Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSerabi Regulatory News (SRB)

Share Price Information for Serabi (SRB)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 66.00
Bid: 65.00
Ask: 67.00
Change: 1.50 (2.33%)
Spread: 2.00 (3.077%)
Open: 64.50
High: 66.00
Low: 64.50
Prev. Close: 64.50
SRB Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational and Business Update

13 Feb 2019 07:00



Operational and Business Update

For immediate release

13 February 2019

Serabi Gold plc(“Serabi” or the “Company”)

Operational and Business Update

Serabi Gold plc (AIM: SRB, TSX: SBI), the Brazilian focused gold mining and development company, is pleased to provide an update from its operations and projects in Brazil. 

Highlights

January gold production of 3,671 ounces in line with guidance. Treatment of stockpiled flotation tailings underway through the recently commissioned independent trommel feed system (“Scrubber”).Ore Sorter testing completed and now being shipped to Brazil. Cash position at end of January 2019 of US$12.8 million. Geological Resource update drilling close to completion at CoringaA Geological Resource update and Preliminary Economic Assessment Study (“PEA”) remain on schedule to be published in March and June 2019, respectively. Serabi will be available at booth #2533 at this year’s PDAC convention in Toronto, and will also be attending the BMO Global Metals & Mining Conference in Hollywood, Miami.

CEO Mike Hodgson commented: “We are delighted to have started the year in much the same way as 2018 ended, with excellent production. Production guidance for 2019 has been set at 40,000-44,000 ounces, so January’s total gold production of over 3,650 ounces has been a great way to start the year. The step up from the production levels of 2017 and 2018 will be driven by improved efficiencies in both orebodies and the processing of some of the 40,000 tonnes of flotation tails (grading 3 g/t gold) which will supplement the normal ‘run-of-mine’ production. We have now commissioned the scrubber which was started on 10 January and has worked superbly since. It allows the tails (which have already been milled) to be fed directly to the cyanidation plant, therefore not consuming valuable capacity in the milling section of the plant.

 “At Coringa, we are close to concluding a drill programme, the results from which will be included in the resource update. As reported at the end of January the results to date have been excellent. We remain on schedule to publish an updated geological resource estimate before the end of the first quarter, and will follow this up with the preparation of a PEA, the results of which are expected to be available before the end of June 2019.

“In light of recent events at Brumadinho in Minas Gerais state in Brazil, I would like to give reassurance to our stakeholders regarding the tailings management facility at Palito. Serabi’s operations are all about quality not quantity, therefore we mine and process almost insignificant volumes of rock relative to industrial mineral, iron ore and bauxite operations such as Brumadinho. New legislation has been introduced following the dam failure at Mariana, also in Minas Gerais, in 2015. This legislation has, however been a rather ‘one size fits all’ approach, and as a result we do have a highly ‘over-engineered’ tailings facility and the annual audit of our tailings facilities, undertaken late last year by an accredited Brazilian geotechnical engineering expert, confirmed our tailings management facility to be in good order, and it remains fully licenced and certified.

“We do expect further tightening of legislation post Brumadinho, and this week the government, through the National Mining Agency (AMN), have moved to ban all upstream tailings dams. Such a move would not affect the safety and legality of our tailings facility which (i) comprises small ponds, rather than dams and (ii) is not upstream of any nearby population.”

A short interview by BRR Media with Mike Hodgson can be accessed using the following link

https://www.brrmedia.co.uk/broadcasts-embed/5c62e8dce6e1d92d38f4d9b5/event/?popup=true

This announcement is inside information for the purposes of Article 7 of Regulation 596/2014.

The person who arranged for the release of this announcement on behalf of the Company was Clive Line, Director.

Enquiries:

Serabi Gold plc 
Michael HodgsonTel: +44 (0)20 7246 6830
Chief ExecutiveMobile: +44 (0)7799 473621
  
Clive LineTel: +44 (0)20 7246 6830
Finance DirectorMobile: +44 (0)7710 151692
  
Email: contact@serabigold.com 
Website: www.serabigold.com 
  
Beaumont Cornish LimitedNominated Adviser and Financial Adviser 
Roland CornishTel: +44 (0)20 7628 3396
Michael CornishTel: +44 (0)20 7628 3396
  
Peel Hunt LLPUK Broker 
Ross AllisterTel: +44 (0)20 7418 8900
James BavisterTel: +44 (0)20 7418 8900
  

Copies of this announcement are available from the Company's website at www.serabigold.com.

Neither the Toronto Stock Exchange, nor any other securities regulatory authority, has approved or disapproved of the contents of this announcement.

GLOSSARY OF TERMS

The following is a glossary of technical terms:

 “Au” means gold.

 “assay” in economic geology, means to analyse the proportions of metal in a rock or overburden sample; to test an ore or mineral for composition, purity, weight or other properties of commercial interest.

“development” - excavations used to establish access to the mineralised rock and other workings

“DNPM” is the Departamento Nacional de Produção Mineral.

“grade” is the concentration of mineral within the host rock typically quoted as grammes per tonne (g/t), parts per million (ppm) or parts per billion (ppb).

“g/t” means grams per tonne.

“granodiorite” is an igneous intrusive rock similar to granite.

“igneous” is a rock that has solidified from molten material or magma.

“Intrusive” is a body of igneous rock that invades older rocks.

“on-lode development” - Development that is undertaken in and following the direction of the Vein

 “mRL” – depth in metres measured relative to a fixed point – in the case of Palito and Sao Chico this is sea-level. The mine entrance at Palito is at 250mRL.

“saprolite” is a weathered or decomposed clay‐rich rock.

“scrubber” – a machine for cleaning ore and removing impurities such as clays, coatings or other deleterious materials.

“stoping blocks” – a discrete area of mineralised rock established for planning and scheduling purposes that will be mined using one of the various stoping methods. 

“vein” is a generic term to describe an occurrence of mineralised rock within an area of non-mineralised rock.

Qualified Persons StatementThe scientific and technical information contained within this announcement has been reviewed and approved by Michael Hodgson, a Director of the Company. Mr Hodgson is an Economic Geologist by training with over 26 years' experience in the mining industry. He holds a BSc (Hons) Geology, University of London, a MSc Mining Geology, University of Leicester and is a Fellow of the Institute of Materials, Minerals and Mining and a Chartered Engineer of the Engineering Council of UK, recognising him as both a Qualified Person for the purposes of Canadian National Instrument 43-101 and by the AIM Guidance Note on Mining and Oil & Gas Companies dated June 2009.

Forward Looking StatementsCertain statements in this announcement are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ‘‘believe’’, ‘‘could’’, “should” ‘‘envisage’’, ‘‘estimate’’, ‘‘intend’’, ‘‘may’’, ‘‘plan’’, ‘‘will’’ or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors’ current expectations and assumptions regarding the Company’s future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors’ current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

ENDS


Attachment




Operational and Business Update



Date   Source Headline
29th Apr 20247:00 amGNWAudited Results for the year ended 31 December 2023
17th Apr 20247:00 amGNWQ1 2024 Production Results and Operational Highlights
8th Apr 20247:00 amGNWSerabi provides update to regional exploration campaign at its Palito Complex
28th Mar 20242:30 pmGNWConditional Share Awards
12th Feb 202412:30 pmGNWLaunch of Updated Website
12th Feb 202412:00 pmGNWCommencement of Trading on OTCQX
2nd Feb 20243:58 pmGNWDirector/PDMR Shareholding
31st Jan 20247:00 amGNWTrial mining license at Coringa renewed for a further three years
29th Jan 20247:00 amGNWQ4 & Full Year 2023 Production Results and Operating Highlights
4th Jan 20247:00 amGNWHolding(s) in Company – TR1 Notification
19th Dec 20237:00 amGNWMatilda Copper Project - Exploration results confirm project potential
30th Nov 20237:00 amGNWUnaudited interim results for the three and nine month periods ended 30 September 2023
28th Nov 20237:00 amGNWPositive results from regional exploration activity around the Palito tenement
23rd Nov 20237:00 amGNWHolding(s) in Company
21st Nov 20237:00 amGNWSerabi significantly extends mine life at the Palito Complex as new 43-101 is published.
19th Oct 20237:00 amGNWCoringa Ore Sorter Acquired
19th Oct 20237:00 amGNWSerabi secures award for its Community Engagement
17th Oct 20237:00 amGNWRobust Production for Third Quarter of 2023
9th Oct 20237:00 amGNWTR-1: Standard form for notification of major holdings
6th Oct 20237:00 amGNWSignificant increase in gold resource for Palito- Updated Mineral Resource Statement
7th Sep 20237:00 amGNWMatilda Copper Project - Exploration Update
31st Aug 20237:00 amGNWUnaudited interim results for 3 and 6 month periods to 30 June 2023
1st Aug 20237:00 amGNWDirector/PDMR Shareholding
31st Jul 20237:00 amGNWAgreement with Indigenous Communities for Coringa development
20th Jul 20237:00 amGNWImproved Production for Second Quarter of 2023
28th Jun 20237:00 amGNWResult of AGM
27th Jun 202311:00 amGNWAGM Statement
7th Jun 20237:00 amGNWPalito Brownfield Exploration Update
31st May 20237:00 amGNWUnaudited financial results for Q1 2023
30th May 20239:00 amGNWNotice of AGM
10th May 20237:00 amGNWSerabi Forms Exploration Alliance with Vale
9th May 20237:00 amGNWDirectorate change
3rd May 20237:00 amGNWAudited Results for the year ended 31 December 2022
3rd May 20237:00 amGNW2022 ESG performance
19th Apr 20237:00 amGNWRobust first quarter for 2023
5th Apr 20233:00 pmGNWHolding(s) in Company – TR1 Notification
5th Apr 20233:00 pmGNWHolding(s) in Company – TR1 Notification
22nd Mar 20237:00 amGNWCoringa Project Update
14th Mar 20237:00 amGNWMike Hodgson interview at PDAC
10th Mar 20237:00 amGNWDirectorate change
25th Jan 20237:00 amGNWDirectorate change
17th Jan 20239:15 amGNWSerabi exceeds production guidance for 2022
20th Dec 20227:00 amGNWResults of Extraordinary General Meeting
13th Dec 20227:00 amGNW3rd Quarter Results
15th Nov 20227:00 amGNWNotice of Extraordinary General Meeting
13th Oct 20227:00 amGNWThird quarter 2022 operational review
26th Sep 20227:00 amGNWPalito Exploration Update
15th Sep 20227:00 amGNWChange of auditor
31st Aug 20227:00 amGNWUnaudited interim results for the three and six month periods ended 30 June 2022
23rd Aug 20222:00 pmGNWUpdate on Coringa Licencing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.