Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerabi Regulatory News (SRB)

Share Price Information for Serabi (SRB)

Share Price is delayed by 15 minutes
Get Live Data
345.00    3.00 (0.84%)
Bid:
340.00
Ask:
350.00
Spread: 10.00 (2.941%)
Market Cap: £274.71m
SRB Live PriceLast checked at - London Stock Exchange

Intraday Serabi Share Chart

Palito Exploration Update

26 Sep 2022 07:00

Palito Exploration Update

For immediate release

26 September 2022

Serabi Gold plc(“Serabi” or the “Company”)

Palito Exploration Update

Serabi Gold plc (AIM:SRB, TSX:SBI), the Brazilian-focused gold mining and development company, is pleased to provide an exploration update from its Palito Mine in the Tapajos region of Para State, Northern Brazil.

A PDF version of this announcement, including all images, can be accessed using the following link - https://bit.ly/3LOzPZF

Highlights

The Zonta Vein lies some 100 metres further west of the Senna Vein, which is in production, and once developed will be the most westerly production vein at Palito. High grade intercepts from the recent underground drilling and some previous surface and underground drilling include: 0.55 metres @ 55.99g/t Au from 397.15 metres (PDD0289)0.75 metres @ 34.75g/t Au from 217.00 metres (PUD0793)1.00 metres @ 36.46g/t Au from 223.55 metres (PUD0801)1.20 metres @ 10.65g/t Au from 300.80 metres (PUD0803)1.00 metres @ 10.69g/t Au from 234.45 metres (PUG009) Hole PUD0803 intersected the Zonta Vein at approximately 400 metres below surface and is currently the deepest intersection anywhere within the Palito Mine, boding well for future resource growth.

Mike Hodgson CEO said

“Underground drilling at the Palito Mine continues to deliver excellent results. This recent phase of drilling has intersected the Zonta Vein, an orebody that we had previously identified with limited surface drilling but had never properly drill tested. Most significantly, Zonta lies west of the Palito mine, meaning this is a new zone discovered between Senna – our most westerly developed vein and the Piaui zone, which was successfully drilled earlier this year. With minimal information between Zonta and Piaui, the possibility of finding multiple veins as we develop the mine to the west is high.

“Of further interest is the depth of some of these intercepts in the Zonta Vein. Hole PUD 0803 is 400 metres below surface, the deepest intercept in all of the Palito veins, recording 10.65 g/t over 1.20 metres and therefore indicating the veins remain robust at depth.

“Access and development of the Zonta vein is already underway with a simple cross-cut from the Senna Vein. and the resulting resource will make a meaningful contribution to our forthcoming mineral resource update and gold production in 2023 and 2024 .”

Results

The Zonta Vein is situated within the Palito Mine lease and extends the strike width of the Senna Sector as the most south-westerly vein identified in this immediate area. The Senna Sector is an area which is already being mined by Serabi and the significant existing mine infrastructure should facilitate rapid development of the Zonta Vein.

A further 500 metres to the southwest lies the Piaui Sector, (see news release dated 18 March 2022), an area that has been successfully drilled but does not have any underground mine development or infrastructure.

To access an image of the Plan of Palito Mine Veins please click on the following link : https://bit.ly/3SydYrs

Figure 1: Plan of Palito Mine veins and underground development

HOLE_IDTARGETEAST(UTM SAD69NORTH(UTM SAD69RLDEPTH (m)DIP/Azm(°/°UTM)FromToApparentWidthGoldGrade(Au g/t)CopperGrade(Cu ppm)
2006 SURFACE DRILLING
PDD0255ZONTA633188.069301467275.82400.58-40.09/214.4346.53347.030.501.848122
       357.63358.240.612.185883
PDD0258ZONTA633061.649301455.4258.7280.4-39.65/210.96207.42208.491.073.324292
PDD0289ZONTA633367.269301355.45302.7450.05-43.41/214.97397.15397.70.5550.99427000
       402.75403.710.965.0311675
       403.71404.350.641.084601
PDD0313ZONTA633385.749301216.23278.97293.6-43.3/214.63282.75283.280.531.31287
       284.97286.121.151.17130
2022 UNDERGROUND DRILLING
PUD0793ZONTA633284.1289301199.81144.486335.9-32.83/263.56216.32170.702.831060
       217217.750.7534.752380
       217.75218.751.001.38853
PUD0801ZONTA633285.0589301199.56144.463253.25-47.87/251.44223.55224.551.0036.465183
       227.1228.11.004.27643
PUD0803ZONTA633285.7029301199.02144.605407.8-55.04/235.49229.8230.30.502.39567
       296.6297.150.553.29319
       300.83021.2010.651227
PUD0821ZONTA633287.0189301196.32145.482332.7-29.38/161.06221.9222.951.050.7186
2016/2017 UNDERGROUND DRILLING
PUG001ZONTA633277.2369301198232.745180-35/200.08174.8175.20.4010.7159
PUG006ZONTA633276.1949301198.65232.123204-51.23/239.55196.1196.850.750.98680
PUG007ZONTA633276.1239301198.61232.428208.5-49.5/239.08203.85204.20.350.62342
PUG008ZONTA633276.1099301198.59232.023198.3-32.74/239.74170.6171.250.651.58283
PUG009ZONTA633275.9319301198.9232.031241.5-49.06/249.47218.452190.550.530
       224.45225.451.000.68416
       226.5227.450.950.71272
       230.25230.80.550.99652
       234.45235.451.0010.691229
PUG011ZONTA633275.6319301198.78233.3201-41.05/251.18184.65185.150.500.3572
Reported intercepts calculated based on a minimum weighted average grade of 0.5g/t Au (0.3g/t Au for historic results) using a 0.5g/t Au weighted average lower cut and a maximum internal waste interval of 1.2m based on ALS and Serabi´s on-site lab reported analyses. Some of the assay results reported above include those provided by the Company's own on-site laboratory facilities at Palito and have not been independently verified. Serabi closely monitors the performance of its own facility against results from independent laboratory analysis for quality control purpose. As a matter of normal practice, the Company sends duplicate samples derived from a variety of the Company's activities to accredited laboratory facilities for independent verification. Since mid-2019, over 10,000 exploration drill core samples have been assayed at both the Palito laboratory and certified external laboratory, in most cases the ALS laboratory in Belo Horizonte, Brazil. When comparing significant assays with grades exceeding 1 g/t gold, comparison between Palito versus external results record an average over-estimation by the Palito laboratory of 6.7% over this period. Based on the results of this work, the Company's management are satisfied that the Company's own facility shows sufficiently good correlation with independent laboratory facilities for exploration drill samples. The Company would expect that in the preparation of any future independent Reserve/Resource statement undertaken in compliance with a recognised standard, the independent authors of such a statement would not use Palito assay results without sufficient duplicates from an appropriately certificated laboratory.

Holes PDD0255 to PDD0313 were drilled from surface in 2006, holes PUG001 to PUG011 were drilled from underground during 2016 and 2017 and holes PUD0793 to PUD0821 were drilled during this recent campaign.

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK Domestic Law by virtue of the European Union (Withdrawal) Act 2018.

The person who arranged for the release of this announcement on behalf of the Company was Clive Line, Director.

Enquiries:

Serabi Gold plc 
Michael HodgsonTel: +44 (0)20 7246 6830
Chief ExecutiveMobile: +44 (0)7799 473621
  
Clive LineTel: +44 (0)20 7246 6830
Finance DirectorMobile: +44 (0)7710 151692
  
Email: contact@serabigold.com 
Website: www.serabigold.com 
  
Beaumont Cornish LimitedNominated Adviser and Financial Adviser 
Roland Cornish / Michael CornishTel: +44 (0)20 7628 3396
  
Peel Hunt LLPJoint UK Broker 
Ross Allister / Alexander AllenTel: +44 (0)20 7418 9000
  
Tamesis Partners LLPJoint UK Broker 
Charlie Bendon / Richard GreenfieldTel: +44 (0)20 3882 2868
  
Camarco Financial PR 
Gordon Poole / Emily HallTel: +44(0) 20 3757 4980

Copies of this announcement are available from the Company's website at www.serabigold.com.

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this announcement.

See www.serabigold.com for more information and follow us on twitter @Serabi_Gold

GLOSSARY OF TERMS

“Ag”means silver.
“Au”means gold.
“assay”in economic geology, means to analyse the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.
“CIM”means the Canadian Institute of Mining, Metallurgy and Petroleum.
“chalcopyrite”is a sulphide of copper and iron.
“Cu”means copper.
“cut-off grade”the lowest grade of mineralised material that qualifies as ore in a given deposit; rock of the lowest assay included in an ore estimate.
“dacite porphyry intrusive”a silica-rich igneous rock with larger phenocrysts (crystals) within a fine-grained matrix
“deposit”is a mineralised body which has been physically delineated by sufficient drilling, trenching, and/or underground work, and found to contain a sufficient average grade of metal or metals to warrant further exploration and/or development expenditures; such a deposit does not qualify as a commercially mineable ore body or as containing ore reserves, until final legal, technical, and economic factors have been resolved.
“electromagnetics”is a geophysical technique tool measuring the magnetic field generated by subjecting the sub-surface to electrical currents.
“garimpo”is a local artisanal mining operation
“garimpeiro”is a local artisanal miner.
“geochemical”refers to geological information using measurements derived from chemical analysis.
“geophysical”refers to geological information using measurements derived from the use of magnetic and electrical readings.
“geophysical techniques”include the exploration of an area by exploiting differences in physical properties of different rock types. Geophysical methods include seismic, magnetic, gravity, induced polarisation and other techniques; geophysical surveys can be undertaken from the ground or from the air.
“gossan”is an iron-bearing weathered product that overlies a sulphide deposit.
“grade”is the concentration of mineral within the host rock typically quoted as grams per tonne (g/t), parts per million (ppm) or parts per billion (ppb).
“g/t”means grams per tonne.
“granodiorite”is an igneous intrusive rock similar to granite.
“hectare” or a “ha”is a unit of measurement equal to 10,000 square metres.
“igneous”is a rock that has solidified from molten material or magma.
“IP”refers to induced polarisation, a geophysical technique whereby an electric current is induced into the sub-surface and the conductivity of the sub-surface is recorded.
“intrusive”is a body of rock that invades older rocks.
"Indicated Mineral Resourceis that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.
"Inferred Mineral Resource”is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.
“Inferred Mineral Resource”‟ is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.
“mineralisation” the concentration of metals and their chemical compounds within a body of rock.
“mineralised” refers to rock which contains minerals e.g. iron, copper, gold.
"Mineral Resource”is a concentration or occurrence of diamonds, natural solid inorganic material, or natural solid fossilized organic material including base and precious metals, coal, and industrial minerals in or on the Earth's crust in such form and quantity and of such a grade or quality that it has reasonable prospects for economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge.
“Mineral Reserve”is the economically mineable part of a Measured or Indicated Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified. A Mineral Reserve includes diluting materials and allowances for losses that may occur when the material is mine
“Mo-Bi-As-Te-W-Sn”Molybdenum-Bismuth-Arsenic-Tellurium-Tungsten-Tin
“monzogranite”a biotite rich granite, often part of the later-stage emplacement of a larger granite body.
“mt” means million tonnes.
“ore” means a metal or mineral or a combination of these of sufficient value as to quality and quantity to enable it to be mined at a profit.
“oxides” are near surface bed-rock which has been weathered and oxidised by long term exposure to the effects of water and air.
“ppm” means parts per million.
“Probable Mineral Reserve”is the economically mineable part of an Indicated and, in some circumstances, a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This Study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.
“Proven Mineral Reserve”is the economically mineable part of a Measured Mineral Resource. A Proven Mineral Reserve implies a high degree of confidence in the Modifying Factors
“saprolite” is a weathered or decomposed clay-rich rock.
“sulphide”refers to minerals consisting of a chemical combination of sulphur with a metal.
“vein”is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.
“VTEM”refers to versa time domain electromagnetic, a particular variant of time-domain electromagnetic geophysical survey to prospect for conductive bodies below surface.

Assay ResultsAssay results reported within this release include those provided by the Company's own on-site laboratory facilities at Palito and these will not have been independently verified. Serabi closely monitors the performance of its own facility against results from independent laboratory analysis for quality control purpose. As a matter of normal practice, the Company sends duplicate samples derived from a variety of the Company's activities to accredited laboratory facilities for independent verification. Since mid-2019, over 10,000 exploration drill core samples have been assayed at both the Palito laboratory and certified external laboratory, in most cases the ALS laboratory in Belo Horizonte, Brazil. When comparing significant assays with grades exceeding 1 g/t gold, comparison between Palito versus external results record an average over-estimation by the Palito laboratory of 6.7% over this period. Based on the results of this work, the Company's management are satisfied that the Company's own facility shows sufficiently good correlation with independent laboratory facilities for exploration drill samples. The Company would expect that in the preparation of any future independent Reserve/Resource statement undertaken in compliance with a recognised standard, the independent authors of such a statement would not use Palito assay

Qualified Persons StatementThe scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 26 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognising him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

Forward Looking StatementsCertain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ‘‘believe’’, ‘‘could’’, “should” ‘‘envisage’’, ‘‘estimate’’, ‘‘intend’’, ‘‘may’’, ‘‘plan’’, ‘‘will’’ or the negative of those, variations, or comparable expressions, including references to assumptions. These forward-looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward-looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward-looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

ENDS

Attachment

Palito exploration update
Date   Source Headline
1st Jun 202610:00 pmBUSTotal Voting Rights
29th May 20267:00 amBUSUnaudited interim results for the three-month period ended 31 March 2026
22nd May 202610:10 pmBUSNotice of Annual General Meeting
22nd May 202610:00 pmBUSDividend Information
13th May 20268:16 amBUSDirector / PDMR Shareholding
13th May 20268:14 amBUSVesting and settlement of 2023 Conditional Share Awards and Notification of transactions by persons discharging managerial responsibilities
11th May 20266:00 amBUSCorrection - Audited Results for the year ended 31 December 2025
1st May 20267:00 amBUSAudited Results for the year ended 31 December 2025
28th Apr 20267:00 amBUSResults of Updated Mineral Resource and Reserves; Increases Consolidated M&I to 731koz Au and Inferred Resource to 653koz Au
14th Apr 20267:00 amBUSReports Q1-2026 Production & Operational Highlights
2nd Mar 20267:30 amBUSProvides Operational and Exploration Update for 2025 Brownfield Drilling Campaigns at Palito Complex and Coringa; Announces 2026 Brownfield Exploration Programme
12th Feb 202612:00 amGNWTR-1 Notification
12th Feb 202612:00 amGNWTR-1 Notification
3rd Feb 20266:00 amGNWUpdate on Recent Incidents at Palito Complex and Coringa Mine
31st Jan 20266:02 pmGNWFatality at Palito Complex
26th Jan 20261:00 pmGNWFatality at Coringa Mine
15th Jan 20266:30 amGNWReports Q4-2025 Production, Record Annual Production, Production Guidance Achieved & Operational Highlights
28th Nov 20256:30 amGNWUnaudited interim results for the three and nine-month periods ended 30 September 2025
14th Oct 20256:31 amGNWReports a Record Quarterly Production in Q3-2025 of 12,090 Gold Ounces and Provides Operational Highlights
2nd Sep 202510:01 pmGNWHolding(s) in Company
28th Aug 20256:30 amGNWUnaudited interim results for the three-and six-month periods ended 30 June 2025
8th Aug 202510:00 pmGNWHolding(s) in Company
31st Jul 20256:30 amGNWIncreases Total Mineral Inventory: Provides Results of Updated Mineral Resource and Reserves
25th Jul 20257:00 pmGNWHolding(s) in Company
14th Jul 20256:30 amGNWQ2-2025 Production Results and Operational Highlights
27th Jun 20254:00 pmGNWResult of AGM
26th Jun 20254:19 pmGNWAGM Statement
6th Jun 20259:51 amGNWVesting and settlement of 2022 Conditional Share Awards and Notification of transactions by persons discharging managerial responsibilities
30th May 20254:00 pmGNWNotice of Annual General Meeting
29th May 20257:00 amGNWUnaudited interim results for the three-month period ended 31 March 2025
30th Apr 20257:00 amGNWAudited Results for the year ended 31 December 2024
25th Apr 20258:10 amGNWDirectorate change
24th Apr 20252:41 pmGNWHolding(s) in Company
23rd Apr 20252:54 pmGNWHolding(s) in Company
23rd Apr 202510:19 amGNWHoldings in the Company
23rd Apr 20257:00 amRNSResults of placing in Serabi Gold plc
22nd Apr 20254:43 pmRNSProposed placing in Serabi Gold plc
22nd Apr 202510:17 amGNWBoard Change
15th Apr 20257:01 amGNWHolding(s) in Company
15th Apr 20257:00 amGNWHolding(s) in Company
15th Apr 20257:00 amGNWHolding(s) in Company
14th Apr 20257:00 amGNWQ1-2025 Production Results, Operational Highlights and Board Change
7th Apr 20257:00 amGNWExploration update at Palito, Coringa and São Domingos
26th Mar 20257:00 amGNWDirector/PDMR Shareholding
15th Jan 20257:00 amGNWQ4-2024 Production Results and Operational Highlights
2nd Jan 20257:00 amGNWDirectorate and Management Changes
19th Dec 20247:00 amGNWClassification Plant at Coringa Commissioned
28th Nov 20247:00 amGNWUnaudited interim results for the three-and nine-month periods ended 30 September 2024
21st Nov 20247:00 amGNWSerabi Gold Files NI 43-101 Technical Report for the Coringa Gold Project
21st Oct 20247:00 amGNWQ3-2024 Production Results and Operational Highlights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.