Significant DSO Tonnage Increase at Nimba Project

4 Feb 2015 07:00

RNS Number : 9637D
Sable Mining Africa Limited
04 February 2015
 

Sable Mining Africa Ltd / Index: AIM / Epic: SBLM / Sector: Natural Resources

4 February 2015

Sable Mining Africa Limited ('Sable Mining' or 'the Company')

Significant DSO Tonnage Increase Demonstrated in Resource Update

at Nimba Iron Ore Project

 

Sable Mining Africa Limited, the AIM listed exploration company, is pleased to announce a further JORC Code (2012) compliant Resource update at the Nimba Iron Ore Project in south-east Guinea ('Nimba' or 'the Project'). This follows the completion of 231 Reverse Circulation ('RC') drill holes conducted as a resource definition exploration drilling campaign across Plateau 2 and Plateau 3.

 

Overview

 

· Total JORC Resource increased to 205.2 million tonnes ('Mt') at an average in-situ grade of 57.8% iron ('Fe') from 181.8 million tonnes ('Mt') at an in-situ grade of 58.8% iron (announced 23 April 2014) - both estimated at a Fe cut-off of 40%

· Resource confidence improved with measured and indicated portion increasing by 31%, from 148.4Mt to 195.0Mt

· Significant anticipated increase in premium DSO product - on-going investigation has identified the upper portion of the unconsolidated domain to contain a very low clay content, which is expected to be screenable as a DSO product thereby significantly increasing the potential lump and fines products available for DSO mining

· DSO product will require a relatively simple crush and screen, and thereby a reduced operating cost is anticipated

· Considerable further potential to increase current JORC Reserve and enhance the robust fundamentals demonstrated in the Preliminary Feasibility Study ('PFS')

o PFS was based on a maiden JORC Reserve of 53.96Mt at a grade of 61.6% Fe calculated from the August 2013 JORC Resource of 135.5Mt @ 59.4% Fe

· Metallurgical test work to progress marketing studies for Sable Mining's end product is on-going, based on 16 HQ and 26 PQ drill hole's core, and detailed product characteristics are expected Q3 2015

· Results confirm the deposit contains easily fragmented rock (UCS averaging 20Mpa and CWI averaging 3kWh/t), which will allow for high crushing rates at low power consumption

· Further drop tower test work has confirmed the initial overall lump yields, with higher lump yields in the P2 South area - the high proportion and quality of lump product is expected to achieve a premium to the prevailing iron ore spot price as it is a direct blast furnace feed and does not require sintering

· Re-evaluated timeline for feasibility studies to take into account Liberian infrastructure development, as per Infrastructure Development Agreement announced on 26 January 2015 - a study progress report and updated Reserve statement is scheduled for Q3 2015 and full Bankable Feasibility Study to be published by Q1 2016

 

Sable Mining CEO Andrew Groves said, "Swiftly following on the back of our landmark rail access and infrastructure development agreement with the Government of the Republic of Liberia, this increase in our JORC compliant resource to 205.2Mt further highlights the scope, scale and potential commercial value of this asset. It is of particular importance to note the increase in screenable DSO material together with the higher lump yields, as this will directly impact the quality of our final saleable product and potentially further enhance margins.

 

"The Sable Mining team continue to drive progress at Nimba forward as we approach our ultimate goal of achieving commercial iron ore production in H2 2016. In line with this, the additional components of our development continue to make headway; mine design / scheduling and metallurgical test work is underway to progress the marketing studies for our end product. I look forward to providing additional news in due course as we look to unlock the significant value of Nimba for the benefit of all stakeholders, and open up this region as a new development corridor between the Republic of Guinea and the Republic of Liberia."

 

Updated Resource Statement

 

Table 1: Nimba Mineral resource statement for January 2015

Category

Fe Cut-off (%)

Tonnes* (Mt)

Bulk Density (t/m3)

Fe (%)

SiO2 (%)

Al2O3 (%)

P (%)

LOI (%)

Measured

40

20.8

3.1

61.4

3.6

3.3

0.08

4.9

Indicated

40

174.2

2.8

57.5

6.3

4.6

0.08

6.3

Inferred

40

10.2

2.7

55.8

7.8

5.0

0.08

6.9

Total

40

205.2

2.9

57.8

6.1

4.5

0.08

6.2

* The tonnage has been factored to account for cavities

 

Table 2: Nimba Mineral resource statement for April 2014

Category

Fe Cut-off (%)

Tonnes* (Mt)

Bulk Density (t/m3)

Fe (%)

SiO2 (%)

Al2O3 (%)

P (%)

LOI (%)

Indicated

40

148.4

2.7

59.0

4.7

4.1

0.08

6.3

Inferred

40

33.4

2.7

57.7

5.3

5.0

0.08

6.6

Total

40

181.8

2.7

58.8

4.9

4.3

0.08

6.3

* The tonnage has been factored to account for cavities

 

Xstract Mining Consultants, an Australia-based consultancy group and wholly-owned subsidiary of engineering services company Calibre Group, which has significant expertise in iron ore, conducted the Updated Resource Estimate for Nimba.

 

The updated JORC code (2012) compliant resource estimate was conducted to incorporate an additional 231 Reverse Circulation ('RC') drill holes. The deposit consists of detrital iron mineralisation known as 'canga' that has been deposited in palaeochannels adjacent to the Mount Nimba mountain range.

 

Sable Mining has drilled a total of 604 drill holes (12,512.86 metres), made up of 373 diamond core ('DC') drill holes (7,167.86 metres) and 231 Reverse Circulation ('RC') drill holes(5,345 metres) in and around the current P2N1, P2N2, P2S, P2E, P3N and P3S areas. The majority of the drill holes are orientated vertically while the remaining are inclined (74). The average depth drilled is 20.7 metres. The drill holes are located along drill lines orientated north-easterly. The spacing of the drill lines and drill holes along the lines results in drilling grids of 400 metres by 400 metres, 200 metres by 200 metres and 100 metres by 100 metres. These grids have been in-filled with RC drill holes improving limited areas to a 50 metres by 50 metres grid. To ensure JORC compliance, drill hole information considered as below an acceptable quality control standard was excluded. 

 

Prior to November 2012, drill hole samples were prepared by ALS Bamako and analysed at ALS Ireland by XRF methods. After this date samples were prepared by ALS Bamako but analysed using XRF methods by Ultra Trace in Perth. The pre-November 2012 LOI results displayed a bias due to handling procedures at ALS Ireland and the pulps of these samples were re-assayed by Ultra Trace in Perth. The Quality Assurance/Quality Control(QAQC) analyses show a marked improvement in accuracy and precision since the changeover.

 

The mineral resource estimate was completed in Datamine software using a three dimensional block model (parent block size of 100 metres by 100 metres by 6 metres in the X, Y and Z directions respectively). A full suite of Fe elements were estimated into the blocks using ordinary kriging from composited drill hole samples where the targeted composited length is 1 metre. The estimation was restricted by project and domain code, while the search was restricted to the search ellipse and a maximum of five samples per drill hole. The search distance was based on the general semi-variogram range and the direction was dictated by the anisotropy evident in the semi-variogram fan for the major areas. Statistical and spatial comparison of the block model grades to the drill hole samples shows strong similarities but a slight smoothing of the model has occurred due to drill hole spacing. The tonnage of each block has been adjusted by a factor that reflects the estimated proportion of cavities for each parent block, based on areas where such cavities have been recorded. The mineral resource is stated as within the mining permit boundary.

 

Feasibility Study

 

The Company has recalculated the schedule for its feasibility studies in light of the recently announced Infrastructure Development Agreement with the Government of Liberia. A study progress report will be completed in Q3 2015 which will provide an update of the operational and economic viability of Nimba taking into account ongoing detailed studies relating to mine and haul road design in Guinea, plus further refinement of concepts where appropriate. A full Bankable Feasibility Study will then be issued by Q1 2016 which will also calculate the infrastructure development requirements in Liberia.

 

The Mineral Resource Statement has been compiled in the accordance with the guidelines defined in the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition). The JORC Table 1 is included as an attachment to this announcement.

 

The information in this announcement that relates to Mineral Exploration results and Mineral Resources, together with any related assessments and interpretations have been reviewed by a qualified geologist. Kevin Lowe, Principal Consultant Geologist at Xstract Mining Consultants Pty Ltd, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a qualified person as defined by the AIM Note for Mining and Oil & Gas Companies.

 

To view the JORC Table 1, please click here 

http://www.rns-pdf.londonstockexchange.com/rns/9637D_-2015-2-3.pdf 

** ENDS **

 

For further information please visit www.sablemining.com or contact:

Andrew Groves

Sable Mining Africa Ltd

Tel: 020 7408 9200

David Foreman

Cantor Fitzgerald Europe

Tel: 020 7894 7000

Stewart Dickson

Cantor Fitzgerald Europe

Tel: 020 7894 7000

Richard Greenfield

GMP Securities

Tel: 020 7647 2836

Susie Geliher

St Brides Partners Ltd

Tel: 020 7236 1177

Charlotte Heap

St Brides Partners Ltd

Tel: 020 7236 1177

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAXADESDSEFF
Date   Source Headline
10th Jul 20129:45 amRNSHolding(s) in Company
29th Jun 201210:10 amRNSHolding(s) in Company
28th Jun 20124:05 pmRNSDelta Mining Consolidated Corporate Update
13th Jun 20127:00 amRNSUpdate on Exploration Activities
11th Jun 20127:00 amRNSPositive Results From KPO Iron Ore Project
6th Jun 20127:00 amRNSPreliminary Assay Results Nimba Project
31st May 20123:40 pmRNSTotal Voting Rights and Share Capital
30th May 201211:30 amRNSHolding(s) in Company
30th May 20127:00 amRNSDrill Results from the Nimba Iron Ore Project
24th May 20127:00 amRNSBlock Admission
21st May 201212:10 pmRNSHolding(s) in Company
26th Apr 201210:15 amRNSHolding(s) in Company
26th Apr 201210:00 amRNSResult of AGM
23rd Apr 20124:30 pmRNSHolding(s) in Company
12th Apr 20127:00 amRNSAppointment of Non-Executive Director
5th Apr 20124:39 pmRNSHolding(s) in Company
28th Mar 20127:00 amRNSUpdate on DMC
26th Mar 20127:00 amRNSPositive Update on Iron Ore Deposits, Guinea
19th Mar 20127:00 amRNSNotice of AGM
1st Mar 20122:30 pmRNSHolding(s) in Company
21st Feb 20127:00 amRNSHolding(s) in Company
16th Feb 201210:30 amRNSHolding(s) in Company
9th Feb 20127:00 amRNSHolding(s) in Company
2nd Feb 20127:00 amRNSExpansion of Iron Ore Portfolio
21st Dec 20113:45 pmRNSInterim Results
28th Nov 20117:00 amRNSKakoulima Project Update
15th Nov 201110:00 amRNSHolding(s) in Company
5th Oct 20117:15 amRNSAppointment of Executive Director
5th Oct 20117:00 amRNSCoal Update
3rd Oct 20117:00 amRNSMajor Iron Ore Targets Defined in Liberia
22nd Sep 201111:45 amRNSDirector Dealings
2nd Sep 20111:40 pmRNSHolding(s) in Company
30th Aug 20113:05 pmRNSPosting of Annual Report & Accounts
22nd Aug 20118:35 amRNSDirector Dealings
25th Jul 20117:00 amRNSFinal Results
21st Jun 20119:45 amRNSChange of Registered Office
14th Jun 20117:00 amRNSAcquires interest in Mount Kakoulima Permit
6th Jun 20117:00 amRNSAcquires Interest in Lubimbi Coal Project
2nd Jun 20119:57 amRNSHolding(s) in Company
31st May 20117:00 amRNSAppointment of Joint Broker
12th May 20117:00 amRNSHolding(s) in Company
11th May 20117:00 amRNSBFS on Rietkuil Coal Project
4th May 20117:00 amRNSSpringbok Flats Coal Project Update
18th Apr 20114:20 pmRNSHolding(s) in Company
15th Apr 20112:50 pmRNSHolding(s) in Company
14th Apr 20116:17 pmRNSUpdate regarding Bagla Hills Iron Ore Project
6th Apr 20117:00 amRNS786 Mt Coal Seam Tonnage Modelled at Lubu Project
5th Apr 20117:00 amRNSAcquires Bagla Hills Iron Ore Project
29th Mar 20113:40 pmRNSHolding(s) in Company
28th Mar 20117:00 amRNSPositive Results from Lubu Coal Project

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.