Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksStrategic Minerals Regulatory News (SML)

Share Price Information for Strategic Minerals (SML)

Share Price is delayed by 15 minutes
Get Live Data
4.10    -0.15 (-3.53%)
Bid:
4.00
Ask:
4.20
Spread: 0.20 (5.00%)
Market Cap: £115.57m
SML Live PriceLast checked at - London Stock Exchange

Intraday Strategic Minerals Share Chart

Redmoor Critical Minerals Project Updates

11 Sep 2025 07:00

RNS Number : 8686Y
Strategic Minerals PLC
11 September 2025
 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR') which has been incorporated into UK law by the European Union (Withdrawal) Act 2018.

 

11 September 2025

 

Strategic Minerals plc

("Strategic Minerals" or the "Company")

Redmoor Critical Minerals Project Updates

 

Three drill holes completed with all intersecting the full thickness of the sheeted vein system; second drill rig mobilised to Redmoor

 

Strategic Minerals plc (AIM: SML; USOTC: SMCDF), an international mineral exploration and production company, is pleased to provide an update from its wholly owned subsidiary, Cornwall Resources Limited ("CRL"). CRL is exploring for resources of tungsten, tin, and copper in its Tamar Valley licence areas in east Cornwall, with a key focus on its Redmoor Tungsten-Tin-Copper Project ("Redmoor").

CRL Redmoor Drill Programme Update

The first set of drill holes at Pad 1 from CRL's exploration drilling programme at Redmoor has been completed. Three drill holes were sited at Pad 1: CRD033, CRD034b, and CRD035 (see Table 1).

Table 1: Drill hole collar details, Pad 1

Pad Location

Hole ID

Easting

Northing

Azimuth at Collar

Dip at Collar

Total Length (m)

1

CRD033

235801.7

71342.07

165

65

600.4

1

CRD034b

235802.1

71342.02

135

56

608.2

1

CRD035

235802.3

71342.09

145

54

512.4

 

All three holes intersected the full thickness of the Redmoor sheeted vein system (the "SVS"). Geological logging indicates the presence of visible wolframite (a chief tungsten-bearing mineral) and chalcopyrite (a copper-bearing mineral), consistent with mineralisation previously identified and modelled at Redmoor (see Figure 1).

The Redmoor SVS hosts zones of higher grade mineralisation that formed the basis of the 2019 Mineral Resource Estimate ("MRE 2019"), reported in accordance with the JORC Code (2012 Edition). Logging from the Pad 1 holes has identified zones of visible mineralisation consistent with this model. Final interpretation will be confirmed once laboratory assay results are received. Detailed drillhole descriptions and key sample intersections will be reported following receipt of analytical data.

Dennis Rowland, CRL Managing Director, commented:

"Geological logging and sample selection of the first three boreholes of our 2025 programme is complete, with core cutting and shipment of sample batches in process. With the rig move complete, and the second drilling rig now onsite, we expect to see an acceleration in the programme through to December.

Each of the drill holes has intersected the Redmoor sheeted vein system. Logging by CRL's geologists has recorded the presence of visible wolframite and chalcopyrite, consistent with mineralisation observed in previous drilling at Redmoor. Assay results will provide confirmation, and we look forward to reporting these as the programme advances."

Drilling Highlights

· CRD033 - Intersected the full apparent width of the SVS from 428.00 m to 562.00 m downhole. Visual logging indicates the presence of wolframite and chalcopyrite in several zones consistent with historic data. The hole was designed to twin a historic drill hole from the 1980s to test data validity and continuity. CRD033 has been sampled in its entirety and 398 samples have been submitted to ALS Loughrea for assay. Results will be reported once received.

· CRD034b - Intersected the SVS from 438.50 m to 582.70 m, with visible wolframite and chalcopyrite recorded during logging. This drill hole has been fully logged and evaluated by CRL's geologists, and sample cutting is underway. CRD034b was extended to over 600 m, from a planned 550 m hole, due to additional observed mineralisation. A total of 219 samples has been selected from 312.23 m of combined sample intervals.

· CRD035 - Intersected the SVS from 444.35 m to 487.40 m, with logging confirming visible tungsten and copper sulphide mineralisation typical of the Redmoor deposit. Figure 2 shows a selected example of drill core from CRD035, illustrating quartz veins within the SVS. The core displays visible wolframite and chalcopyrite within greisen-bordered veins typical of the Redmoor deposit.

· Drilling of CRD035 has concluded, and the rig has now moved to Pad 2, with CRD036 having commenced on 9 September.

· Following completion of a supplementary permission from Cornwall Council, a second drilling rig has now joined the programme, having been mobilised to site on 8 September. Site establishment on Pad 3 is scheduled for 11 September, with drill hole CRD037 set to commence drilling shortly after. Both drill rigs will be in place for up to a further three months, to support the completion of the fully funded programme, with up to three drill holes planned from each pad.

Sampling and QA/QC Procedures

The sampling, logging, and QA/QC protocols applied in the 2025 drilling programme are consistent with those used for the 2019 MRE, which was reported in accordance with the JORC Code (2012 Edition). These procedures have since been reviewed and updated under the direction of the current Competent Person, Mr Laurie Hassall, to further strengthen data quality and alignment with industry best practice. The programme incorporates certified reference materials, blanks, and laboratory duplicates at regular intervals, as well as umpire assays. Full details of methods and QA/QC will be reported alongside assay results once available.

Programme Updates

Additional work programmes are underway to support the successful completion of the Shared Prosperity funded programme, and subsequent MRE and project economics updates. These include the selection of samples for metallurgical testwork, petrographic and mineralogical studies, and ore sorting amenability testing. These studies are due to commence shortly and are designed to improve the understanding of processing design, concentrate recoverability, and grades.

All datasets from the 2025 drilling and related studies will feed into an updated Redmoor MRE to be reported in accordance with the JORC Code (2012 Edition). This updated MRE is expected to be completed in Q1 2026. The current MRE, reported in accordance with the JORC Code (2012 Edition) in 2019, is 11.7 Mt at 1.17% tin equivalent (0.56% WO₃, 0.16% Sn, 0.50% Cu). This highlights the high tungsten content of the Redmoor deposit relative to many other global tungsten projects.

Tungsten Market Update

CRL notes that, as of September 2025, Ammonium Paratungstate (APT, 88.5% WO₃, FOB basis) prices have risen 45% within a month to $655 per metric ton unit ("mtu"). EU/US APT prices are reported at US$535-550/mtu (+64.4% year-to-date) (as reported by Fastmarkets). The Redmoor Scoping Study (2020) was based on a tungsten price assumption of US$330/mtu. These changes reflect ongoing shifts in the global tungsten market, such as the closure of some previously subsidised Chinese operations and a growing emphasis on supply security for defence and high-technology applications.

 

Figure 1: Example of coarse wolframite (tungsten) minerals and chalcopyrite (copper) mineralised exploration drill core from drill hole CRD033, as logged and sampled by CRL geologists. The core photograph shown is a selected example of logged drill core and is not necessarily representative of all mineralisation encountered. Laboratory assays are pending and will provide quantitative results.

 

Figure 2: Section of boxed drill core from CRD035 illustrating quartz-greisen sheeted veins typical of the Redmoor deposit. Visible wolframite and chalcopyrite mineralisation can be seen within the vein system. The photograph is a selected example of logged drill core and is not necessarily representative of the overall mineralisation encountered. Laboratory assays are pending and will provide the quantitative results.

 

 

For further information, please contact:

 

Strategic Minerals plc

+44 (0) 207 389 7067

Mark Burnett

Executive Director

Website:

www.strategicminerals.net

Email:

info@strategicminerals.net

 

 

Follow Strategic Minerals on:

X:

@SML_Minerals

LinkedIn:

https://www.linkedin.com/company/strategic-minerals-plc

 

SP Angel Corporate Finance LLP

 

+44 (0) 20 3470 0470

Nominated Adviser and Broker

Matthew Johnson/Charlie Bouverat/Grant Barker

Zeus Capital Limited

+44 (0) 203 829 5000

Joint Broker

Harry Ansell/Katy Mitchell

Vigo Consulting

+44 (0) 207 390 0234

Investor Relations

Ben Simons/Peter Jacob/Anna Sutton

Email:

strategicminerals@vigoconsulting.com

 

Notes to Editors

About Strategic Minerals Plc and Cornwall Resources Limited

Strategic Minerals plc (AIM: SML; USOTC: SMCDY) is an AIM-quoted, producing minerals company, actively developing strategic projects in the UK, United States and Australia.

In 2019, the Company completed the 100% acquisition of Cornwall Resources Limited and the Redmoor Tungsten-Tin-Copper Project.

The Redmoor Project is situated within the historically significant Tamar Valley Mining District in Cornwall, United Kingdom, with a JORC (2012) Compliant Inferred Mineral Resource Estimate published 14 February 2019:

Cut-off (SnEq%)

Tonnage (Mt)

WO3

%

Sn

%

Cu

%

Sn Eq1

%

WO3 Eq

%

>0.45

1.50

0.18

0.21

0.30

0.58

0.41

>0.65

10.20

0.62

0.16

0.53

1.26

0.88

Total Inferred Resource

11.70

0.56

0.16

0.50

1.17

0.82

1 Equivalent metal calculation notes; Sn(Eq)% = Sn% x 1 + WO3% x 1.43 + Cu% x 0.40. WO3(EQ)% = Sn% x 0.7 + WO3 + Cu% x 0.28. Commodity price assumptions: WO3 US$ 33,000/t, Sn US$ 22,000/t, Cu US$ 7,000/t. Recovery assumptions: total WO3 recovery 72%, total Sn recovery 68% & total Cu recovery 85% and payability assumptions of 81%, 90% and 90% respectively

More information on Cornwall Resources can be found at: https://www.cornwallresources.com

In September 2011, Strategic Minerals acquired the distribution rights to the Cobre magnetite project in New Mexico, USA, through its wholly owned subsidiary Southern Minerals Group. Cobre has been in production since 2012 and continues to provide a sustainable revenue stream for the Company.

In March 2018, the Company acquired the Leigh Creek Copper Mine situated in the copper rich belt of South Australia. The Company has entered into an exclusive Call Option with South Pacific Mineral Investments Pty Ltd trading as Cuprum Metals to acquire 100% of the project.

About the CIOS Good Growth Fund and UK Shared Prosperity Fund

This project is part-funded by the UK Government through the UK Shared Prosperity Fund. Cornwall Council is responsible for managing projects funded by the UK Shared Prosperity Fund through the Cornwall and the Isles of Scilly Good Growth Programme.

Cornwall and Isles of Scilly has been allocated £184 million for local investment through the Shared Prosperity Fund. This new approach to investment is designed to empower local leaders and communities, so they can make a real difference on the ground where it's needed the most.

UK Shared Prosperity Fund

The UK Shared Prosperity Fund proactively supports delivery of the UK-government's five national missions: pushing power out to communities everywhere, with a specific focus to help kickstart economic growth and promoting opportunities in all parts of the UK.

For more information, visit

https://www.gov.uk/government/publications/uk-shared-prosperity-fund-prospectus

For more information, visit https://ciosgoodgrowth.com

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDEAENEFESSEAA
Date   Source Headline
25th Jun 20267:00 amRNSAppointment of Non-Executive Director
24th Jun 20261:30 pmRNSResult of Annual General Meeting
23rd Jun 20267:00 amRNSRedmoor – Drill Programme and Analysis Update
11th Jun 20267:00 amRNSProposed Appointment of Non-Executive Director
2nd Jun 20267:00 amRNSOperational Update
28th May 20265:36 pmRNSNotice of Annual General Meeting
20th May 20267:00 amRNSFinal Results
12th May 20267:00 amRNSRedmoor - Drilling Update
7th May 20267:00 amRNSRedmoor - Update to Historical Tin Results
1st Apr 202612:18 pmRNSTotal Voting Rights
31st Mar 20267:00 amRNSRedmoor-Initiation of Resource Infill Drilling
30th Mar 20267:00 amRNSHolding(s) in Company
26th Mar 20267:05 amRNSRedmoor - Updated Economic Sensitivity Analysis
26th Mar 20267:00 amRNSRedmoor - 2026 Mineral Resource Estimate
23rd Mar 20267:00 amRNSNotice of MRE/Economic Update & Webinar
20th Mar 20267:00 amRNSRedmoor- Significant Increase in Tungsten Recovery
19th Mar 20267:00 amRNSSubscription to Raise £4.7 Million
17th Mar 20267:00 amRNSRedmoor - Infill Drilling Contract Signed
17th Mar 20267:00 amRNSRedmoor - Infill Drilling Contract Signed
5th Mar 20267:00 amRNSRedmoor - Ultra-High-Grade Drill Results
26th Feb 20267:00 amRNSRedmoor - Discovery of New Tin Zone
25th Feb 20267:00 amRNSRedmoor: Further Positive Drill Results
13th Feb 20267:00 amRNSGrant of Options
12th Feb 20267:00 amRNSRedmoor: Positive Results from Exploration Target
5th Feb 20267:00 amRNSRedmoor-Results Expand Modelled Orebody
30th Jan 20265:20 pmRNSPDMR Holdings in the Company
29th Jan 20267:00 amRNSRedmoor-Successful Twin Drilling+New Deposit Model
28th Jan 20267:00 amRNSRedmoor-Continued High-Grade Tungsten + Tin Zone
22nd Jan 20267:00 amRNSPlacing and Subscription to Raise £4 Million
9th Jan 20267:00 amRNSQ4 & 2025 Trading Update
22nd Dec 20257:00 amRNSLeigh Creek Copper Mine - Call Option Exercised
22nd Dec 20257:00 amRNSLeigh Creek Copper Mine - Call Option Exercised
16th Dec 20257:00 amRNSHolding(s) in Company
16th Dec 20257:00 amRNSHolding(s) in Company
11th Dec 20257:00 amRNSRedmoor Drilling Continues to Deliver
2nd Dec 20257:00 amRNSTotal Voting Rights
1st Dec 20257:00 amRNSRedmoor Drilling Update
27th Nov 202510:45 amRNS-RAttendance at Industry Conferences
25th Nov 20257:00 amRNSRedmoor – Very High-Grade Sample Results
19th Nov 20254:16 pmRNSExercise of Warrants and Total Voting Rights
12th Nov 20257:00 amRNSRedmoor Drilling & Metallurgical Study Updates
10th Nov 20257:00 amRNSRedmoor – Update to Previous Drilling Results
4th Nov 20254:43 pmRNSHolding(s) in Company
24th Oct 20257:00 amRNSTrading Update
20th Oct 20257:00 amRNSRedmoor Drilling & Programme Updates
16th Oct 20257:42 amRNS-RNotice of Investor Webcast & Updated Presentation
15th Oct 20254:50 pmRNSHolding(s) in Company
13th Oct 20257:00 amRNSRedmoor - Exceptional Tungsten Drilling Results
30th Sep 20257:00 amRNSHalf-Year Report 2025
25th Sep 20253:48 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.