Less Ads, More Data, More Tools Register for FREE

Pin to quick picksROSN.L Regulatory News (ROSN)

  • There is currently no data for ROSN

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

3Q and 9M operating results

12 Nov 2015 15:00

RNS Number : 5474F
OJSC OC Rosneft
12 November 2015
 



Production results for Q3 2015 and 9M 2015

• Daily HC production increased by 1.4% up to 5.14 mboed in 9M 2015

• Increase in drilling meterage by 32.6% in 9M 2015. Share of horizontal wells in total fund exceeded 30%

• Fourfold growth rate of 2D seismic resulted from active works in Arctic region

• Sustainable refinery throughput in 9M 2015 with increased level of light oil output up to 55.3% (compared with 54.7% in 2014)

• Increase in domestic delivery of gasoline by 3.6% in 9M 2015

• Growth of sales volumes of crude oil and petroleum products to the East direction by 15.3% up to 39.1 mmt in 9M 2015 in accordance with contractual obligations

• Acquisition of assets of LLC "Trican well services", the unit of hydraulic fracturing

Upstream

In Q3 2015 production of hydrocarbons reached 63.1 mmtoe (5.08 mboed). In 9M 2015 production of hydrocarbons reached 189.6 mmtoe (5.14 mboed). The level of production was ensured by accelerated drilling program, including increase in share of horizontal drilling with hydraulic fracturing, sidetracking, implementation of simultaneous-separate production and injection, measures of oil inflows stimulation.

Production drilling meterage increased by one third in 9M 2015 compared with 9M 2014 and over 1,300 new wells were put into use (+16%), that is a new historic record for the Company. The Company optimized rig time by 6% and number of new horizontal wells composed over 390 or 30% of total wells put into use in 9M 2015, which by 25% exceeds the performance of 9M 2014. The company continues accelerated implementation of more effective types of injection: number of completed horizontal wells with frac increased by 40% compared with 9M 2014 with accompanied growth in production. In line with drilling program, the Company accelerates rate of well stock reconstruction using side-tracking: in 9M 2015 this operation is performed for more than 700 wells or by 48% exceeds the performance of 9M 2014, with additional oil production nearly 1.5 mmt (+12% compared to 9M 2014).

The Company continues with the strategy of development its own drilling service: in Q3 2015 in-house rigs fleet increased by 3.7% and achieved 223 units and workover crews - 208 units. Share of production drilling performed only with internal resources exceeded 50%. The Company successfully integrates in its structure internal specialized unit of hydraulic fracturing on the basis of the new acquired assets of LLC "Trican well services".

As a result of successful wellwork program and optimization of well operations a number of assets achieved a steady growth and increased contribution to total production of the Company in 9M 2015 compared with 9M 2014: average daily production growth in JSC "Samaraneftegaz" was + 5%, in JSC "Verkhnechonskneftegaz" + 7.4%, in LLC "Uvatneftegaz" + 10.3%.

In Q3 2015 the Company started exploitation at Labaganskoe field in Nenets Autonomous district with increased production plan of up to 1 mmtoe in 2016.

In Q3 2015 the Company considerably increased completion rate of 2D seismic works due to works in Arctic region (over 9.6 thousand km in the Laptev, Kara, Chuckchee Sea), and also increased rates of 3D seismic works by 2.2% compared to Q2 2015.

In terms of the drilling program execution and creating a new hub of the Uvat project in Q3 2015 new fields at the South-Gavrikovskoe, West-Epasskoe fields and Malyka field (recoverable ABC1+C2 reserves amounts to 29.8 mmt of crude oil and condensate, 0.8 bcm of gas) were put into development drilling.

In Q3 2015 the Company completed testing of 12 on shore exploration wells. In just 9M 2015 the Company completed 31 on shore exploration wells with 90% success rate. The Company discovered 2 fields and 56 deposits with (ABC1+C2) reserves of over 21 mmtoe in 9M 2015. In Q3 2015 the Company completed a comprehensive engineering research at South-Russkoye license area in the Pechora sea ahead of schedule (recoverable reserves of the site amounts to 269.8 mmt of crude oil and condensate and 64.1 bcm of gas). As a result of the research all the required data for further exploration was obtained.

Based on performance in 9M 2015 production of gas reached 45.92 bcm, having increased by 12.3% compared to 9M 2014. The growth of gas production was mainly provided by commissioning of gas wells in Tarasovskoe field of Purneftegaz in H2 2014 and increased production at Vankor field, where pipeline Vankor - Khalmerpayutinskoe field was built in 2014. The level of utilization of accompanying petroleum gas ("APG") reached 86.8% in 9M 2015 compared to 78.6% in 9M 2014.

In September 2015 JSC "Rospan International" commissioned the oil preparation unit that will enable to produce crude oil and APG in the Valanginian deposit the pilot production in which is located within East-Urengoy license area. The recoverable reserves of the formation comprise 98 bcm of gas and 19 mmt of oil and condensate.

Downstream

In Q3 2015, Russian and foreign refineries of the Company have refined 25.21 mmt of crude oil that is 6.1% more than in Q2 2015. Slight decrease in refining (by 0.4%) in 9M 2015 was due to temporary cease of processing at Mozyr refinery under processing agreement in Q1 2015 accompanied by re-allocation of crude oil to higher marginal trading channels.

In 9M 2015 production share of Euro 4/5 at refineries in Russia amounted to 80% compared to 55.9% in 9M 2014. The Company increased its output share of light fuel up to 55.3% in 9M 2015. Resulting from complex technical restructuring in Q3 2015 Novokuibyshevsk and Kuibyshev refineries completely launched production of Euro-5 diesel fuel. In September 2015, within the extension of product line, the production of new type of marine fuels (RMG 380, RMG 500) was launched at Komsomolsk refinery which fully meets the requirements of international standards. The dispatches of RMG 380 have started in Russian Far East ports.

In terms of import substitution program in Q3 2015 the Company succeeded in usage of catalyst of steam reforming produced at Angarsk refinery and organic synthesis on hydrogen plant produced at Syzran refinery that enable the Company to meet needs in catalyst capacity entirely by in-house production.

The Company successfully extended product mix delivered to Asia markets resulted from effective supply via Vanino port of heavy fuel which production was launched at Komsomolsk and Angarsk refineries in Q3 2015.

In 9M 2015 sales volumes of crude oil and petroleum products increased by 2.0% compared to 9M 2014 up to 159.5 mmt. Sales volumes to east direction increased by 15.3% and amounted to 39.1 mmt compared to 9M 2014.

In Q3 2015 the Company increased the domestic sales volume of gasoline by 3.4% compared to Q2 2015. Growth in domestic sales volume of gasoline amounted to 3.6% in 9M 2015 compared with 9M 2014. Increase in sales through exchange trades amounted to 30%, that ensured regular excess in the planned level of exchange trades.

Due to the stable production and continuous shipment of petroleum products and produced necessary reserves of gasoline the Company managed to ensure stable passing the period of seasonal growth in prices of motor fuel, that allowed to prevent shortage and sharp growth in wholesale and retail prices in the period of high demand.

Gas sales volumes increased by 1.8% up to 13.51 bcm in Q3 2015 compared with Q2 2015. Growth of gas sales volumes by 5.6% in 9M 2015 compared with 9M 2014 was mostly due to commencement of supplies under new long-term contracts.

Volumes of exchange trades in natural gas comprised 56% share of the total volume of gas sales at the exchange for 9M 2015 and amounted to 2 bcm in this period.

In Q3 2015 within the cooperation with EGPC and EGAS companies the Company concluded petroleum products and LPG supply agreements which contributed to considerable progress in cooperation with Egypt and to strengthening Rosneft's positions as a supplier of petroleum products and LPG in North Africa markets.On August 31, 2015 Rosneft publishes consolidated IFRS financial results for Q2 2015.

 

Key production indicators for Q3 2015 and 9M 2015:

Q3

2015

Q2

2015

Change,

%

9M

2015

9M

2014

Change,

%

Hydrocarbon production (thboed)

5,081

5,149

(1,3)%

5,143

5,074

1.4%

Gas production (bcm)

14.83

15.29

(3.0)%

45.92

40.87

12.3%

APG utilization level

86.3%

86.7%

(0.4)p.p.

86.8%

78.6%

8.2 p.p.

Exploration drilling (thousand meters)*

1,875

1,669

12.3%

4 914

3,705

32.6%

2D seismic (km)*

9,729

745

>100%

11,813

2,702

>100%

Refinery throughput (mmt)

25.21

23.75

6.1%

73.31

73.59

(0.4)%

Crude oil processing at Rosneft's refineries in Russia (mmt)

21.96

20.55

6.9%

64.18

63.82

0.6%

Crude oil processing outside Russia (mmt)

3.25

3.20

1.6%

9.13

9.77

(6.6%)

Petroleum product output in Russia (mmt)

21.47

20.36

5.5%

62.84

61.66

1.9%

Gasoline (mmt)

2.90

2.64

9.8%

8.47

7.83

8.2%

Naphtha (mmt)

1.52

1.33

14.3%

4.21

4.24

(0.7%)

Diesel (mmt)

6.81

6.14

10.9%

19.94

19.90

0.2%

Fuel oil (mmt)

6.68

6.55

2.0%

20.27

20.65

(1.8%)

Jet fuel (mmt)

0.94

0.81

16.0%

2.40

2.60

(7.7%)

Petrochemicals (mmt)

0.19

0.29

(34.5%)

0.68

0.56

21.4%

Other (mmt)

2.43

2.60

(6.5%)

6.87

5.88

16.8%

Petroleum product output outside Russia (mmt)

3.40

3.29

3.3%

9.29

9.76

(4.8%)

Crude oil, petroleum products and petrochemicals sales (mmt)

53.30

53.40

(0.2)%

159.5

156.4

2.0%

Gas sales (bcm)

13.51

13.27

1.8%

42.71

40.46

5.6%

*according to management accounting

 

Rosneft Information Division

tel.: +7 (495) 411 54 20

fax: +7 (495) 411-54-21

November 12, 2015

 

These materials contain statements about future events and expectations that are forward-looking in nature. Any statement in these materials that is not a statement of historical fact is a forward-looking statement that involves known and unknown risks, uncertainties and other factors which may cause actual results, performance or achievements expressed or implied by such forward-looking statements to differ. We assume no obligations to update the forward-looking statements contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFESLDLFLIE
Date   Source Headline
14th May 20188:01 amRNSQ1 2018 Financial Results
14th May 20187:04 amRNSQ1 2018 Operating Results
1st May 20185:02 pmRNSAdditional Provisions To Rosneft-2022 Strategy
27th Apr 20186:00 pmRNSAnnual Financial Report 2017
25th Apr 20184:03 pmRNSBOD Recommends Dividends at Rub 6.65 per Share
19th Mar 20187:13 amRNSFinancial results for 4Q 2017 and 12M 2017
19th Mar 20187:10 amRNSOperating Results for Q4 and 12M 2017
9th Feb 20185:06 pmRNSIndependent Audit of Hydrocarbon Reserves
30th Jan 20182:02 pmRNSMoody's upgraded Rosneft's credit rating
27th Dec 20177:00 amRNSOut-of-court settlement with Sistema
19th Dec 20177:08 amRNSBoD approves 2018-2019 business plan
19th Dec 20177:08 amRNSBoD approves "ROSNEFT-2022" strategy
19th Dec 20177:08 amRNSBoD approves Samotlor field development program
20th Nov 20179:28 amRNSCrude oil supply contract with CEFC China
14th Nov 20177:02 amRNSQ3 2017 Financial Results
13th Nov 20177:03 amRNSOperating Results for Q3 and 9M 2017
18th Oct 20174:59 pmRNSCooperation agreement with Kurdistan
9th Oct 20178:18 amRNSAcquisition of a 30% Stake in the Zohr Gas Field
2nd Oct 20177:26 amRNSEGM Results
5th Sep 20177:49 amRNSRosneft BoD Approves Changes to Dividend Policy
21st Aug 20177:03 amRNSRosneft Closes Acquisition of 49% of Essar
4th Aug 20178:01 amRNSFinancial results for Q2 and 6M 2017
4th Aug 20177:02 amRNSOperating Results for Q2 and H1 2017
30th Jun 20173:45 pmRNSReport on Payments to Govts
30th Jun 20177:00 amRNSSale of 20% in Verhnechonskneftegaz to Beijing Gas
23rd Jun 20178:27 amRNSRosneft 2017 AGM Results
2nd Jun 20171:10 pmRNSRosneft and Iraqi Kurdistan Government Agreement
2nd Jun 20179:38 amRNSRosneft and TMK Sign Long-Term Supply Contracts
5th May 20178:00 amRNSFinancial results for 1Q 2017
3rd May 201710:45 amRNSOperating Results for Q1 2017
28th Apr 20175:25 pmRNSRosneft 2016 Annual Financial Report
24th Apr 20174:33 pmRNSBOD recommends dividend at RUB 5.98 per share
11th Apr 20175:54 pmRNSAcquisition of a 100% stake in Kondaneft project
22nd Feb 20177:03 amRNSFY 2016 Financial Results
15th Feb 20174:00 pmRNSIndependent Audit of Hydrocarbon Reserves
14th Feb 20174:00 pmRNSFY 2016 Operating Results
18th Jan 201710:30 amRNSDisposal of the remaining stake in Saras S.p.A.
9th Jan 20172:30 pmRNSRosneft Strengthens Cooperation with China
13th Dec 20167:00 amRNSRosneft to acquire a share in Zohr gas field
12th Dec 20167:00 amRNSGlencore and QIA partnership with Rosneft
12th Dec 20167:00 amRNSSuccessful Completion of Privatization
15th Nov 201611:36 amRNSAcquisition of Bashneft Ordinary Shares
11th Nov 20167:00 amRNSQ3 2016 Financial Results
10th Nov 20167:00 amRNSQ3 2016 Operating Results
7th Nov 20161:50 pmRNSSale of 20% in Verkhnechonskneftegaz
31st Oct 20167:09 amRNSMandatory Offer to Bashneft Minorities
28th Oct 20163:08 pmRNSRosneft sale of 11% stake in Vankor to ONGC
17th Oct 20167:33 amRNSRosneft Acquires 49% of Essar Oil Limited
13th Oct 20167:55 amRNSRosneft closed the deal on acquisition of Bashneft
12th Oct 20164:48 pmRNSAcquisition of the Government Stake in Bashneft

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.