over 10,000 exploration drill core samples have been assayed at both the Palito laboratory and certified external laboratory, in most cases the ALS laboratory in Belo Horizonte, Brazil. When comparing significant assays with grades exceeding 1 g/t gold, comparison between Palito versus external results record an average over-estimation by the Palito laboratory of 6.7% over this period. Based on the results of this work, the Company's management are satisfied that the Company's own facility shows sufficiently good correlation with independent laboratory facilities for exploration drill samples. The Company would expect that in the preparation of any future independent Reserve/Resource statement undertaken in compliance with a recognised standard, the independent authors of such a statement would not use Palito assay results without sufficient duplicates from an appropriately certificated laboratory.

Forward-looking statementsCertain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identied by their use of terms and phrases such as ‘‘believe’’, ‘‘could’’, “should” ‘‘envisage’’, ‘‘estimate’’, ‘‘intend’’, ‘‘may’’, ‘‘plan’’, ‘‘will’’ or the negative of those, variations or comparable expressions, including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

Qualified Persons StatementThe scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 30 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognizing him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this news release

Date   Source Headline
17th Aug 20227:00 amGNWOperational Update
8th Aug 20227:00 amGNWDirectorate changes - Appointment of new Chairman
1st Aug 20227:00 amGNWHolding(s) in Company
13th Jul 20227:00 amGNWSecond quarter 2022 operational review
5th Jul 20227:00 amGNWDrilling confirms new Porphyry discovery at Matilda
30th Jun 20227:00 amGNWUnaudited First Quarter Results
29th Jun 20227:00 amGNWResults of Annual General Meeting
28th Jun 202212:15 pmGNWAGM Statement
22nd Jun 20227:00 amGNWCoringa Development Update
13th Jun 20227:00 amGNWProduction Update
10th Jun 20227:00 amGNWAudited Results for the year ended 31 December 2021
30th May 20227:00 amGNWTrading Update and Update on Publication of Annual Financial Results
30th May 20227:00 amGNWNotice of AGM and Directorate Change
12th May 20227:00 amGNWCorporate Update
19th Apr 20229:05 amRNSSecond Price Monitoring Extn
19th Apr 20229:00 amRNSPrice Monitoring Extension
19th Apr 20227:00 amGNWFirst quarter operational review
18th Mar 20227:00 amGNWExploration Success Continues at Piaui Prospect
11th Mar 20227:00 amGNWSerabi Gold reports further high-grade intersections from underground development of its Coringa Mine
7th Mar 20227:00 amGNWSerabi Gold Reports Mineral Reserves and Resources for Palito Complex as at 31 December 2021
21st Feb 20227:00 amGNWDiscussion of airborne geophysical survey results over the Sao Domingos tenement and Financial Calendar for 2022
15th Feb 20227:00 amGNWAirborne survey from Sao Domingos delineates continuation of significant magnetic feature and enhance structural understanding
28th Jan 20227:00 amGNWFirst orebody intersected at Coringa mine development
24th Jan 20227:00 amGNWSerabi meets gold production guidance for 2021
6th Jan 20227:00 amGNWSerabi interviewed by BRR Media to discuss high grade exploration drilling results at Palito, as well as Coringa progress
5th Jan 20227:00 amGNWMultiple high grade intercepts into the ‘Chico da Santa’ veins at Palito
22nd Dec 20213:30 pmGNWResults of Extraordinary General Meeting
21st Dec 20217:00 amGNWMultiple high grade intercepts into the undeveloped Gabi Vein at Sao Chico offer significant resource growth potential
16th Dec 20217:00 amGNWArrangements for Extraordinary General Meeting
9th Dec 20218:30 amGNWResponse to reports of temporary suspension of future licences for Coringa
8th Dec 20213:00 pmGNWDirector / PDMR Shareholding
30th Nov 20217:00 amGNWUnaudited interim results for the third quarter and nine month period ended 30 September 2021
29th Nov 20217:00 amGNWWebinar with the Secretary for Geology, Mining and Mineral Transformation for Brazil
25th Nov 20217:00 amGNWNotice of Extraordinary General Meeting
19th Nov 20212:05 pmRNSSecond Price Monitoring Extn
19th Nov 20212:00 pmRNSPrice Monitoring Extension
2nd Nov 20217:00 amGNWChanges in Brazilian Operational Management
28th Oct 20217:00 amGNWDirector/PDMR Shareholding
13th Oct 20217:00 amGNWExcellent Third Quarter production and Coringa progress on track
20th Sep 20217:00 amGNWMine development underway at Coringa
27th Aug 20217:00 amGNWPublication Timetable for Annual Results for 2020 and Half Year Results for 2021
13th Aug 20217:00 amGNWSao Chico Exploration Demonstrates Further Growth Potential
22nd Jul 20217:00 amGNWFurther encouraging results confirm the prospectivity of the São Domingos Project
15th Jul 20217:00 amGNWRobust second quarter gold production
25th Jun 20213:50 pmGNWResults of Annual General Meeting
25th Jun 20217:00 amGNWAnnual General Meeting and update
18th Jun 202110:00 amGNWFinance update and extension to reporting deadline
16th Jun 202110:00 amGNWChanges to Annual General Meeting ("AGM")
8th Jun 20217:00 amGNWSao Domingos Exploration Confirms Depth and Strike Continuity of Mineralisation
28th May 20217:00 amGNWNotice of Annual General Meeting

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.