Operational Update, Canada

16 Feb 2012 07:00

RNS Number : 5165X
Solo Oil Plc
16 February 2012
 



16 February 2012

 

 

SOLO OIL PLC

("Solo")

Operational Update, Canada

 

Solo today announces an update on activities in South Western Ontario, Canada operated by its Joint Venture partner Reef Resources Limited ("Reef").

 

Reef's announcement, to the Toronto exchange, reads:

 

February 15, 2012 - Calgary, Alberta - Reef Resources Ltd. ("Reef" or the "Company") reports that substantial further progress has been made on a number of field activities associated with the ongoing development of the Ausable Gas Recycling and Enhanced Oil Recovery (EOR) project.

 

·; The recent cold weather in Ontario has improved conditions for completing the pipeline between the existing South Airport gas well and the Ausable process facility. Once the pipeline welding is completed the required road bores will be conducted.

·; The reversal of the Union Gas meter, which will allow the Company to purchase natural gas for re-injection in the Ausable reef, is tentatively scheduled for February 27th. Piping modifications at the facility will commence once the gas flow is reversed. This will allow initiation of the gas re-injection scheme. Additionally, gas and gas liquids from South Airport will also be used for re-injection once the pipeline is completed and commissioned.

·; The workover program for installation of a production packer in Ausable #1 well is being initiated to coincide with the planned meter reversal. This will isolate the top set of three perforations and will allow for planned gas reinjection into the uppermost section of the Ausable reef.

·; A larger inlet separator has been sourced in Alberta and following minor upgrades will be shipped to Ontario. The larger separator is designed to handle higher oil, water and natural gas volumes associated with the venturi pumping system. Facility upgrades associated with the larger separator will accommodate production from all the Ausable and Airport wells.

·; The new high pressure surface venturi pump skid design is completed and the Company is currently sourcing qualified fabricators for skid packaging. The new pump package will accommodate all current and future planned wells.

·; After commissioning trials on the Ausable #5 venturi pump, a down-hole valve requires replacement. A service rig is required in order to retrieve and re-run the down-hole assembly and it is hoped this work can be undertaken in the next 10 days. Oil production from Ausable #5 and Ausable #1 is being hampered by the formation of waxes at the pump inlet level approximately 560 metres below surface. This is due to abnormally low reservoir temperatures and further hampered by low ambient temperatures. A gas-fired line heater will be installed to heat high pressure water to service the venturi pumps on all wells. This will increase pump inlet temperatures at the bottom of the well which in turn will mitigate any wax build up at the venturi pump and in the tubulars.

·; The North Airport well is proceeding as planned and is currently at 194 metres. Cementing of the surface casing is anticipated within the next 10 days.

 

Arnie Hansen, Reef President commented: "All the components for initiating the EOR program are coming together and we can now look forward to realizing the production benefits once all the current projects are commissioned and on stream. The Company is hopeful that with the EOR scheme fully implemented it can hit its target of 200 boed by mid-year and exit 2012 with net production of up to 500 boed. "

 

Neil Ritson, Solo Executive Director, commented; 

 

"Reef has maintained momentum on all fronts despite difficult weather conditions. The need to install heaters on the venturi jet pumps was not originally foreseen and has so far prevented final commissioning of the Ausable #5 pump during the winter. The arrival of injection gas at the plant will significantly increase production potential. Solo shares Reef's confidence that production will reach 500 boed by end of 2012."

 

Competent Person's Statement:

 

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chief Executive Officer and Director for Solo Oil Plc who has 35 years of relevant experience in the oil industry. Mr. Ritson is a member of the Society of Petroleum Engineers, an Active Member of the American Association of Petroleum Geologists and is a Fellow of the Geological Society of London.

 

For further information:

 

Solo Oil plc

David Lenigas

Neil Ritson

+44 (0) 20 7440 0642

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

+44 (0) 20 7628 3396

Shore Capital

Joint Broker

Pascal Keane

Jerry Keen (Corporate Broker)

 

Pelham Bell Pottinger

Public Relations

Mark Antelme

 Henry Lerwill

 

+44 (0) 20 7408 4090

 

 

 

 

+44 (0) 20 7861 3232

 

Glossary:

 

boed - barrels of oil equivalent per day

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCGGUAPPUPPPUA
Date   Source Headline
31st Jul 20125:04 pmRNSTotal Voting Rights
26th Jul 20123:15 pmRNSIssue of Equity
2nd Jul 20127:00 amRNSRuvuma Independent Evaluation
29th Jun 20123:24 pmRNSIssue of Equity and TVR
28th Jun 20127:00 amRNSTanzania Test Results
22nd Jun 201211:37 amRNSIssue of Equity
21st Jun 20121:15 pmRNSNtorya-1 Testing, Tanzania
20th Jun 201212:54 pmRNSIssue of Options
18th Jun 20129:27 amRNSDrilling Report
18th Jun 20127:00 amRNSDrilling Report
31st May 20125:52 pmRNSTotal Voting Rights
18th May 201212:49 pmRNSIssue of Equity and TVR
30th Apr 20127:00 amRNSNtorya-1 Update
27th Apr 201212:27 pmRNSDirector's Dealings
12th Apr 20127:00 amRNSAusable EOR Project Update, Canada
11th Apr 20121:40 pmRNSNtorya-1 Update, Tanzania
5th Apr 20127:00 amRNSInvestment in Argentina
5th Apr 20127:00 amRNSInvestment in Argentina
3rd Apr 20127:00 amRNSDrilling Update, Canada
2nd Apr 20121:00 pmRNSDrilling Update Ntorya-1, Tanzania
30th Mar 20127:00 amRNSUnaudited Interim Results
26th Mar 20127:00 amRNSBoard Change
6th Mar 20127:00 amRNSOperational Update, Canada
2nd Mar 20127:00 amRNSAppointment of Joint Broker
29th Feb 20124:03 pmRNSTotal Voting Rights
28th Feb 20127:00 amRNSIssue of Equity
27th Feb 20127:00 amRNSDrilling Report
16th Feb 20127:00 amRNSOperational Update, Canada
10th Feb 20122:15 pmRNSNtorya-1 Drilling Update
7th Feb 20127:00 amRNSDrilling Report
1st Feb 20127:00 amRNSIssue of Equity
31st Jan 20123:16 pmRNSTotal Voting Rights
27th Jan 20127:00 amRNSDrilling Update
24th Jan 20127:00 amRNSOperational Update, Canada
10th Jan 20127:00 amRNSNtorya-1 Drilling Update
6th Jan 20127:00 amRNSIssue of Equity
3rd Jan 201210:33 amRNSCanadian Exploration and Development Update
30th Dec 20117:00 amRNSTotal Voting Rights
23rd Dec 201111:07 amRNSTanzania Drilling Update
16th Dec 20112:31 pmRNSUpdate Re Investment
16th Dec 20111:56 pmRNSResult of AGM
5th Dec 20117:00 amRNSTanzania Drilling Update
1st Dec 20117:56 amRNSDisposal of Argentine Subsidiary
1st Dec 20117:00 amRNSInvestment in Argentina
30th Nov 20117:00 amRNSReport and Accounts and Notice of AGM
25th Nov 20117:00 amRNSAdditional investment
21st Nov 20117:00 amRNSTanzania Drilling Update
10th Nov 20117:00 amRNSEquity Line Facility
7th Oct 20117:00 amRNSDrilling Report
6th Oct 201110:18 amRNSTanzania Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.