The latest Investing Matters Podcast with Jean Roche, Co-Manager of Schroder UK Mid Cap Investment Trust has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSOLO.L Regulatory News (SOLO)

  • There is currently no data for SOLO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update, Tanzania

5 Dec 2016 07:00

RNS Number : 8508Q
Solo Oil Plc
05 December 2016
 

FOR IMMEDIATE RELEASE, 7:00 am 5 December 2016

 

SOLO OIL PLC

("Solo" or the "Company")

 

Operations Update, Tanzania

Solo is pleased to provide an operational update on activities in the Ruvuma Basin PSA and the Kiliwani North Development Licence operated by Aminex plc ("Aminex").

Aminex confirms that an independent inspection of the Caroil#2 drilling rig has been completed and the Ntorya-2 ("NT-2") appraisal well is now expected to be spudded in mid-December. The Company has a 25% interest in the well and initial results are expected early next year. Solo is funded for its share of the drilling costs of NT-2 which are estimated to be US$2.5 million net to Solo's interest.

The NT-2 appraisal well is located approximately 1,500 metres southwest of the Ntorya-1 ("NT-1") discovery well, which flow tested at 20 million cubic feet per day of gas ("mmscfd") with 139 barrels associated condensate from a 3.5 metre interval at the top of a 20 metre Cretaceous sandstone pay zone at a depth of approximately 2,600 metres. The NT-2 well is expected to test the up-dip part of the same channel complex as the NT-1 discovery well in a thicker gross reservoir section.

Additionally, Aminex has reported that it has now completed all necessary civil works for the Ntorya-3 ("NT-3") wellsite. NT-3, which is located approximately 5 kilometres from the NT-1 discovery well, is expected to be drilled following NT-2, however, the programme may vary depending on the results at NT-2. The location of NT-3 was picked based on 2D seismic acquired in 2014 and is further up-dip from both NT-1 and NT-2 and the well is expected to test the thickest part of the Cretaceous channel complex.

Revenues from Kiliwani North gas sales to the Tanzania Petroleum Development Corporation are now established. The gas is sold at US$3.00 per mmBTU at the outlet flange of the wellhead and the Company does not incur any additional transmission costs. Cash from the sale of gas from Kiliwani North is being deployed by the Company to fund operations in Tanzania. Solo holds a 7.125% working interest in the Kiliwani North field and gas sales.

Neil Ritson, Solo's Chairman, commented;

"News from Aminex, the operator of both the Ruvuma PSA and KNDL, confirms that both operations remain on schedule. Solo is especially excited that the spud of the Ntorya appraisal well is now imminent since this well has significant upside potential for Solo's asset holdings in Tanzania. The receipt of regular gas payments from TPDC is also encouraging and will support the investments being made in Tanzania."

Qualified Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chairman and Director of Solo Oil plc who has over 38 years of relevant experience in the energy sector. Mr. Ritson is a member of the Society of Petroleum Engineers, an Active Member of the American Association of Petroleum Geologists and is a Fellow of the Geological Society of London.

 

For further information:

Solo Oil plc

Neil Ritson

Daniel Maling

+44 (0) 20 3794 9230

 

 

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

+44 (0) 20 7628 3396

 

Shore Capital

Joint Broker

Jerry Keen

 

Beaufort Securities

Joint Broker

Jon Belliss

 

Cassiopeia Services Ltd

Investor and Media Relations

Stefania Barbaglio

 

+44 (0) 20 7408 4090

 

 

 

 

+44 (0) 20 7382 8300

 

 

 

+44 (0) 79 4969 0338

 

Glossary:

2D seismic

seismic data collected using the two-dimensional common depth point method

barrel

45 US gallons

discovery

a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

m

thousand (ten to the power 3)

mm

million (ten to the power 6)

mmBTU

million British Thermal Units

mmscfd

million standard cubic feet of gas per day

pay

reservoir or portion of a reservoir formation that contains economically producible hydrocarbons. The overall interval in which pay sections occur is the gross pay; the portion of the gross pay that meets specific criteria such as minimum porosity, permeability and hydrocarbon saturation are termed net pay

PSA

Petroleum Sharing Agreement

reservoir

a subsurface rock formation containing an individual natural accumulation of moveable petroleum

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEADAAEDAKFFF
Date   Source Headline
28th Feb 201811:09 amRNSConfirmation of amount raised by PrimaryBid
28th Feb 20187:55 amRNSFund raising of £2m and TVR
27th Feb 20186:19 pmRNSPrimaryBid.com Offer
27th Feb 20186:15 pmRNSPlacement of Equity, Asset Acquisition
5th Feb 201810:00 amRNSSignificant Resource Upgrade at Ntorya, Tanzania
22nd Jan 20187:00 amRNSUpdate on Helium One Investment
8th Jan 20187:00 amRNSTanzania Operation Update
19th Dec 20177:00 amRNSUpdate on Horse Hill, Weald Basin, UK
18th Dec 20177:00 amRNSDirectorship Change
14th Dec 20179:49 amRNSDirector/PDMR Shareholding
4th Dec 20177:00 amRNSUpdate on Helium One's Projects, Tanzania
16th Nov 201711:30 amRNSLive Webinar: Wednesday 29 November
14th Nov 20177:00 amRNSUS$5 million Convertible Loan Facility
6th Nov 20177:00 amRNSKiliwani North Operations Update
18th Oct 20175:58 pmRNSHorse Hill - Planning Permission Granted
28th Sep 20177:00 amRNSHalf-year Report
8th Sep 20177:00 amRNSApprovals Horse Hill-1 Extended Testing
6th Sep 20177:00 amRNSSubmission of Ntorya Development Plan
4th Sep 20177:00 amRNSNtorya Gas Field Resource Upgrade
24th Jul 20173:01 pmRNSResult of AGM, Share consolidation, TVR
20th Jul 20177:00 amRNSUpdate on Kiliwani North, Ntorya, Tanzania
10th Jul 20177:05 amRNSUpdate on Horse Hill
10th Jul 20177:00 amRNSGas Development Study,Ntorya
29th Jun 20172:46 pmRNSNotice of AGM
20th Jun 20178:00 amRNSUpdate on Kiliwani North
15th Jun 20177:00 amRNSAnnual Financial Report
23rd May 20171:50 pmRNSCancellation of General Meeting
19th May 20177:00 amRNSNotice of GM and Investment update
11th May 20177:00 amRNSAppointment of Executive Chairman
9th May 20177:00 amRNSTechnical update on Helium One's Projects
24th Apr 20177:00 amRNSNtorya Appraisal Area Major Resource Upgrade
4th Apr 20172:17 pmRNSTotal Voting Rights
4th Apr 20177:00 amRNSHorse Hill Licence Period Extended
22nd Mar 20177:00 amRNSInvestment in Helium Project and Subscription
8th Mar 20177:00 amRNSTest Results Ntorya-2, Tanzania
28th Feb 20175:30 pmRNSTotal Voting Rights
27th Feb 20172:00 pmRNSNtorya-2 Update, Tanzania
16th Feb 20177:00 amRNSPlacing of Equity and TVR
7th Feb 20177:15 amRNSre Horse Hill Oil Discovery
6th Feb 20177:00 amRNSNtorya-2 Initial Well Results
9th Jan 20177:00 amRNSOperational Update Ntorya-2, Tanzania
21st Dec 20163:00 pmRNSSpudding of Ntorya-2
19th Dec 20167:00 amRNSNtorya-2 Update, Tanzania
6th Dec 20164:47 pmRNSDirector/PDMR Shareholding
5th Dec 20167:00 amRNSOperations Update, Tanzania
22nd Nov 20163:20 pmRNSHolding(s) in Company
21st Nov 20163:48 pmRNSHolding(s) in Company
14th Nov 201612:23 pmRNSHolding(s) in Company
7th Nov 201612:09 pmRNSHolding(s) in Company
1st Nov 20167:00 amRNSIssue of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.