Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRMM.L Regulatory News (RMM)

  • There is currently no data for RMM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

3rd Qtr Production Results & Exploration Update

2 Nov 2017 07:00

RNS Number : 3623V
Rambler Metals & Mining PLC
02 November 2017
 

2 November 2017

Rambler Releases Third Quarter Production Results & Exploration Update

Mill Currently Averaging 1,150 mtpd; Targeting 1,250 mtpd in November 2017

 

London, England - Newfoundland and Labrador, Canada - Rambler Metals and Mining plc (TSXV: RAB, AIM: RMM) ("Rambler" or "the Company"), a copper and gold producer, explorer, and developer today provides production results for the third quarter ended 30 September 2017 ('Q3/17').

Q3/17 Production Summary

· Copper feed grade for the quarter was 1.38% with a gold grade of 0.66 g/t. Total mill throughput for the period ending 30 September 2017 was 79,300 dry metric tonnes ('dmt'), a 9% decrease over the previous quarter; 14% increase over the same quarter F2016.

· During the period the copper milling facility averaged 920 metric tonnes per day ('mtpd') during operational hours. This is a decrease over the previous quarter as a result of a secondary crusher issue early in July. Primary crushing was available at a reduced rate during repairs however the monthly average was only 814 mtpd. The mill is currently averaging approximately 1,150 mtpd.

· Underground development into the Lower Footwall Zone continued at pace during the quarter and the Company is targeting production at 1,250 mtpd in November 2017. The mill itself has completed all known bottleneck modifications and now awaits a steady 1,250 mtpd ore feed from the mine to confirm that the modifications were successful. The Company has revised its annual production guidance to account for the delay in underground development.

· Average recoveries to concentrate for the quarter were: copper 95.38% and gold 61.68% with a concentrate grade of 28.9% and 9.0 g/t for copper and gold respectively.

o The mill produced 3,614 dmt of concentrate, a 17% decrease over Q2/17, containing saleable metal of 1,004 tonnes of copper and 930 ounces of gold. This represents a 10% and 1% decrease respectively over the previous quarter.

EXPLORATIoN UPDATE

· The second exploration surface hole, RM17-25b, has now been completed to a depth of 1,685 meters.

· RM17-25b has extended the LFZ zone an additional 200 meters with a third hole in progress aiming to add another 300 meters of plunge length.

· The goal of the surface exploration program is to add approximately 1 kilometer to the mineralized plunge length of the LFZ and MMS presently being mined up dip.

· Assays for the new hole are pending and will be released over the coming weeks.

 

Norman Williams, President and CEO, commented:

"While the quarter started off with unplanned secondary crusher repairs, by quarter end the operation was pushing over 1,100 mtpd. Our maximum throughput year to date has been 1,230 mtpd with more tonnes now being delivered to surface from additional Lower Footwall Zone headings. The operation is working towards maintaining 1,250 mtpd throughout November then a temporary step back to 1,150 mtpd to allow for commissioning of the new ventilation system for the mine.

"The mineralized intersections reported from the first exploration surface drill hole were encouraging and stepped out nearly 300 meters from the closest drill hole. We have now completed a second hole and have extended the LFZ an additional 200 meters with a third hole underway targeting another ~300 meters of plunge length. Continued drilling is proving to be successful in expanding the LFZ mineralization as we work towards our Phase III engineering studies."

 

Q3 2017 Production Summary

 

The table below summarizes the production results for second quarter ending 30 September 2017.

 

Table 1 - Quarter over Quarter Results Comparison 

(see Note 1 below)

PRODUCTION

Q2/17

Q3/17

Q3/16

Q3/17

Dry Tonnes Milled

86,895

79,300

-9%

69,426

79,300

14%

Copper Recovery

94.2

95.4

1%

96.0

95.4

-1%

Gold Recovery

56.5

61.7

9%

63.4

61.7

-3%

Copper Head Grade (%)

1.41

1.38

-2%

1.84

1.38

-25%

Gold Head Grade (g/t)

0.67

0.66

-1%

1.24

0.66

-46%

 

CONCENTRATE

 

Copper (%)

26.6

28.9

9%

27.2

28.9

6%

Gold (g/t)

7.7

9.0

17%

13.4

9.0

-33%

Dry Tonnes Produced

4,359

3,614

-17%

4,215

3,614

-14%

 

SALEABLE METAL

 

Copper Metal (tonnes)

1,112

1,004

-10%

1,101

1,004

-9%

Gold (ounces)

939

930

-1%

1,681

930

-45%

 

During the period the copper milling facility processed 79,300 mtpd of ore at an average of 930 metric tonnes per day ('mtpd'), during operational hours. All known bottleneck modifications have been made to the mill and it awaits sustained ore feed of 1,250 mtpd from the mine. Copper feed grade for the quarter was 1.38% with a gold grade of 0.66 g/t, both in line with guidance.

Recovery to concentrate for copper was 95.4% and gold 61.7% with a concentrate grade of 28.9% and 9.0 g/t for copper and gold respectively. The mill produced 3,614 dmt of copper concentrate with saleable metal of 1,004 tonnes of copper and 930 ounces of gold. The mill produced at a reduced rated for a portion of July due to secondary crusher repairs however is currently averaging 1,150 mtpd and has run at consecutive days above 1,200 mtpd.

With more LFZ stopes now in production ore being delivered from the mine is nearing its 1,250 mtpd target. The ventilation improvements at the mine will allow for faster cycling in the post pillar cut and fill areas and allow sustained 1,250 mtpd production from the mine.

The Company has revised its guidance forecast for the remainder of the fiscal year to better reflect the slippage in underground development.

 

Table 2 - Q3/17 and YTD Production Results with 2017 Revised Guidance

(See Note 1 below)

 

PRODUCTION

Q1

2017

Q2

2017

Q3

2017

YTD

2017

Revised

F2017 Guidance

Previous

F2017 Guidance

Dry Tonnes Milled

75,438

86,895

79,300

241,634

330,000 - 360,000

350,000 - 400,000

Copper Recovery (%)

96.6

94.2

95.4

95.3

94 - 96

94 - 96

Gold Recovery (%)

64.0

56.5

61.7

60.6

60 - 65

60 - 65

Copper Head Grade (%)

1.13

1.41

1.38

1.32

1.3 - 1.6

1.3 - 1.6

Gold Head Grade (g/t)

0.3

0.67

0.66

0.55

0.5 - 1.0

0.5 - 1.0

 

CONCENTRATE

 

Copper grade (%)

28.2

26.6

28.9

27.9

26 - 28

26 - 28

Gold grade (g/t)

5.2

7.7

9.0

7.3

4.0 - 8.0

4.0 - 8.0

Dry Tonnes Produced

2,930

4,359

3,614

10,903

14,000 - 16,000

16,000 - 18,000

 

SALEABLE METAL

 

Copper (tonnes)

794

1,112

1,004

2,910

3,800 - 4,200

4,200 - 4,900

Gold (ounces)

391

939

930

2,260

3,400 - 3,900

3,900 - 4,700

 

Larry Pilgrim, P.Geo., is the Qualified Person responsible for the technical content of this release and has reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and Mining Canada Limited. Tonnes referenced are dry metric tonnes unless otherwise indicated.

 

Note 1: Results reported are accurate and reflective as of the date of release. The Company performs regular auditing and reconciliation reviews on its mining and milling processes as well as stockpile inventories, following which past results may be adjusted to reflect any changes.

 

 

Neither TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

 

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

 

ABOUT RAMBLER METALS AND MINING

Rambler is a mining and development company that in November 2012 brought its first mine into commercial production. Rambler has a 100 per cent ownership in the Ming Copper-Gold Mine, a fully operational base and precious metals processing facility and year round bulk storage and shipping facility; all located on the Baie Verte peninsula, Newfoundland and Labrador, Canada.

Rambler's ongoing Phase II plans are to increase mine and mill production to 1,250 mtpd by the fall 2017. This initial expansion has been fully funded through CEII's investment. Rambler will also continue advancing Phase III engineering studies with a view to further increase production to 2,000 mtpd at the Ming Mine.

Along with the Ming Mine, Rambler also owns 100 per cent of the former producing Little Deer/ Whales Back copper mines and has strategic investment in the former producing Hammerdown gold mine.

Rambler is dual listed in London under AIM:RMM and in Canada under TSX-V:RAB.

For further information, please contact:

 

Norman Williams, CPA,CA

President and CEO

Rambler Metals & Mining Plc

Tel No: 709-800-1929

Fax No: 709-800-1921

Peter Mercer

Vice President, Corporate Secretary

Rambler Metals & Mining Plc

Tel No: +44 (0) 20 8652-2700

Fax No: +44 (0) 20 8652-2719

 

Nominated Advisor (NOMAD)

 

Investor Relations

David Porter

Cantor Fitzgerald Europe

Tel No: +44 (0) 20 7894 7000

Nicole Marchand Investor Relations

Tel No: 416- 428-3533

Nicole@nm-ir.com

 

 

Website: www.ramblermines.com 

 

Caution Regarding Forward Looking Statements:

Certain information included in this press release, including information relating to future financial or operating performance and other statements that express the expectations of management or estimates of future performance constitute "forward-looking statements". Such forward-looking statements include, without limitation, statements regarding copper, gold and silver forecasts, the financial strength of the Company, estimates regarding timing of future development and production and statements concerning possible expansion opportunities for the Company. Where the Company expresses or implies an expectation or belief as to future events or results, such expectation or belief are based on assumptions made in good faith and believed to have a reasonable basis. Such assumptions include, without limitation, the price of and anticipated costs of recovery of, copper concentrate, gold and silver, the presence of and continuity of such minerals at modeled grades and values, the capacities of various machinery and equipment, the availability of personnel, machinery and equipment at estimated prices, mineral recovery rates, and others. However, forward-looking statements are subject to risks, uncertainties and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements. Such risks include, but are not limited to, interpretation and implications of drilling and geophysical results; estimates regarding timing of future capital expenditures and costs towards profitable commercial operations. Other factors that could cause actual results, developments or events to differ materially from those anticipated include, among others, increases/decreases in production; volatility in metals prices and demand; currency fluctuations; cash operating margins; cash operating cost per pound sold; costs per ton of ore; variances in ore grade or recovery rates from those assumed in mining plans; reserves and/or resources; the ability to successfully integrate acquired assets; operational risks inherent in mining or development activities and legislative factors relating to prices, taxes, royalties, land use, title and permits, importing and exporting of minerals and environmental protection. Accordingly, undue reliance should not be placed on forward-looking statements and the forward-looking statements contained in this press release are expressly qualified in their entirety by this cautionary statement. The forward-looking statements contained herein are made as at the date hereof and the Company does not undertake any obligation to update publicly or revise any such forward-looking statements or any forward-looking statements contained in any other documents whether as a result of new information, future events or otherwise, except as required under applicable security law

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDMMMGMVZRGNZG
Date   Source Headline
31st Jul 20159:40 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARESi
20th Jul 20157:00 amRNSPrefeasibility Study
22nd Jun 20157:00 amRNSFinancial Results for the Third Quarter 2015
4th Jun 20157:00 amRNSExploration Update at Ming Mine Operation
21st May 20157:00 amRNSThird Quarter 2015 Production Results
5th May 20157:02 amRNSRambler Ships More High Grade Copper Concentrate
19th Mar 20157:00 amRNSSecond Quarter & Interim Financial Results
23rd Feb 20157:00 amRNSSecond Quarter 2015 Production Results
9th Feb 20157:00 amRNSProgress Update on the Lower Footwall Zone
30th Jan 20157:00 amRNSRambler Implements Revised Plan at the Ming Mine
29th Dec 20147:00 amRNSHolding(s) in Company
17th Dec 20147:00 amRNSFifth High Grade Copper Concentrate Shipment
9th Dec 20147:00 amRNSFirst Quarter 2015 Unaudited Financial Results
4th Dec 20143:18 pmRNSResult of AGM
2nd Dec 20147:00 amRNSResource and Technical Update and DMS Update
27th Nov 20147:00 amRNSFirst Quarter 2015 Production Results
26th Nov 20144:50 pmRNSUpcoming Events
17th Nov 20147:00 amRNSHammerdown Gold Mine Update
29th Oct 20147:00 amRNSProposed Change to Board of Directors
27th Oct 20147:00 amRNSFinancial Results Year Ended July 31 2014
23rd Sep 20147:00 amRNSFourth Copper Concentrate Shipment Delivered
9th Sep 201412:30 pmRNSRambler Provides Positive Update
21st Aug 20147:00 amRNSFourth Quarter and Year End Production Results
5th Aug 201412:00 pmRNSRambler Continues Its Investment in Marathon Gold
18th Jul 20149:49 amRNSHolding(s) in Company
3rd Jul 20144:30 pmRNSCopper Concentrate Shipment
19th Jun 20141:15 pmRNSQ3 Financial Results - Replacement
19th Jun 20141:11 pmRNSNotification of Major Interest in Shares
19th Jun 20147:00 amRNSFINANCIAL RESULTS FOR QUARTER ENDED 30 APRIL 2014
27th May 20147:00 amRNSMaritime Resources Corp. Private Placement
22nd May 20143:00 pmRNSLittle Deer Drilling Update
22nd May 20147:00 amRNSThird Quarter Operating Results
23rd Apr 20147:00 amRNSRambler Ships More High Grade Copper Concentrate
2nd Apr 201412:00 pmRNSRambler Invests Further in Marathon Gold
26th Mar 20148:03 amRNSHoldings in Company
24th Mar 201411:10 amRNSMarathon Continues to Succeed with Drilling
20th Mar 20147:00 amRNSFinancial Results Q2 and Interims ended 31 Jan2014
3rd Mar 20147:00 amRNSRambler Makes Final Payment to Sprott Facility
19th Feb 20147:05 amRNSBoard Appointment
19th Feb 20147:00 amRNSSecond Quarter 2014 Operating Results
6th Feb 20142:00 pmRNSRambler and Thundermin Commence Drilling
3rd Feb 20147:00 amRNSRambler Reduces Debt Facility
27th Jan 20147:00 amRNSUpdate of Reserve and Resource Estimate
8th Dec 20105:07 pmRNSExercise of Options
12th Nov 200810:53 amRNSGrant of Options
3rd Sep 200812:06 pmRNSHolding(s) in Company
15th Apr 20085:14 pmRNSHolding(s) in Company
21st Jan 20082:24 pmRNSAnnual Report and Accounts
7th Jan 20089:13 amRNSResult of AGM
11th Dec 20077:00 amRNSChange of Adviser

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.