Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRainbow Rare Earths Regulatory News (RBW)

Share Price Information for Rainbow Rare Earths (RBW)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 12.50
Bid: 12.00
Ask: 13.00
Change: 0.00 (0.00%)
Spread: 1.00 (8.333%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 12.50
RBW Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Phase 1 Drilling Results Confirm High Grade REE

27 Jun 2018 07:00

RNS Number : 6693S
Rainbow Rare Earths Limited
27 June 2018
 

FOR IMMEDIATE RELEASE

27 June 2018

 

Rainbow Rare Earths Ltd ('Rainbow' or 'the Company') (LSE: RBW)

Extremely Positive Laboratory Results Confirm Multiple High-Grade Intersections

 

Rainbow, the Rare Earth Element ('REE') mining company, is pleased to announce an update from its maiden drilling campaign at its Gakara Project in Burundi ('Gakara'). Gakara is one of the highest grade rare earth element mining projects globally, with an estimated in situ vein grade of 47-67% Total Rare Earth Oxide ('TREO'), and the Company is targeting to ramp up production to an annualised rate of 5,000 tonnes per year (approximately 400 tonnes per month) by the end of calendar year 2018.

 

Highlights

 

· Laboratory results from the Kiyenzi drill cores have confirmed initial field analysis of the presence of multiple intersections of high grade REE

· Test highlights include 6.5m @ 7.1% TREO (including 44cm @ 35.3% TREO) and 1m @ 27.8% TREO (including 50cm at 30.34% TREO)

· Mineralisation at Kiyenzi is contained within a breccia pipe structure, in which REE minerals are interspersed with non REE-containing rocks. This implies lower average grades per tonne, but much wider mineralised zones and therefore greater tonnages, and simpler, faster mining

· As previously announced, Rainbow will now proceed with the Phase 2 exploration campaign with an aim of delivering a code-compliant resource by the end of 2018

 

Martin Eales, CEO of Rainbow, said: "We were anticipating some exciting mineralisation at Kiyenzi following our original field testing, and these laboratory results now confirm it. The thickness of the breccia deposit is likely to add many more tonnes to our code-compliant resource, targeted for this year, and should also be better suited to mechanised mining.

 

"Phase 2 drilling starts within the next month at Kiyenzi and we look forward to incorporating these results, as well as other areas within the Gakara project, into our targeted maiden resource later this year with a view of further ramping up our production of REE concentrate in the near-term to achieve our 6,000tpa run rate target by the end of 2019."

 

Phase 1 Drilling Campaign

 

Rainbow's Phase 1 drilling campaign commenced in the first quarter of this year and targeted a) the current production site at Gasagwe, b) the Kiyenzi prospect, where a high-priority gravity anomaly had been found, and c) a number of anomalies revealed by the airborne magnetic survey flown in Q4 2017. On 30 April 2018 Rainbow announced details of drilling at the Gasagwe mining site and the Kiyenzi target, as well as outlining plans for the completion of Phase 1 drilling and the laboratory testing of over 90 Kiyenzi drill core samples.

 

Kiyenzi laboratory results

 

As previously announced, five drill holes at Kiyenzi encountered REE mineralisation over multiple intersections. Mineralisation was initially visually identified as bastnaesite/monazite (the rare earth carrying minerals) and tested in the field with a hand held Niton XRF which indicated REE mineralisation. Over 90 core samples have now been laboratory tested to confirm the precise nature of these intersections and the results are extremely encouraging with selected results shown below.

 

Hole ID

From (m)

To (m)

Width (m)*

Grade - TREO%

 

GAK_DD_10

7.00

7.72

0.72

7.72% including 17cm at 10.98%

GAK_DD_10

19.00

19.12

0.12

15.23%

GAK_DD_11

26.50

33.00

6.50

7.10% including 44cm at 35.32%

GAK_DD_12

1.97

2.20

0.23

18.25%

GAK_DD_12

10.40

10.80

0.40

2.84%

GAK_DD_12

12.05

12.09

0.04

5.36%

GAK_DD_13

2.61

3.59

0.98

2.79%

GAK_DD_13

23.75

24.75

1.00

27.81% including 50cm at 30.34%

 

(All holes were drilled with a 50° dip)

 

Unlike the cleaner veins currently being mined at Gasagwe (typically averaging 3cm to 15cm), the intersections revealed in the Kiyenzi drill core are 'breccias' that vary in thickness and are much more heterogeneous. As anticipated in the 30 April 2018 announcement, the intersections contain lower global grades on a TREO basis per tonne of in situ rock than a cleaner narrow vein; however, it is likely that, considering the apparent sizeable widths of the intersections, this material will be more amenable to mechanised extraction at greater volumes than Gasagwe and other similar narrow vein areas within the Gakara Project.

 

Completion of Phase 1

 

Rainbow completed the Phase 1 campaign by drilling the remaining airborne magnetic anomalies that were identified in Q4 2017. Holes were drilled up to 150m on the five selected targets but no further evidence of REE mineralisation was discovered in these holes which may suggest an alternative location for the carbonatite source of the high grade REE veins or that it is at a depth not encountered by the drill holes.

 

Some highly magnetic units were intersected at various depths in the holes which are likely to have contributed to the magnetic anomalies suggested by the airborne survey.

 

Commencement of Phase 2 campaign

 

As confirmed in April 2018, Rainbow intends to start Phase 2 of the exploration campaign in July 2018, which will comprise approximately 750 metres of further core drilling at Kiyenzi. Should the mineralisation discovered to date prove sufficiently consistent, Rainbow intends to model and report a code-compliant resource by the end of 2018 which will additionally include further resource tonnes at Gasagwe and the next planned mining area. The Phase 2 drilling campaign will be complemented by further trenching and terracing at Kiyenzi, particularly of the shallow intersections, together with mineralogical and metallurgical testing of the breccia material.

 

**ENDS**

 

For further information, please contact:

 

Rainbow Rare Earths Ltd

Martin Eales

Tel: +44 (0) 20 3910 4550

St Brides Partners Ltd

Lottie Wadham

Susie Geliher

Tel: +44 (0) 20 7236 1177

Arden Partners plc

Paul Shackleton

Benjamin Cryer

Tel: +44 (0) 20 7614 5900

 

Notes to Editors:

 

Rainbow's focus is the Gakara Project in Burundi, one of the highest in situ vein grade (47%-67% Total Rare Earth Oxide) rare earths projects globally and the only African producer.

 

The Company began production of rare earth concentrates in Q4 2017 and is currently ramping up to a targeted run rate of 5,000tpa by the end of 2018 and 6,000tpa by the end of 2019. Rainbow has a ten-year distribution and offtake agreement with multinational thyssenkrupp Materials Trading secured for the sale of at least 5,000tpa of concentrate produced.

 

The Gakara basket is weighted heavily towards the magnet rare earths, including neodymium and praseodymium, which are driving demand and account for 70% of annual global REE sales due to their use in vital components in motors, generators, wind turbines, and electric vehicles.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLZMGZVVVGGRZM
Date   Source Headline
21st Jun 20192:31 pmRNSTurner Pope Investor Evening
10th Jun 20197:00 amRNSFull Conversion of Convertible Loan
6th Jun 20192:05 pmRNSSecond Price Monitoring Extn
6th Jun 20192:00 pmRNSPrice Monitoring Extension
3rd Jun 20199:05 amRNSSecond Price Monitoring Extn
3rd Jun 20199:00 amRNSPrice Monitoring Extension
31st May 20194:41 pmRNSSecond Price Monitoring Extn
31st May 20194:35 pmRNSPrice Monitoring Extension
31st May 201911:05 amRNSSecond Price Monitoring Extn
31st May 201911:00 amRNSPrice Monitoring Extension
24th May 201911:06 amRNSSecond Price Monitoring Extn
24th May 201911:00 amRNSPrice Monitoring Extension
22nd May 20194:41 pmRNSSecond Price Monitoring Extn
22nd May 20194:35 pmRNSPrice Monitoring Extension
22nd May 201911:05 amRNSAllotment of new shares
7th May 20197:00 amRNSQ3 Ops Update & Pella Loan
12th Mar 20198:00 amRNSShareholder Conference Call
12th Mar 20197:00 amRNSInterim Results for the 6 months ended 31 Dec 2018
1st Mar 20194:17 pmRNSAllotment of New Shares
1st Feb 20194:26 pmRNSDirector/PDMR Shareholding
31st Jan 20197:00 amRNSOp Update for the Three Months to 31 Dec 2018
28th Jan 20197:00 amRNSFunding Agreement for up to USD7.75 million
17th Dec 20187:00 amRNSJORC Resource
1st Nov 20185:28 pmRNSHolding(s) in Company
31st Oct 20181:27 pmRNSResults of AGM
30th Oct 20184:40 pmRNSSecond Price Monitoring Extn
30th Oct 20184:35 pmRNSPrice Monitoring Extension
30th Oct 201811:05 amRNSSecond Price Monitoring Extn
30th Oct 201811:00 amRNSPrice Monitoring Extension
30th Oct 20189:05 amRNSSecond Price Monitoring Extn
30th Oct 20189:00 amRNSPrice Monitoring Extension
30th Oct 20187:00 amRNSOperations Update for the Three Months to 30.09.18
10th Oct 20187:00 amRNSPublication of Annual Report and Notice of AGM
20th Sep 20182:24 pmRNSDirector/PDMR Shareholding
19th Sep 20187:00 amRNSAudited annual results
13th Sep 201811:05 amRNSReplacement: Shareholder and Analyst Call
12th Sep 20187:00 amRNSShareholder Call
9th Aug 201811:40 amRNSDirector/PDMR Shareholding
8th Aug 20183:11 pmRNSResult of Placing
8th Aug 201811:31 amRNSCooperation Agreement and Placing
24th Jul 20187:00 amRNSQ2 Operations Update
27th Jun 20187:00 amRNSPhase 1 Drilling Results Confirm High Grade REE
30th Apr 20187:00 amRNSPhase 1 Drilling Update
24th Apr 20187:00 amRNSGakara Q1 Production & Operations Update
12th Apr 201810:00 amRNSIssue of New Shares
10th Apr 201811:30 amRNSResponse to Press Comments
9th Apr 201811:17 amRNSHolding(s) in Company
15th Mar 201812:30 pmRNSProactive Investors One2One Forum
21st Feb 20187:00 amRNSUnaudited Interim Results
10th Jan 20187:00 amRNSCommencement of Drilling and Production Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.