PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSN.L Regulatory News (ROSN)

  • There is currently no data for ROSN

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Q1 2016 operating results

16 May 2016 08:19

RNS Number : 3149Y
OJSC OC Rosneft
16 May 2016
 

Q1 2016 Operating Results

• Average daily hydrocarbon production of 5.21 mmboe, an increase both compared to Q1 2015, and for two consecutive quarters (+2.5% compared to Q3 2015)

• Production drilling grew by 52% with maintaining in-house OFS share above 50%

• Gas production grew by 6% to 16.72 bcm against Q1 2015

• Refining throughput optimization with refining depth up to 68.9%

• Euro-5 motor fuel production increased by 1.7 times against Q1 2015

Upstream

Hydrocarbon production continued to grow in Q1 2016. The level of production reached 5.21 mmboed (64.0 mmtoe), up by 0.2% against Q1 2015 and by 2.5% over the last two quarters.

In Q1 2016 the Company increased its production drilling by 52% against Q1 2015 to 2.08 million meters as established by the targets for the year. The share of in-house services in the total drilling footage consistently exceeds 50%. New wells put into operation grew by 59% compared with Q1 2015 (with horizontal wells share of 30%).

Liquid hydrocarbon production in Q1 2016 returned to the level of Q1 2015 and amounted to 50.2 mmt. The largest contribution to these positive production dynamics was provided by: RN-Uvatneftegaz (+13.2%), RN-Severnaya Neft (+17.6%), Sakhalin-1 project (+23.1%), Samaraneftegaz (+6.0%), as well as the Northern tip of the Chayvo field (+39.4%).

RN-Uvatneftegaz started commercial oil production at a new field of the Uvat project - the West Epasskoe (crude oil ABC1+C2 recoverable reserves exceed 17 mmt). The technological targets of the West Epasskoe field are included in the Eastern Hub in the south of the Tyumen region enabling to gain synergies through the use of existing fields' infrastructure.

In March 2016, the Company produced 120 mmt of oil at the Vankor field since its commissioning in 2009. The project of drainhole well completion is being successfully implemented at the field. Experience in operating such wells has shown a significant increase in their productivity.

In Q1 2016, Rosneft in cooperation with Statoil successfully completed a pilot project on the selection of efficient technologies PC1 reservoir development in the North-Komsomolsk field (Yamalo-Nenets Autonomous District, operator - RN-Purneftegas LLC). Total ABC1+C2 recoverable reserves of the North-Komsomolsk field amount to 203 mmt of oil and condensate and 197 bcm of gas. We were able to conduct pilot operation of 2 horizontal wells in different operating modes, and perform a number of well tests to update the geological and hydrodynamic field models. The average flow rate during the operation exceeded initial expectations and reached more than 75 tpd. Production potential is estimated at more than 100 tpd per well. Over 7,000 tons of oil was produced during the period of pilot operation.

In Q1 2016, the Company started production drilling at the Tagul field (ABC1+C2 recoverable reserves stand at 286 mmt of oil and condensate and 228 bcm of gas), which is part of the Vankor cluster. The drilling is directional with primarily horizontal completions. During 2016, it is planned to complete drilling about 9 wells and continue with field infrastructure development.

In Q1 2016, gas production amounted to 16.72 bcm, which is 1% above the level of Q4 2015 and 6% above Q1 2015. One of the key factors in gas production growth for the periods indicated is the startup of the 2nd stage of Rospan's Novo-Urengoi comprehensive gas and condensate processing plant in a comprehensive testing mode in Q4 2015. This facility will enable to increase the actual performance of the GPP to 11 million cubic meters of gas per day and 1,700 tons of condensate per day. Another significant factors of the gas production growth are the start of the third and fourth wells at the Northern tip of the Chayvo field and commissioning of the gas processing plant at RN-Purneftegaz's Barsukovsky field in December 2015.

The utilization of associated gas in Q1 2016 grew to 91% compared with 87% in Q1 2015. The improvement of APG utilization is an important element of environmental policy.

At the end of Q1 2016, about 2,000 linear km of 2D seismic and more than 3,000 sq. km of 3D seismic work was carried out onshore which exceeds the Q1 2015 results by 46% and 19% respectively. 5 exploration and appraisal wells tested with a success rate of 100%. 12 new deposits and 1 new field were discovered with ABC1+C2 reserves of more than 26 mmtoe.

The company started 3D seismic operations on the Vostochno-Pribrezhny license block in the Sea of Okhotsk, which will continue during 2016. The results of the research will help to clarify the oil and gas potential and the geological structure of the Vostochno-Pribrezhny area to prepare for further exploration.

Refining, Commerce and Logistics

In Q1 2016, the Company continued to optimize the performance of its refining capacity, as well as implement its modernization program. Refining throughput in the Russian Federation (19.5 mmt) decreased both in relation to Q4 2015 and as compared to Q1 2015 due to unfavorable market conditions and the negative impact of the tax maneuver. Refining throughput of foreign refineries (3.1 mmt) exceeded the levels of both Q4 2015 (+2%), and Q1 2015 (+17%).

As a result of optimization of the Company's refineries, the light product yield in Q1 2016 grew to 55.5%, and the conversion rate to 68.9%. In addition, the Company increased the production of Euro-5 gasoline and diesel fuel in Q1 2016 to 7.1 mmt, up by 11% against the previous quarter and more than 1.7 times the rate of Q1 2015.

The Company successfully continues to diversify supplies between the western and eastern destinations: deliveries were organized for an additional premium destination to China by rail. East-bound supplies in Q1 2016 grew by 12.6% compared to Q1 2015 and reached 10.7 mmt while the share of high-margin channels amounted to 50.2%.

As part of cooperation with its key partners, Rosneft extended the contract with Total in Q1 2016 for the supply of oil via the Druzhba pipeline to Germany for another 2 years, and the contract with Lotos to continue supplies to the Gdansk refinery (Poland) till the end of 2017.

The Company complies with all its obligations to supply petroleum products to the domestic market: in Q1 2016, sales of petroleum products grew by 2.9% compared to the same period in 2015 - up to 7.2 mmt.

The Company fully complies with its contract obligations to supply gas to its consumers. In Q1 2016, the Company's gas sales were 17.8 bcm, while in Q1 2015 - 15.9 bcm; the volume growth of 1.9 bcm of gas was due to supplies under new long-term contracts. The long-term gas balance providing Company customers with supplies in full was formed.

The Company uses a variety of opportunities to optimize its portfolio and balance uneven gas consumption, including purchase of gas generated by processing the Company's APG at third party gas processing plants, as well as buy and sell gas from third parties, including at the exchange. This practice allows optimizing the gas transportation routes and, consequently, increasing the efficiency of sales. The Company continues to participate in trading on the exchange as a seller of gas. 0.7 bcm of gas was sold in Q1 2016.

International operations

On 9 March 2016, Rosneft Vietnam B.V., a company of Rosneft Group, started drilling exploration well PLDD-1X in Vietnamese offshore Block 06.1. For the first time the Company is operating a drilling project, in International waters confirming the Rosneft competence and ability to implement technically complex drilling programs offshore.

Following the Memorandum signed in June 2015 during the St. Petersburg International Economic Forum, Rosneft and Venezuelan PDVSA signed a Term Sheet for the acquisition of a 23.33% stake in JV Petromonagas that produces extra-heavy oil in Venezuela. As a result of the deal, Rosneft will increase its stake to 40%. The members of the joint venture intend to improve its development by attracting advanced technologies and improving the efficiency of asset management.

Also, in February 2016 an agreement was signed with PDVSA on the Term Sheet for a new joint venture to take up a major project for the production, preparation and monetization of natural gas on the basis of the Patao and Mejillones fields and potentially Rio Caribe offshore Venezuela.

As part of a unique international consortium established on the basis of the Vankor project to improve the resource and production potential of the Vankor cluster, Rosneft, Oil India, Indian Oil and Bharat Petroresources signed the Heads of Agreement on the key terms for the acquisition by Indian group of companies of up to 23.9% share in Vankorneft. The document provides for the approval of legally binding purchase-and-sale transaction documents.

Rosneft also signed a Memorandum of Understanding on cooperation in the Vankor field with ONGC Videsh Limited for a potential increase of the Indian company's share to 26% in the project and to examine the potential of joint hydrocarbons trading, in particular, long-term oil supply contracts. Previously, the companies had made a Sale and Purchase Agreement for 15% in Vankorneft and a Shareholders' Agreement in respect of the management of the joint venture. The Sale and Purchase Agreement is expected to be closed shortly.

In order to advance the project to develop one of the largest fields in Eastern Siberia, the Srednebotuobinskoye oil and condensate field, and to build an infrastructure for the development of the region's reserves, Rosneft (represented by RN-Exploration and Production), Oil India, Indian Oil and Bharat Petroresources signed an Agreement for the purchase and sale of a 29.9% stake in Taas-Yuryakh Neftegasodobycha. The document provides for the Indian companies' consortium to enter into a joint venture established by Rosneft and BP on the basis of Taas-Yuryakh Neftegasodobycha. Rosneft will retain the majority stake in the JV. The parties plan to close the deal after obtaining the required regulatory and other approvals.

 

 

Key operational indicators for Q1 16:

 

Q1 16

Q4 15

Q1 15

Q/Q change

%

Y/Y change

%

Hydrocarbon production (k boe/day)

5,208

5,207

5,200

0.0%

0.2%

Liquids production (mln.t)

50.2

51.0

50.2

(1.6)%

0.0%

Gas production (bcm)

16.72

16.62

15.80

0.6%

5.8%

APG useful utilization level

90.7%

90.9%

87.4%

(0.2) p.p.

3.3 p.p.

Development drilling (km)*

2,084

2,021

1,370

3.1%

52.1%

2D seismic (km)*

1,958

10,823

1,339

82%

46.2%

3D seismic (sq.km)*

3,226

927

2,779

>100%

16.1%

Oil Refinery throughput (mmt)

22.61

23.59

24.34

(4.2)%

(7.1)%

Russian refinery throughput (mmt)

19.48

20.52

21.67

(5.1)%

(10.1)%

Refinery throughput outside Russia (mmt)

3.13

3.07

2.67

2.0%

17.2%

Product output in Russia (mmt)

19.01

20.08

21.03

(5.3)%

(9.6)%

Gasoline (mmt)

2.90

2.79

2.93

3.9%

(1.0)%

Naphta (mmt)

1.25

1.37

1.36

(8.8)%

(8.1)%

Diesel fuel (mmt)

6.04

6.32

6.99

(4.4)%

(13.6)%

Fuel oil (mmt)

5.59

6.35

7.05

(12.0)%

(20.7)%

Kerosene (mmt)

0.63

0.72

0.65

(12.5)%

(3.1)%

Petrochemicals (mmt)

0.16

0.27

0.20

(40.7)%

(20.0)%

Other (mmt)

2.44

2.26

1.85

8.0%

31.9%

Product output outside Russia (mmt)

3.27

3.15

2.60

3.8%

25.8%

*According to management data

 

Information Policy Division

Rosneft Oil Company

tel.: +7 (495) 411 54 20

fax: +7 (495) 411 54 21

May 16, 2016

 

These materials contain statements about future events and expectations that are forward-looking in nature. Any statement in these materials that is not a statement of historical fact is a forward-looking statement that involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements expressed or implied by such forward-looking statements to differ. We assume no obligations to update the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCAKADDOBKKAPD
Date   Source Headline
21st Jun 201312:14 pmRNSHoA with SODECO regarding sale and purchase of LNG
21st Jun 201312:12 pmRNSHoA with Marubeni for Sale and Purchase of LNG
21st Jun 201312:11 pmRNSRosneft and Eni Sign Completion Deed
21st Jun 201312:05 pmRNSAdvancement on Statoil Cooperation Agreement
21st Jun 201312:01 pmRNSAdvancement on ExxonMobil Strategic Cooperation
21st Jun 201311:54 amRNSCooperation Agreement with General Electric
21st Jun 201311:50 amRNS$2 bln Long-Term Loan from China Development Bank
21st Jun 201311:48 amRNSAgreement with CNPC on Crude Oil Supplies
21st Jun 20137:06 amRNSCrude Oil Supplies Contract with Trafigura
21st Jun 20137:00 amRNSContract for Crude Oil Deliveries to Czechia
21st Jun 20137:00 amRNSAGM Statement
7th May 20137:00 amRNSRosneft BoD Recommends Dividends at RUB 8.05
30th Apr 20136:00 pmRNSAnnual Financial Report
30th Apr 20132:02 pmRNS1st Quarter Results
15th Apr 20131:54 pmRNSRosneft Acquires Minority Stake in Saras S.p.A.
21st Mar 20131:13 pmRNSRosneft Consolidates 100% of TNK-BP
21st Mar 201312:49 pmRNSRosneft Finalises Acquisition of AAR 50% in TNK-BP
21st Mar 201312:45 pmRNSRosneft and BP Complete TNK-BP Purchase
5th Mar 20137:48 amRNSRosneft BOD Meeting Results
13th Feb 20133:40 pmRNSRosneft, ExxonMobil Expand Strategic Cooperation
13th Feb 201310:25 amRNSRosneft Signs Loan Agreements Worth $14.2 Bln
13th Feb 20139:57 amRNSRosneft BOD Meeting Results
1st Feb 201312:53 pmRNSLT supplies via Druzhba
1st Feb 201312:01 pmRNS2012 FY Results
22nd Jan 20137:00 amRNSAudit Of Reserves
24th Dec 201212:01 pmRNSRosneft Obtains Financing to Acquire 50% in TNK-BP
24th Dec 201211:47 amRNSHeads of Terms for Contracts with Glencore & Vitol
13th Dec 201212:34 pmRNSRosneft Board Approves Major Deals
12th Dec 20129:31 amRNSRosneft and AAR Sign Sale and Purchase Agreement
7th Dec 20127:00 amRNSRosneft Completes Debut Eurobond Issue
7th Dec 20127:00 amRNSRosneft and ExxonMobil Agreement For Tight Oil
3rd Dec 20123:38 pmRNSRosneft Held Extraordinary Meeting of Shareholders
22nd Nov 20124:16 pmRNSRosneft signs definitive agreements with BP
22nd Nov 20123:15 pmRNSRosneft Board Approves BP Deal
1st Nov 201210:15 amRNSRosneft and INTER RAO 25-Year Gas Supply Contract
1st Nov 20129:33 amRNS3rd Quarter Results
22nd Oct 20121:28 pmRNSRosneft Agrees Heads of Terms with AAR
22nd Oct 201212:08 pmRNSRosneft agrees to acquire 50% in TNK-BP from BP
18th Sep 20127:10 amRNSRosneft Holds Board of Directors Meeting
6th Sep 20129:13 amRNSRosneft and Transneft to Build ESPO Offshoot
30th Aug 201211:40 amRNSRN Statoil additional agreements
6th Aug 20128:25 amRNSRosneft and ITERA Close Deal to Create JV
1st Aug 20124:58 pmRNS1H 2012 IFRS Financial Results
24th Jul 20127:16 amRNSNotice of intention
23rd Jul 20127:30 amRNSAgreement with ENI to Finance Exploration Works
21st Jun 20123:30 pmRNSRosneft and VTB Bank sign strategic agreement
21st Jun 20123:28 pmRNSNew agreements between Rosneft and Eni
21st Jun 20123:23 pmRNSRosneft and Statoil advance strategic cooperation
21st Jun 20127:50 amRNSRosneft Held Regular Meeting of Shareholders
18th Jun 201210:13 amRNSRosneft and ExxonMobil Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.