The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRainbow Rare Earths Regulatory News (RBW)

Share Price Information for Rainbow Rare Earths (RBW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.50
Bid: 12.00
Ask: 13.00
Change: 0.05 (0.40%)
Spread: 1.00 (8.333%)
Open: 12.45
High: 12.75
Low: 12.45
Prev. Close: 12.45
RBW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Rare Earths Co-Development Project in South Africa

3 Nov 2020 07:00

RNS Number : 0179E
Rainbow Rare Earths Limited
03 November 2020
 

3 November 2020

Rainbow Rare Earths Limited

("Rainbow" or the "Company")

(LSE: RBW)

 

Rare Earths Co-Development Project in South Africa

Rainbow Rare Earths is pleased to announce the signing of a binding Agreement for Co-Development (the "Agreement") of the Phalaborwa Rare Earths Project (the "Project"), located in South Africa, with Bosveld Phosphates (Pty) Ltd ("Bosveld"). The Project comprises approximately 35 million tonnes of gypsum resulting from historic phosphate hard rock mining, containing rare earth elements ("REE") with an estimated average in situ grade of 0.6% Total Rare Earth Oxides ("TREO"), based on previous sampling campaigns.

 

Project highlights

· Rainbow and Bosveld intend to jointly develop and process rare earth elements from the gypsum contained in two stacks at the Project site (the "Gypsum Stacks").

· Initial grab sample assays from the c. 35 million tonnes Gypsum Stacks indicate 0.6% TREO, indicating c. 210,000 tonnes of contained TREOs, with Neodymium (Nd) and Praseodymium (Pr) (together "NdPr") anticipated to constitute c. 30% of the TREO basket.

· The unique nature of these Gypsum Stacks results from the historic concentration of REEs during Foskor's flotation process, followed by further upgrading in Sasol's PhosAcid Plant, leading to REE concentration in chemical (rather than mineral) form, which enables simpler onward processing.

· Sasol developed a comprehensive process flowsheet to extract the rare earths from the gypsum, which resulted in a successful pilot plant operation, producing c. 3 tonnes of mixed rare earth carbonate at c. 80% recoveries.

· Initial reports suggest low levels of radioactive elements, similar to those seen at Rainbow's Gakara Project, in Burundi.

· The Project is fully permitted, with an Environmental Impact Assessment completed.

· The re-processing of these Gypsum Stacks carries significant environmental benefits in that it will redeposit clean, benign gypsum, which then has the potential for further use in the building and fertiliser industries.

Key terms of the Agreement

· A total consideration of US$750,000, in a combination of cash and shares (priced based on the prevailing Rainbow share price on date of issue), shall be paid by Rainbow to Bosveld in three equal tranches over twelve months, with the first tranche being payable after completion of an initial due diligence process. The due diligence process is expected to last up to 35 days and a further announcement will be made on completion of the due diligence process.

· On completion of the pre-feasibility study ("PFS"), 70% of the Project will held by Rainbow and 30% by Bosveld, with a mechanism included to allow for Rainbow's Joint Venture ownership to vary from 60% to 85%, dependent on results of the PFS.

George Bennett, CEO, said: "This Joint Venture represents an important and exciting step in Rainbow's strategy to benefit from the expected growth in global demand for rare earth metals. The considerable amounts of historical test work carried out to date, together with positive initial assays and successful pilot plant operations, indicate that this opportunity, in conjunction with the Company's high-grade Gakara Project, will enable Rainbow to become a very significant producer of NdPr, to power the green revolution.

This Joint Venture positions Rainbow as the only REE producer with both country and project diversification."

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

For further information, please contact:

Company Rainbow Rare Earths Ltd

George Bennett +27 82 652 8526

Pete Gardner

 

Broker SP Angel Corporate Finance LLP

Ewan Leggat +44 (0) 20 3470 0470

Charlie Bouverat

 

Notes to Editors

Rainbow's strategy is to become a globally-significant producer of rare earth metals. Nd and Pr are vital components of the strongest permanent magnets used for the motors and turbines driving the green technology evolution. Analysts are predicting demand for magnet rare earth oxides will grow substantially over the coming years, driven by increasing adoption of green technology, pushing the overall market for Nd and Pr into deficit.

The Company's Gakara Project in Burundi, which produces one of the highest-grade concentrates in the world (typically 54% TREO) is currently the only African producer of rare earths through the ongoing trial mining operations. The Gakara basket is weighted heavily towards NdPr, which account for over 80% of the value of the Gakara concentrate.

Background on the Bosveld Project

Bosveld, a South African company, acquired the Sasol Phosphoric Acid Plant (the "PhosAcid Plant") in the Limpopo Province of South Africa in c. 2012, following a competition ruling on Sasol's monopoly in the market. A hard rock foskorite and pyroxenite deposit was mined over a period of c. 50 years by Foskor. The mined ore was concentrated in a flotation process and subsequently processed by Sasol, resulting in a total of c. 35 million tonnes of gypsum being deposited in two stacks.

Phosphate rock, the raw material of phosphoric acid production, is known as a secondary source of low-grade REE. Low in-situ concentrations of REEs were contained within the original Foskor orebody. Various stages in the processing upgraded these concentrations to what are expected to be economic levels, as a result of:

· initial concentration by flotation at the Foskor plant;

· further concentration during the sulphuric acid leaching process ("cracking") at Sasol's PhosAcid Plant to produce phosphoric acid, at which stage, the REEs were solubilised; and

· gypsum was formed during the phosphoric acid production, which was discharged to the stacks with the REEs.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
AGREAFFAEFPEFAA
Date   Source Headline
18th Apr 20243:50 pmRNSDirector/PDMR Shareholding
16th Apr 20247:00 amRNSPositive Initial Leaching and Mineralogy Results
28th Mar 20247:00 amRNSInterim Results
20th Mar 202411:37 amRNSPublication of Conference Presentation
26th Feb 20247:00 amRNSResource Update
5th Feb 20247:00 amRNSUpdate on Rare Earth Oxide Separation Progress
31st Jan 20247:00 amRNSPublication of Site Visit Presentation
18th Jan 20247:24 amRNSUS Congressional Delegation hosted at Phalaborwa
16th Jan 20247:00 amRNSAppointment of Stifel as Joint Broker
11th Jan 20247:00 amRNSRare Earth Oxide separation commences in the U.S.
6th Dec 20237:00 amRNSConditional shares issue & share options exercise
5th Dec 20237:00 amRNSDFC to fund proposed $50M TechMet investment
1st Dec 20237:00 amRNSRBW's partner K-Tech presents at Congress hearing
21st Nov 20237:00 amRNSResults of Annual General Meeting
8th Nov 20237:00 amRNSTechMet option to invest US$50m in Phalaborwa
31st Oct 20239:23 amRNSPublication of Annual Report and Notice of AGM
30th Oct 20237:00 amRNSPreliminary results for the year-end 30 June 2023
5th Oct 20237:00 amRNSAdmission of First Tranche of Placing Shares
4th Oct 202312:19 pmRNSPrivate Placement Update
4th Oct 20237:00 amRNSLOI for offtake of Phalaborwa gypsum by-product
27th Sep 20237:00 amRNSPrivate Placement Raises £4.5 Million
11th Sep 20237:00 amRNSSupply Agreement with UK-based Less Common Metals
7th Sep 20237:00 amRNSInitial Results from Uberaba confirm Rare Earths
5th Sep 20237:00 amRNSProduction of Mixed Rare Earth Sulphate
29th Aug 20237:00 amRNSDirector/PDMR Shareholding
8th Aug 20237:00 amRNSAJ Bell ‘Live’ Investor Evening 13 September 2023
18th Jul 20237:00 amRNSInvestor Presentation
17th Jul 20237:00 amRNSMOU signed with The Mosaic Company in Brazil
28th Jun 20237:00 amRNSAgreement to Allow 100% Ownership of Phalaborwa
12th Jun 20237:00 amRNSAppointment of Non-Executive Director
6th Jun 20234:03 pmRNSGrant of Share Options
6th Jun 20237:00 amRNSPhalaborwa Pilot Plant Commences Operations
26th May 20231:15 pmRNSDirector/PDMR Shareholding
24th May 20239:53 amRNSHolding(s) in Company
22nd May 20232:12 pmRNSGrant of Share Options
22nd May 20237:00 amRNSHolding(s) in Company
18th May 20235:00 pmRNSHolding(s) in Company
9th May 20237:00 amRNSPrivate placement raises £7.52 million
6th Apr 202312:00 pmRNSHolding(s) in Company
31st Mar 20231:52 pmRNSHolding(s) in Company
31st Mar 20237:00 amRNSInterim Results for six months to 31 December 2022
30th Mar 20237:00 amRNSHolding(s) in Company
20th Mar 20237:00 amRNSPhalaborwa Development and Resource Update
10th Feb 20237:25 amRNSDirector/PDMR Shareholding
10th Jan 20237:00 amRNSInvestor Presentation
15th Dec 20229:44 amRNSDirector/PDMR Shareholding - Replacement
15th Dec 20227:00 amRNSDirector/PDMR Shareholding
23rd Nov 20227:00 amRNSResults of Annual General Meeting
18th Nov 20229:30 amRNSShares/AJ Bell LIVE Investor Evening
10th Nov 20227:00 amRNSExercise of Share Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.