Talon Resources Targets Ontario Gold Growth After AIM Move and Eagle Lake Acquisition, CEO Says.Watch here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRed Rock Resources Regulatory News (RRR)

Share Price Information for Red Rock Resources (RRR)

Share Price is delayed by 15 minutes
Get Live Data
0.023    0.00 (0.00%)
Bid:
0.022
Ask:
0.024
Spread: 0.002 (9.091%)
Market Cap: £2.20m
RRR Live PriceLast checked at - London Stock Exchange

Intraday Red Rock Resources Share Chart

Kenya Exploration Update

10 Aug 2021 18:23

RNS Number : 2197I
Red Rock Resources plc
10 August 2021
 

 

Red Rock Resources PLC

 

Kenya Exploration Update

Drill Programme Begins at Central KKM Gold Prospect

 

10 August 2021

 

Red Rock Resources Plc ("Red Rock" or "the Company"), the natural resource development company with interests in gold, manganese and copper announces that following the recent receipt of all permits the Company is now beginning the reverse circulation ("RC") drill programme at the Central KKM Gold Prospect, the central part of the Mikei Gold Project ("MGP" or the "Project") in Kenya announced on 30 June 2021.

Elsewhere in the MGP Red Rock continues its exploration, with 54 line KM of the planned 115 line KM of IP survey covered in the Masurura area of the Eastern license. In addition, a 300 line km magnetic survey has started at Kurutyange, also part of the Eastern License, following completion of an 11 Line km survey at the MK Prospect north of Central KKM.

HIGHLIGHTS:

· 2,000m RC drill programme begins at central KKM prospect

· Hole depths planned to be between 60m and 220m

· Possibility of extending drill programme

· 54 line km of IP covered in Masurura area of the Eastern license.

· 300 line km of Magnetics survey started in the Eastern License.

 

This programme follows up some of the recommendations accompanying the announcement of a revised Mineral Resource Estimate ("MRE") on 22 February 2021, covering the five prospects which together currently make up the MGP.

The object of the programme is to improve the confidence and classification of future MREs at the MGP through infill drilling, and by targeted step-out drilling to potentially increase the size of the Mineral Resource.

Red Rock Project Manager Joseph Komu comments: "I am extremely excited that we finally have the necessary permits for the drilling contractor to mobilize to site and start drilling. We have 19 drill pads ready for the rig and the laboratory is ready to receive the first shipment of samples for assay in the coming weeks. We are optimistic that this initial programme will spur an extended drill programme that will advance the Resource to the next stages of development".

Further Details and Background

The MGP (100% owned by Red Rock) comprises two prospecting licences which cover approximately 245 km2, namely PL/2018/0202 and PL/2018/0203, over the Migori Greenstone Belt, and are located along the northern margin of the Tanzanian Craton. The licences extend 63 km along strike of the belt, which also hosts the Kilimapesa Gold treatment plant. The North Mara Gold Mine, which is operated by Barrick Gold, is located 30 km to the south of the MGP in Tanzania.

Regional exploration in the project area began in the early 1930s and culminated in the identification and subsequent mining of the Macalder volcanogenic massive sulphide (VMS) base metal mine.

In 2010, Red Rock began the extensive task of file organisation, data digitisation and compilation of available historical data, following which CSA Global (UK) Ltd performed cross-checks and validation steps prior to loading it into a Structured Query Language (SQL) database using Datashed. During 2011 and 2012, Red Rock undertook an infill drilling programme at all five of the lode gold prospects; MK, Kakula-Kalange-Munyu (KKM), Kakula-Kalange-Munyu West (KW), Nyanza (NZ), and Gori Maria (GM) within PL/2018/0202.The Report published earlier this year documented the results of Mineral Resource estimation work initially conducted in 2011 and 2012 and revised in 2021 in order to report the Mineral Resources according to JORC (2012) guidelines.

JORC (2012) differs from earlier editions of the JORC Code in that for a Mineral Resource to be estimated it requires the application of "reasonable prospects of eventual economic extraction" ("RPEEE") principles. This has resulted in the case of the Mikei MRE in the calculation of pit shells supported by conceptual cost and gold price forecast parameters. Any material outside or below the reporting pit shell was updated as "Not Classified" since it did not meet the criteria to be reported as a Mineral Resource.

The total Mineral Resource Estimate, at both Inferred and Indicated levels, was estimated at:

15.13 Mt @ 1.49 g/t Au with contained metal content of 723 KOz Au

This compares with the Mineral Resource Estimate reported and announced in 2012 under an earlier edition of the JORC Code of 29.36 Mt at 1.26 g/t Au with contained metal content of 1,192.1 KOz Au.

Key Points of the Report:

· MRE covered the five prospect areas covered by the 2012 MRE

· Application of RPEEE principles required by JORC (2012) led to the exclusion of some previously estimated Resource areas and a consequent 39% reduction in Resource ounces of gold

· Gold grade of the MRE for the same reason increased by 18% to 1.49 g/t

· Some material previously stated as Indicated in the oxidised zone was downgraded to Inferred reflecting uncertainties relating to the terrain model and the extent of artisanal activity since 2012

· Recommendations for a first stage step-out drilling programme were made to potentially increase the size of the MRE

All prospects, except GM, were classified as Indicated and Inferred Mineral Resources. GM was classified as Inferred only, mainly due to the relatively low average RC drill recovery of 62%.

Due to the uncertain lateral extent and depth of artisanal mining at the Mikei prospects, and the lack of topographic data to accurately deplete the Mineral Resource, all oxidised material was classified as Inferred Mineral Resources.

The term "reasonable prospects for eventual economic extraction" (RPEEE) implies a realistic inventory of mineralisation which, under assumed and justifiable technical, economic and development conditions, might, in whole or in part, become economically extractable. The assumption is that the Mikei prospects will be extracted by open pit mining. The MGP block models were assessed for RPEEE by applying conceptual benchmarked costs to calculate reporting pit shells. The following conceptual parameters were applied for open pit mining:

· Mining cost: US$3/tonne

· Processing cost: US$22/tonne ore

· Pit slope angle: 52°

· Recovery: 90%

· Royalty: 7%

· Gold price: US$ 1,800/troy ounce.

The Mineral Resource was reported as that material within the RPEEE pit shells, and above a cut-off grade of 0.5 g/t Au. The Mineral Resource was reported as of 18 January 2021 (Table 1).

 

Table 1: Mineral Resource for the Mikei prospects reported at a cut-off of 0.5 g/t Au, as of 18 January 2021

Area

Indicated

Inferred

Total

Tonnage (Mt)

Grade(g/t Au)

Content (koz Au)

Tonnage (Mt)

Grade(g/t Au)

Content (koz Au)

Tonnage (Mt)

Grade(g/t Au)

Content (koz Au)

KKM

7.88

1.10

277.8

2.63

1.11

93.5

10.51

1.10

371.3

KW

0.61

1.10

21.6

0.32

1.42

14.7

0.93

1.21

36.3

NZ

1.04

3.96

132.0

0.32

3.17

32.2

1.35

3.78

164.1

GM

-

-

-

1.91

1.37

84.0

1.91

1.37

84.0

MK

0.28

5.48

49.0

0.15

3.83

18.2

0.43

4.91

67.1

Total

9.81

1.52

480.4

5.32

1.42

242.6

15.13

1.49

723.0

Note:

· Computational errors may exist due to rounding.

· Under JORC (2012)

· Red Rock owns 100% and therefore figures both gross and net to Red Rock

 

The technical information in this release has been reviewed by Mr Joseph Komu, a member of AusIMM and the Project Manager of the Project. He is a member of a recognised professional organisation and has sufficient relevant experience to qualify as a qualified person as defined in the Guidance Note for Mining, Oil and Gas Companies published by AIM .

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ("MAR"), and is disclosed in accordance with the Company's obligations under Article 17 of MAR.

For further information, please contact:

Andrew Bell 0207 747 9990 Chairman Red Rock Resources Plc

Roland Cornish/ Rosalind Hill Abrahams 0207 628 3396 NOMAD Beaumont Cornish Limited

Mark Treharne 0203 700 2500 Broker Pello Capital Limited

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDDKKBBOBKDKFD
Date   Source Headline
3rd Apr 20237:00 amRNSHalf-year Report
31st Mar 20234:27 pmRNSTotal Voting Rights
28th Mar 20237:00 amRNSEIA submitted for Zimbabwe lithium mining project
15th Mar 20232:36 pmRNSIssue of Equity
15th Mar 202312:15 pmRNSVictoria Goldfields, Australia - drilling update
8th Mar 20237:00 amRNSAsset Review and Current Developments
24th Feb 202310:05 amRNSIssue of Equity
16th Feb 202310:00 amRNSVictoria Goldfields - Beringa Update
10th Feb 20235:26 pmRNSResult of AGM
6th Feb 202311:00 amRNSPrice Monitoring Extension
11th Jan 20234:50 pmRNSNotice of AGM
9th Jan 202311:00 amRNSVictoria Goldfields Australia - Update
6th Jan 20237:00 amRNSBurkino Faso Exploration Update - Bilbale Project
29th Dec 202212:14 pmRNSFinal Results
19th Dec 202212:39 pmRNSDevelopment of Lithium Assets
16th Dec 202211:05 amRNSSecond Price Monitoring Extn
16th Dec 202211:00 amRNSPrice Monitoring Extension
15th Dec 20227:00 amRNSFund Raising
13th Dec 20227:00 amRNSDrilling begins at Historic Berringa Gold Mine
8th Dec 20222:16 pmRNSResult of Meeting
23rd Nov 20222:50 pmRNSNotice of GM
22nd Sep 20222:30 pmRNSAcquisition of Berringa Gold Mine Complete
21st Sep 20226:21 pmRNSPlacing, Appointment of Joint Broker and TVR
5th Sep 20227:00 amRNSUpdate on drilling at Bilbale
19th Aug 202210:41 amRNSSecond Tranche of CLNs and Warrants
15th Aug 20224:12 pmRNSResult of Meeting
10th Aug 202211:10 amRNSDirector/PDMR Shareholding
8th Aug 202210:17 amRNSDirector/PDMR Shareholding
5th Aug 20227:00 amRNSAsset Review and Current Developments
1st Aug 20222:00 pmRNSAssessment of Ajax Mine Potential
28th Jul 20227:00 amRNSNotice of GM
25th Jul 20227:00 amRNSIssue of convertible notes and warrants
6th Jul 20222:00 pmRNSVictoria Gold JV - Berringa Mine Acquisition
4th Jul 202212:48 pmRNSTotal Voting Rights
27th Jun 20223:30 pmRNSKimono Cobalt Project, DRC
13th Jun 20222:30 pmRNSDrill Results from Mt Bute, Victoria, Australia
8th Jun 20225:52 pmRNSIssue of Equity and Total Voting Rights
24th May 20227:00 amRNSVictoria Gold JV - Key Licence granted
6th May 20224:03 pmRNSIssue of Equity, Director/PDMR Holdings, TVR
6th May 20221:33 pmRNSLithium Update
29th Apr 20227:00 amRNSHalf-year Report
12th Apr 20222:00 pmRNSUpdate on Gold Exploration in Victoria
7th Apr 20224:41 pmRNSSecond Price Monitoring Extn
7th Apr 20224:36 pmRNSPrice Monitoring Extension
31st Mar 202211:31 amRNSResult of AGM
31st Mar 202210:27 amRNSLithium Subsidiary Established, Assets Acquired
24th Mar 20227:00 amRNSAsset Review and Interims Update
22nd Mar 20227:00 amRNSMikei Gold Project - Drill Programme Assay Results
14th Mar 20226:22 pmRNSDirector/PDMR Shareholding
7th Mar 20224:05 pmRNSNotice of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.