Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPTR.L Regulatory News (PTR)

  • There is currently no data for PTR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operations Update

2 Jun 2016 07:00

RNS Number : 9667Z
Petroneft Resources PLC
02 June 2016
 

2 June 2016

 

PetroNeft Resources plc

("PetroNeft" or the "Group" or the "Company")

 

Operations Update

 

PetroNeft (AIM: PTR) an oil & gas exploration and production company, operating in the Tomsk Oblast, Russian Federation, and 50% owner and operator of Licences 61 and 67, is pleased to provide an update on operations at Licence 61.

 

Highlights

 

Arbuzovskoye Well A-214 Horizontal Production

· Completed drilling 1,000 m horizontal section with bottom hole at 4,008 m MD.

· Evaluation of pipe conveyed logs indicate 931 m net pay.

· Current rate of production is 800 bopd with less than 5% water.

 

Arbuzovskoye Well A-213 Vertical Production

· Two oil zones with 6.9 m net pay. Oil tested in J1-2 interval for the first time at Arbuzovskoye.

· Lower J1-2 zone with 2.9 m net pay currently producing a stable rate of 130 bopd.

· Upper J1-1 zone with 4.0 m net pay expected to come on production by the end of June.

 

Sibkrayevskoye Well S-374 Planned Vertical Delineation

· Pad constructed and all materials in place.

· Rig construction is underway with drilling commencement scheduled in July.

 

Production

· Current gross production from Licence 61 is about 3,000 bopd.

· This is up sharply due to very encouraging results on the A-214 and A-213 wells recently drilled at Arbuzovskoye field.

 

Arbuzovskoye Development

The A-214 well at Arbuzovskoye was spudded on 22 April 2016. It has been successfully completed with a horizontal segment of about 1,000 m in the Upper Jurassic J1-1 and J1-2 intervals at a depth of approximately -2,457 to -2,467 m TVDSS. Based on log data it is estimated that 931 m of the horizontal section is effective net pay. This compares to 663 m of net pay in T-503 which was the best horizontal well at Tungolskoye. The well was brought online on 22 May and the current flow rate is around 800 bopd. The well has cleaned up and is producing less than 5% water. The pressure in the well has been stable at around 175 atm, which indicates additional production capacity, however we intend to continue in this mode for a period to monitor its performance.

The Arbuzovskoye A-213 well was spudded on 1 April 2016. It was drilled as a vertical well from Pad 2 in the southern part of the field. The log and core data indicate that the well has 4.0 m of net oil pay in the primary Upper Jurassic J1-1 interval at a depth of -2,460 m TVDSS and another 2.9 m of net pay in the J1-2 interval starting at a depth of -2,466 m TVDSS. The well was initially perforated in just the J1-2 interval and production has now stabilised at about 130 bopd for the past two weeks. The J1-1 interval in the A-213 well will be perforated in the coming weeks and should add additional production from this well by the end of June.

 

In follow-up to the successful J1-2 oil production, we intend to re-evaluate all of the wells at Arbuzovskoye based on the A-213 result. As this is the first production from the J1-2 interval at Arbuzovskoye, we will need to quantify the additional reserves in the new oil pool and register them with the Russian State Reserve Committee.

 

The second horizontal well at Arbuzovskoye, A-215, is currently being drilled and is expected to be completed in about one month.

 

Sibkrayevskoye Development

Preparations are underway to drill the S-374 delineation well this summer. The pad has been constructed and all of the materials are in place. The drilling rig is currently being assembled with drilling commencement scheduled in July. This is a delineation well on the southern portion of the field designed to further de-risk the development and move P3 to P2 reserves. All of the necessary studies and approvals are being completed in order to commence development of Sibkrayevskoye in Q1 2017.

 

Production

Current gross production from Licence 61 is about 3,000 bopd. This is up sharply due to the good results of the initial two wells at Arbuzovskoye, despite the high decline rate at Tungolskoye and the shut-in of the S-373 well for the summer months following the end of the winter road season. The excellent properties and the thickness of the reservoir at Arbuzovskoye mean that although some decline is likely, we do not expect this to be of the magnitude previously experienced at Tungolskoye.

Dennis Francis, Chief Executive Officer of PetroNeft Resources plc, commented:

"This last month has been an extremely exciting time for the Company with two very good well results at South Arbuzovskoye boosting production and revenues. We have produced oil for the first time from the J1-2 interval in the A-213 well which will increase the oil reserves and flow rates at South Arbuzovskoye. In addition, our first horizontal well (A-214) has an initial flow rate of over 800 bopd which is the best flow rate thus far in the licence area. We will need to monitor the well carefully over the coming months to gauge the decline but the initial results are very encouraging."

 

For further information, contact:

Dennis Francis, CEO, PetroNeft Resources plc

+1 713 988 2500

Paul Dowling, CFO, PetroNeft Resources plc

+353 1 443 3720

John Frain/Brian Garrahy, Davy (NOMAD and Joint Broker)

+353 1 679 6363

Henry Fitzgerald-O'Connor, Canaccord Genuity Limited (Joint Broker)

+44 207 523 8000

Martin Jackson/Shabnam Bashir, Citigate Dewe Rogerson

+44 207 638 9571

Joe Heron / Douglas Keatinge, Murray Consultants

+353 1 498 0300

 

 

 

The information contained in this announcement has been reviewed and verified by Mr. Dennis Francis, Director and Chief Executive Officer of PetroNeft, for the purposes of the Guidance Note for Mining and Oil & Gas Companies issued by the London Stock Exchange in June 2009. Mr. Francis holds a B.S. Degree in Geophysical Engineering and a M.S. Degree in Geology from the Colorado School of Mines. He has also graduated from the Harvard University Program for Management Development. He is a member of the American Association of Petroleum Geologists and the Society of Exploration Geophysicists. He has over 40 years' experience in oil and gas exploration and development.

 

Glossary

2P reserves

Proved and probable reserves as defined by the standards of the Society of Petroleum Engineers

atm

Atmospheres of pressure, metric pressure unit.

bopd

Barrels of oil per day

 

m

metres

MD

Measured depth

P2 reserves

Probable reserves as defined by the standards of the Society of Petroleum Engineers

P3 reserves

Possible reserves as defined by the standards of the Society of Petroleum Engineers

TVDSS

True vertical depth subsea

 

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDDGGDLIGGBGLB
Date   Source Headline
10th Nov 20177:00 amRNSProduction Update
24th Oct 20177:00 amRNSOperations Update
10th Oct 201710:30 amRNSHolding(s) in Company
29th Sep 20177:00 amRNSHalf-year Report
15th Sep 20172:16 pmRNSResult of AGM
5th Sep 20177:00 amRNSOperations Update
28th Jul 20177:00 amRNSQuarterly Production Update
20th Jul 20177:00 amRNSOperations Update
30th Jun 20177:00 amRNSFinal Results
28th Apr 20177:00 amRNSQuarterly Production Update
31st Mar 20177:00 amRNS2017 Work Programme
14th Feb 20173:51 pmRNSHolding(s) in Company
31st Jan 20177:00 amRNSQuarterly Production Update
12th Oct 20167:00 amRNSQuarterly Production Update
28th Sep 20167:00 amRNS2016 Interim Results
16th Sep 20162:07 pmRNSResult of AGM
31st Aug 20167:00 amRNSDrilling and Operations Update
21st Jul 20167:00 amRNSOperations Update
5th Jul 20167:00 amRNSOperations Update
30th Jun 201612:00 pmRNSAnnual Report & Annual General Meeting
23rd Jun 20167:00 amRNS2015 Final Results
2nd Jun 20167:00 amRNSOperations Update
25th May 201612:19 pmRNSWithdrawal of General Invest EGM Requisition
26th Apr 20169:05 amRNSDirectors Declaration
25th Apr 20167:54 amRNSAgreement with Natlata
18th Apr 20162:00 pmRNSAdjournment of EGM
18th Apr 20168:26 amRNSRestriction Notice Update
6th Apr 20167:00 amRNSRestriction Notice Update
5th Apr 20162:37 pmRNSISS recommends vote AGAINST Natlata Resolutions
5th Apr 20168:05 amRNSRestriction Notices
31st Mar 201611:17 amRNSBoard Changes are vital for future of PetroNeft
23rd Mar 20167:00 amRNSExecution of Oil India Loan
21st Mar 201611:46 amRNSPetroneft offers no solutions except Poison Pill
21st Mar 20167:01 amRNS2016/2017 Work programme
21st Mar 20167:00 amRNSEGM Requisition and Publication of Circular
10th Mar 20164:55 pmRNSUpdate on Natlata EGM Requisition
2nd Mar 20161:55 pmRNSHolding(s) in Company
19th Feb 20165:03 pmRNSHolding(s) in Company
18th Feb 20163:16 pmRNSEGM Proposal
26th Jan 20162:30 pmRNSHolding(s) in Company
7th Jan 20167:00 amRNSDirector Shareholdings
31st Dec 20159:12 amRNSDirector Sharedealings
14th Dec 20157:00 amRNSOperational Update
29th Sep 20157:00 amRNSHalf Yearly Report
18th Sep 20153:10 pmRNSAnnual General Meeting
18th Sep 20151:49 pmRNSRetirement of Director
11th Sep 20154:33 pmRNSHolding(s) in Company
10th Sep 20157:00 amRNSOperations Update
12th Aug 20157:00 amRNSOperational Update
22nd Jul 20157:00 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.