We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSOLO.L Regulatory News (SOLO)

  • There is currently no data for SOLO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill-1 Continuing Oil Flowing

17 Feb 2016 07:00

RNS Number : 2656P
Solo Oil Plc
17 February 2016
 

FOR IMMEDIATE RELEASE, 7:00 am 17 February 2016

 

SOLO OIL PLC

("Solo" or the "Company")

 

Update Horse Hill-1 Oil Discovery

Continuing Oil Flowing to Surface from Lower Kimmeridge Limestone

 

Solo today notes that UK Oil and Gas plc ("UKOG") have released a further announcement that light (40 degree API) dry oil has continued to flow naturally at a stabilised rate of over 450 barrels of oil per day ("bopd") from the Lower Kimmeridge limestone interval in the Horse Hill-1 well in PEDL137 during a second day of testing. Flow testing was performed for a total of 9 ½ hours yesterday through a smaller 28/64-inch choke and the produced oil has been sent by tanker to be refined.

Solo owns a 6.5% interest in PEDL137 which is located on the north side of the UK Weald Basin close to Gatwick airport.

Neil Ritson, Solo's Chairman commented:

"The exciting initial flow rate of over 450 bopd has been maintained for a second day which is further encouraging news from this well. Two further intervals are yet to be tested and we look forward to further news in the coming days."

Qualified Person's Statement:

The information contained in this announcement has been reviewed and approved by Neil Ritson, Chairman and Director of Solo Oil plc who has over 38 years of relevant experience in the energy sector. Mr. Ritson is a member of the Society of Petroleum Engineers, an Active Member of the American Association of Petroleum Geologists and is a Fellow of the Geological Society of London.

 

For further information:

Solo Oil plc

Neil Ritson

Fergus Jenkins

+44 (0) 20 3794 9230

 

 

Beaumont Cornish Limited

Nominated Adviser and Joint Broker

Roland Cornish

+44 (0) 20 7628 3396

 

Shore Capital

Joint Broker

Pascal Keane

Jerry Keen (Corporate Broker)

 

Bell Pottinger

Public Relations

Henry Lerwill

 

Cassiopeia Services LLP

Investor Relations

Stefania Barbaglio

 

+44 (0) 20 7408 4090

 

 

 

 

 

+44 (0) 20 3772 2500

 

 

 

+44 (0) 79 4969 0338

 

Glossary:

 

API

American Petroleum Institute

bopd

barrels of oil per day

choke

a device incorporating a fixed or variable orifice that is used to control fluid flow rate during testing of an exploratory discovery

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

dry oil

crude oil produced with no appreciable quantity of water

extended flow test

a flow test, as per the permission granted by the Oil and Gas Authority, with an aggregate flow period duration over all zones of greater than 96 hours and up to 90 days maximum.

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz sand

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDMGMZMVRGVZZ
Date   Source Headline
31st Jul 20125:04 pmRNSTotal Voting Rights
26th Jul 20123:15 pmRNSIssue of Equity
2nd Jul 20127:00 amRNSRuvuma Independent Evaluation
29th Jun 20123:24 pmRNSIssue of Equity and TVR
28th Jun 20127:00 amRNSTanzania Test Results
22nd Jun 201211:37 amRNSIssue of Equity
21st Jun 20121:15 pmRNSNtorya-1 Testing, Tanzania
20th Jun 201212:54 pmRNSIssue of Options
18th Jun 20129:27 amRNSDrilling Report
18th Jun 20127:00 amRNSDrilling Report
31st May 20125:52 pmRNSTotal Voting Rights
18th May 201212:49 pmRNSIssue of Equity and TVR
30th Apr 20127:00 amRNSNtorya-1 Update
27th Apr 201212:27 pmRNSDirector's Dealings
12th Apr 20127:00 amRNSAusable EOR Project Update, Canada
11th Apr 20121:40 pmRNSNtorya-1 Update, Tanzania
5th Apr 20127:00 amRNSInvestment in Argentina
5th Apr 20127:00 amRNSInvestment in Argentina
3rd Apr 20127:00 amRNSDrilling Update, Canada
2nd Apr 20121:00 pmRNSDrilling Update Ntorya-1, Tanzania
30th Mar 20127:00 amRNSUnaudited Interim Results
26th Mar 20127:00 amRNSBoard Change
6th Mar 20127:00 amRNSOperational Update, Canada
2nd Mar 20127:00 amRNSAppointment of Joint Broker
29th Feb 20124:03 pmRNSTotal Voting Rights
28th Feb 20127:00 amRNSIssue of Equity
27th Feb 20127:00 amRNSDrilling Report
16th Feb 20127:00 amRNSOperational Update, Canada
10th Feb 20122:15 pmRNSNtorya-1 Drilling Update
7th Feb 20127:00 amRNSDrilling Report
1st Feb 20127:00 amRNSIssue of Equity
31st Jan 20123:16 pmRNSTotal Voting Rights
27th Jan 20127:00 amRNSDrilling Update
24th Jan 20127:00 amRNSOperational Update, Canada
10th Jan 20127:00 amRNSNtorya-1 Drilling Update
6th Jan 20127:00 amRNSIssue of Equity
3rd Jan 201210:33 amRNSCanadian Exploration and Development Update
30th Dec 20117:00 amRNSTotal Voting Rights
23rd Dec 201111:07 amRNSTanzania Drilling Update
16th Dec 20112:31 pmRNSUpdate Re Investment
16th Dec 20111:56 pmRNSResult of AGM
5th Dec 20117:00 amRNSTanzania Drilling Update
1st Dec 20117:56 amRNSDisposal of Argentine Subsidiary
1st Dec 20117:00 amRNSInvestment in Argentina
30th Nov 20117:00 amRNSReport and Accounts and Notice of AGM
25th Nov 20117:00 amRNSAdditional investment
21st Nov 20117:00 amRNSTanzania Drilling Update
10th Nov 20117:00 amRNSEquity Line Facility
7th Oct 20117:00 amRNSDrilling Report
6th Oct 201110:18 amRNSTanzania Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.