Less Ads, More Data, More Tools Register for FREE

Pin to quick picksSLE.L Regulatory News (SLE)

  • There is currently no data for SLE

Nowa Sol Operations Update

28 Dec 2012 07:00

RNS Number : 4112U
San Leon Energy PLC
28 December 2012
 



28 December 2012

 

San Leon Energy Plc

("San Leon" or the "Company")

 

Nowa Sol Operations Update

 

San Leon is pleased to announce a year end update on its Nowa Sol operations. The Nowa Sol exploration program is designed to test both the conventional potential and significant unconventional potential of the self-sourcing Permian Main Dolomite (Ca2). The Main Dolomite, the primary oil-producing reservoir in Poland, is a high potential, underexplored play that San Leon is focusing on for near term oil production while the Company's large scale assets develop. Due to the self-sourcing and naturally fractured nature of the Ca2, San Leon is evaluating the unconventional potential of the interval as a significant oil producer. Initial core results indicate the formation is an ideal fracturing (frac) candidate based upon the highly brittle nature of the Main Dolomite, which is encased in perfect frac barriers in the Zechstein salts and anhydrites. The Company is looking at potential analogues in the United States including the Mississippian Limestone and the Bakken Formation to understand drilling and completion techniques to unlock the huge upside potential of the play including long offset horizontals and hydraulic fracturing. Potential analogue production for the unconventional potential of the play is also present in older completions in the Main Dolomite of Eastern Germany.

 

Czasław SL-1

The Czasław SL-1 well has reached a total depth of 1,558 meters Measured Depth (1,229 meters TVD) just below the target Permian Main Dolomite reservoir. The well has been completed for future production testing and is currently shut-in for future operations. The well penetrated 43 meters of the targeted Permian Main Dolomite. Image logs show moderate fracturing of the Main Dolomite within an estimated 29 meters of fractured reservoir interval. A full suite of wireline logs were acquired across the interval including a high quality FMI (Image) log. Fifty rotary sidewall cores were extracted and sent to Weatherford's laboratory in the US to evaluate reservoir properties and fluid saturations. Live oil shows were present on 90% of the extracted cores and detailed petrophysical analysis indicates moveable oil in the Main Dolomite reservoir. The entire Main Dolomite interval shows high fluoresce suggesting both moveable and residual oil. Results suggest the well is a good candidate for artificial stimulation to enhance the natural fractures in the reservoir. There were no indications of water encountered during drilling. Testing is expected to occur in Q1 2013 dependent on permitting for cleanup, stimulation, and testing plans.

 

Potential stimulation options including acid treatments and fracing are being examined to extract the unconventional oil potential of the interval which exists in the matrix of the formation over a large regional area. The key to the play is finding potential "sweet spots" where reservoir properties are favorable for horizontal completions and artificial stimulation. After evaluating the results the Company will make a decision regarding stimulation in the existing completion and a potential horizontal section off the existing well.

 

Lelechow SL-1

The Lelechow SL-1 well has been shut-in after an extended well testing program was carried out to examine if oil could be flowed with the current completion design at commercial rates. Significant natural fracturing has been encountered in the well, which is considered to be a "thief zone;" this fracturing is bringing in significant surrounding formation water preferentially over the oil saturation in the matrix. Analysis indicates lifting the formation water off the reservoir section could create sufficient pressure draw down to flow oil in the matrix at commercial rates. Due to the high costs of short term water disposal, the well has been shut-in whilst the Company evaluates more cost effective long term options.

 

The Company is now considering several potential future options including sidetracking the well up-dip to access a predicted free oil leg within the fracture system, as well as examining other options to stimulate the interval including drilling a possible horizontal section off the existing well. A decision will be taken following results from the Czasław SL-1 test of the same reservoir.

 

The self-sourcing, highly fractured Main Dolomite reservoir encountered good oil shows while drilling with matrix oil saturations up to 70% confirmed by detailed core analysis of whole core and rotary sidewall cores recovered from the well. The analysis was carried out by Weatherford in the US.

 

 

Executive Chairman, Oisin Fanning commented:

 

"We continue to be excited by the potential of the Main Dolomite oil play in our expansive Permian Basin acreage in Poland. Our first two wells have helped us to better understand the potential of the play and the challenges. We look forward to testing the Czasław well as soon as our engineering and permitting efforts are completed. We have found oil in the Main Dolomite and are working on ways to economically produce from these wells as well as extend our results to the significant upside that exists across our acreage."

 

 

For further information contact:

 

San Leon Energy Plc

Tel: +353 1291 6292

Oisin Fanning, Executive Chairman

John Buggenhagen, Exploration Director

Macquarie Capital (Europe) Limited

Tel: +44 (0) 20 3037 2000

John Dwyer

Fox Davies Capital

Tel: +44 (0) 20 3463 5000

Daniel Fox-Davies

Richard Hail

FirstEnergy Capital LLP

Tel: +44 (0) 20 7448 0200

Hugh R. Sanderson

David Van Erp

Westhouse Securities (Nominated Advisor)

Tel: +44 (0) 20 7601 6100

Richard Johnson

Antonio Bossi

College Hill Associates

Tel: +44 (0) 20 7457 2020

Rupert Trefgarne

Alexandra Roper

 

www.sanleonenergy.com

 

Qualified person

 

John Buggenhagen, who has reviewed this update, has over 15 years experience in the oil & gas industry. He has a Ph.D. and M.Sc. in Geophysics from the University of Wyoming and a B.Sc. in Geophysics from the University of Arizona. He is currently the Director of Exploration for the San Leon Energy Group and based in San Leon's Warsaw office in Poland.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDDLFLLLFFFBQ
Date   Source Headline
29th Nov 20113:21 pmRNSExercise of Options
17th Nov 20117:00 amRNSLewino 1G-2 Drilled
11th Nov 20115:47 pmRNSCompletion of acquisition
11th Nov 20119:52 amRNSCommencement of drilling
10th Nov 20115:10 pmRNSAdmission of new shares re Realm
2nd Nov 20119:10 amRNSRealm Energy shareholder approval
21st Oct 20113:15 pmRNSResults of Belvedere-1 Well
19th Oct 20117:44 amRNSBarryroe Update
18th Oct 20112:30 pmRNSNew Licencing Option
12th Oct 20113:48 pmRNSSpudding of Belvedere-1 Well
12th Oct 201110:11 amRNSRealm Energy Acquisition Update
5th Oct 201112:30 pmRNSHolding(s) in Company
3rd Oct 20115:10 pmRNSDirector/PDMR Shareholding
30th Sep 20117:00 amRNSInterim Results
29th Sep 20117:00 amRNSResults of Chopin-1 Well
26th Sep 20111:04 pmRNSCommencement of drilling
23rd Sep 201112:29 pmRNSResult of AGM
21st Sep 201111:34 amRNSRealm Energy Announcement
5th Sep 20113:17 pmRNSCommencement of drilling
1st Sep 201111:06 amRNSBelvedere -1 exploration well
31st Aug 20119:47 amRNSInvestor Presentation
26th Aug 20118:35 amRNSAcquisition of Realm Energy
12th Aug 20114:35 pmRNSPrice Monitoring Extension
2nd Aug 20117:00 amRNSCompletion of 3D Seismic
29th Jul 20117:00 amRNSDrilling Update
19th Jul 20112:09 pmRNSAdditional Listing
30th Jun 20117:00 amRNSFinal Results
23rd Jun 201110:12 amRNSOperational update
14th Jun 201110:13 amRNSHolding(s) in Company
3rd May 201111:14 amRNSCommencement of Seismic Survey
29th Mar 20117:00 amRNSOperational Update
23rd Mar 20112:28 pmRNSAdditional Listing
22nd Mar 20117:00 amRNSJoint Participation Agreement
18th Mar 20118:35 amRNSCommencement of Seismic Servey
10th Mar 20117:00 amRNSRockall Licence Update
2nd Mar 201110:18 amRNSHolding(s) in Company
8th Feb 20114:18 pmRNSAdditional Listing
4th Feb 20117:00 amRNS3D Seismic Survey Completed
3rd Feb 20117:28 amRNSReplacement: Durresi Licence Approval
3rd Feb 20117:00 amRNSDurresi Licence Approval
26th Jan 20119:50 amRNSAdditional Listing
18th Jan 20117:00 amRNSHolding(s) in Company
14th Jan 20117:00 amRNSApproval received
12th Jan 20114:44 pmRNSHolding(s) in Company
12th Jan 20117:00 amRNSRockall licence update
6th Jan 20112:14 pmRNSBoard Changes
5th Jan 201112:11 pmRNSHolding(s) in Company
31st Dec 20108:12 amRNSCompletion of Placing
30th Dec 201012:40 pmRNSResult of EGM
22nd Dec 20104:49 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.