Blencowe Resources: Aspiring to become one of the largest graphite producers in the world. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRuspetro Regulatory News (RPO)

  • There is currently no data for RPO

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational update

1 Jun 2015 07:00

RNS Number : 7314O
RusPetro plc
01 June 2015
 



Ruspetro plc

1 June 2015

 

Ruspetro plc

("Ruspetro" or the "Group")

Operational update

 

 

Ruspetro plc (LSE: RPO, "the Group") announces that it has completed its development well campaign in the area of Pad 23b on the Pottymsko-Inginsky licence block. The 2015 drilling campaign comprised two multi-stage fractured horizontal wells 210 (previously labelled 216) and 212, plus one deviated well (218).

 

The Group's average monthly oil production over the last two months has increased from 3,262 bopd in April to 5,325 bopd in May as the new wells have progressively come on stream, with production reaching 6,100 bopd at the end of May. The Group continues to evaluate and optimize these three wells and will report on their stabilized performance in due course.

 

The horizontal well programme implemented over the last year has moved the Group up a very steep learning curve with regard to the future development of our assets. New technology implementation has been aggressive, aided by risk-based decision making and extensive scenario-planning.

 

With respect to completion technology, the standard Western Siberian well design concept involving a small number of relatively large hydraulic fractures ("fracs"), as employed in the first horizontal well on Pad 23b, has evolved into a fit-for-purpose design with a greater number of smaller fracs tuned to the geological setting. The technology underpinning this design has proved reliable and cost effective.

 

The Group has also delivered breakthrough reductions in well cost while drilling longer horizontal reservoir sections. This is a result of innovation in drilling and completion operations and design, implementation of alternative services contracting strategies, coupled with the beneficial depreciation of the Ruble exchange rate against the US Dollar. Well 210, our most recent multiple fractured horizontal well, completed with 10 fracs, was drilled and completed for a total cost of approximately $5.4 mln.

 

Critically for the future, the two most recent wells (210, 218) were targeted on the basis of the interpreted results of the integration of advanced 3D seismic methods with geological and production information. Whereas seismic data was largely overlooked in previous development execution, recent in-depth geophysical analysis has revealed conspicuous geological features, comprising potentially better quality reservoirs of fluvial origin. The new wells have confirmed that those reservoirs are capable of delivering higher and more sustainable production rates compared to typical Jurassic deposits drilled in the Krasnoleninsky arch.

 

The focus for the second half of 2015 will be on appraising the wider license area with a mixture of vertical and horizontal appraisal wells, designed to mature a portfolio of horizontal development wells to be drilled in 2016 and 2017. This development programme is expected to underpin the next significant step up in production.

 

The Group has so far drawn down $28.2 mln of the $94.7 mln available pursuant to the development and working capital facilities provided by Bank Otkritie Financial Corporation ("Otkritie") as required to meet our ongoing programme requirements. An additional tranche of up to $50 mln will be available to the Group from the Otkritie development facility, upon the Group achieving the facility's cumulative production covenant for first half of 2015, which the Group is on track to achieve. Having received $22.5 mln in pre-export financing from Glencore during May, the Group's cash position at the end of May 2015 was $17 mln.

 

 

Enquiries

Ruspetro plc

John Conlin, Chief Executive Officer +44 (0) 20 7318 1630

Alexander Betsky, Finance Director +44 (0) 20 7318 1630

Finlay Thomson, Investor Relations +44 (0) 79 7624 8471

FTI Consulting

Ben Brewerton, George Parker +44 (0) 20 3727 1000

 

About Ruspetro

Ruspetro plc is an independent oil and gas development and production company, with assets in the Western Siberia region of the Russian Federation. Our mission is to unlock the tight oil reservoirs in our asset base while building a leading regional independent E&P company in a safe and environmentally responsible manner for the long-term benefit of our shareholders.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLABMLTMBMJBTA
Date   Source Headline
2nd Jun 20162:43 pmRNSResult of AGM
2nd Jun 201612:06 pmRNSResult of AGM
20th May 20164:40 pmRNSSecond Price Monitoring Extn
20th May 20164:35 pmRNSPrice Monitoring Extension
11th May 201611:51 amRNSNotice of AGM
5th May 201611:25 amRNSResult of EGM
29th Apr 201610:12 amRNSAnnual Financial Report
22nd Apr 20164:40 pmRNSSecond Price Monitoring Extn
22nd Apr 20164:35 pmRNSPrice Monitoring Extension
14th Apr 20164:40 pmRNSSecond Price Monitoring Extn
14th Apr 20164:35 pmRNSPrice Monitoring Extension
14th Apr 20167:00 amRNSCirc re. Notice of General Meeting
14th Apr 20167:00 amRNSPreliminary Unaudited Results
16th Mar 20163:00 pmRNSHolding(s) in Company
16th Mar 20163:00 pmRNSDirector/PDMR Shareholding
17th Feb 20164:40 pmRNSSecond Price Monitoring Extn
17th Feb 20164:35 pmRNSPrice Monitoring Extension
9th Feb 20164:15 pmRNSHolding(s) in Company
9th Feb 20164:15 pmRNSHolding(s) in Company
3rd Feb 201611:44 amRNSHolding(s) in Company
2nd Feb 20167:00 amRNSHolding(s) in Company
31st Dec 201512:41 pmRNSSecond Price Monitoring Extn
31st Dec 201512:35 pmRNSPrice Monitoring Extension
30th Dec 20157:00 amRNSAgreement on New Covenants
9th Dec 20154:40 pmRNSSecond Price Monitoring Extn
9th Dec 20154:35 pmRNSPrice Monitoring Extension
8th Dec 20154:35 pmRNSPrice Monitoring Extension
7th Dec 20157:00 amRNSLicense Extension, SLB Results and Joint Broker
5th Nov 20152:04 pmRNSDirector/PDMR Shareholding
30th Sep 20154:40 pmRNSSecond Price Monitoring Extn
30th Sep 20154:35 pmRNSPrice Monitoring Extension
22nd Sep 20154:42 pmRNSSecond Price Monitoring Extn
22nd Sep 20154:37 pmRNSPrice Monitoring Extension
25th Aug 20154:35 pmRNSPrice Monitoring Extension
14th Aug 20157:00 amRNSResults for the six months to 30 June 2015
29th Jul 20154:40 pmRNSSecond Price Monitoring Extn
29th Jul 20154:35 pmRNSPrice Monitoring Extension
24th Jul 20154:35 pmRNSPrice Monitoring Extension
30th Jun 201510:01 amRNSDirector/PDMR Shareholding
30th Jun 20159:55 amRNSHolding(s) in Company
30th Jun 20159:54 amRNSHolding(s) in Company
19th Jun 20157:00 amRNSAnnouncement re major shareholder
11th Jun 20158:30 amRNSHolding(s) in Company
9th Jun 20153:31 pmRNSResult of AGM
9th Jun 20158:30 amRNSHolding(s) in Company
1st Jun 20157:00 amRNSOperational update
29th May 20154:35 pmRNSPrice Monitoring Extension
14th May 201510:44 amRNSNotice of AGM
8th May 20157:00 amRNSRenewal of Prepayment Facility with Glencore
5th May 201512:29 pmRNSDirector Declaration

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.