If you would like to ask our webinar guest speakers from WS Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund a question please submit them here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPrimorus Inv. Regulatory News (PRIM)

Share Price Information for Primorus Inv. (PRIM)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 3.75
Bid: 3.50
Ask: 4.00
Change: 0.00 (0.00%)
Spread: 0.50 (14.286%)
Open: 3.75
High: 3.75
Low: 3.75
Prev. Close: 3.75
PRIM Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Horse Hill Update

7 Feb 2017 07:00

RNS Number : 1667W
Primorus Investments PLC
07 February 2017
 

Primorus Investments plc

 

("Primorus" or the "Company")

 

Upgrade to Portland Oil Resources, Horse Hill Oil Discovery, PEDL137, Weald Basin, UK

 

Highlights

 

· Xodus calculate Portland sandstone P50 Oil in Place ("OIP") of 32 million barrels ("MMbbl"), a 53% increase from the 21 MMbbl previously reported prior to successful 2016 flow testing

 

· Gross recoverable Portland 2C Contingent Resources 1.5 MMbbl

 

 

· Base Case Portland initial oil-rate estimated at 350 barrels of oil per day ("bopd") per well

 

• Ultimate recovery could be increased by a further 8-14% of OIP via early implementation of a water re-injection scheme. If successful, this could represent a 114%-440% addition to 2C recoverable resources, equating to an additional 1.7-6.6 MMbbl gross recoverable, or 0.5-2.1 MMbbl net to the Company

 

· Work plans now aimed towards Portland long-term production by end 2018

 

 

 

Primorus Investments plc (AIM: PRIM) announces that a new Report by Xodus Group Ltd ("Xodus") calculates the Horse Hill Portland sandstone conventional oil accumulation to contain an OIP of 32 MMbbl, an increase of 53% from the previously reported 21 MMbbl of May 2015. The upgrade results from the incorporation of Nutech's revised petrophysics, as reported in July 2016. As previously stated by the Company, OIP should not be misconstrued as recoverable Contingent Resources or reserves, which are detailed below.

Primorus holds a 10% shareholding in HHDL, which in turn owns 65% of PEDL137 and PEDL246. Primorus' direct attributable interest in these Licences is therefore 6.5%.

In March 2016 HHDL reported the final Horse Hill-1 ("HH-1") Portland test flowed at a stable dry oil rate of 323 bopd, producing light, sweet, 35 API gravity crude. The Portland was produced at the rod-pump's maximum achievable rate and thus flow was constrained by the pump's mechanical capacity. The test data analyses show no clear indication of depletion.

As a result of further analysis of the Portland flow test data, plus a review of similar producing fields, Xodus now assess the gross recoverable Portland 2C Contingent resources at 1.5 MMbbl. Calculated OIP and resources reflect oil contained in the entire Portland structure, as penetrated by the HH-1 and Collendean Farm -1 wells.

The Contingent Resource volumes given are those estimated to be attributable to primary recovery from the Portland reservoir. Results utilise a base case of three wells, draining both the Horse Hill and Collendean Farm fault blocks, each well with an initial production rate of 350 bopd.

The report also details that, for a shallow but permeable reservoir such as the Portland, should a water re-injection scheme be undertaken to provide pressure support in the field's early productive life, it is reasonable to expect a material increment in overall oil recovery. The successful implementation of such a scheme is estimated to lead to the recovery of an additional 8-14% of OIP, equivalent to a further 1.7-6.6 MMbbl of gross recoverable oil.

A summary of the Report's results is shown in tables 1 and 2 below.

As previously reported in October 2016, HHDL submitted a planning application to Surrey County Council for an extensive HH-1 appraisal programme, including long-term production testing and a new deviated well, HH-2, designed to access the Portland in both the HH-1 and Collendean Farm-1 proven oil-bearing fault blocks.

Table 1, Portland Sandstone, gross discovered OIP MMbbl:

Horse Hill Discovery

Low (P90)

Best (P50)

High (P10)

Mean

Portland OIP MMbbl

21.5

32.2

47.4

33.5

 

Table 2, Portland Sandstone, gross and net to Primorus Contingent Resources mbbls:

Horse Hill Portland Sandstone

Gross Field - 100%

Net to Primorus - 6.5%

Resource Category

1C

2C

3C

1C

2C

3C

Recoverable Oil mbbls

(primary recovery only) ¹

592

1,498

3,629

38.5

97.4

235.9

 

¹ Xodus Report states recovery could likely be improved by a further 8-14% of OIP via an early water re-injection scheme

 

HH-1 Oil Discovery, Location and Company Interest

The HH-1 oil discovery well is located within onshore exploration Licence PEDL137, on the northern side of the Weald Basin near Gatwick Airport. HHDL owns a 65% interest in PEDL137 (as well as in PEDL246) and is the licence's operator.

 

Qualified Person's Statement:

 

Stephen Sanderson, who has over 35 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation

596/2014.

 

The directors of Primorus accept responsibility for this announcement.

 

For further information please contact:

Primorus Investments plc:

+44 (0) 20 7440 0640

Alastair Clayton

 

Nominated Adviser/NEX Exchange Corporate Adviser:

+44 (0) 20 7213 0880

Cairn Financial Advisers LLP

James Caithie / Sandy Jamieson

 

Optiva Securities Limited (Broker)

+44 (0)20 3137 1902

Christian Dennis / Jeremy King

 

Glossary:

1C

denotes the low estimate scenario of Contingent Resources

2C

denotes the mid or best estimate scenario of Contingent Resources

3C

denotes the high estimate scenario of Contingent Resources

Contingent Resources

Contingent Resources are those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations, but the applied project(s) are not yet considered mature enough for commercial development due to one or more contingencies. Contingent Resources are further categorised in accordance with the level of certainty associated with the estimates and may be sub-classified based on project maturity and/or characterised by their economic status.

degree API

a measure of the density of crude oil, as defined by the American Petroleum Institute

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

flow test

a flow test or well test involves testing a well by flowing hydrocarbons to surface, typically through a test separator. Key measured parameters are oil and gas flow rates, downhole pressure and surface pressure. The overall objective is to identify the well's capacity to produce hydrocarbons at a commercial flow rate

limestone

a sedimentary rock predominantly composed of calcite (a crystalline mineral form of calcium carbonate) of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

mean

or expected value, is the probability-weighted average of all possible values and is a measure of the central tendency either of a probability distribution or of the random variable characterised by that distribution

oil in place

oil in place or oil in the ground is the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

P10 (high estimate)

a 10% probability that a stated volume will be equalled or exceeded

P50 (best estimate)

a 50% probability that a stated volume will be equalled or exceeded

P90 (low estimate)

a 90% probability that a stated volume will be equalled or exceeded

petrophysics

the study of physical and chemical rock properties and their interactions with fluids utilising electric logs, physical rock and fluid measurements

primary recovery

The first stage of hydrocarbon production, in which natural reservoir energy, such as gas drive, water drive or gravity drainage, displaces hydrocarbons from the reservoir, into the wellbore and up to surface. Initially, the reservoir pressure is considerably higher than the bottomhole pressure inside the wellbore. This high natural differential pressure drives hydrocarbons toward the well and up to surface. However, as the reservoir pressure declines because of production, so does the differential pressure. To reduce the bottomhole pressure or increase the differential pressure to increase hydrocarbon production, it is necessary to implement an artificial lift system, such as a rod pump, an electrical submersible pump or a gas-lift installation. Production using artificial lift is considered primary recovery. Primary recovery is also called primary production

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz grains

secondary recovery

a second stage of hydrocarbon production during which a fluid such as water or gas is injected or re-injected into the reservoir through injection wells located in rock that has fluid communication with production wells. The purpose of secondary recovery is to maintain reservoir pressure and to displace hydrocarbons toward the wellbore. The most common secondary recovery techniques are gas injection and water flooding. Normally, gas is injected into the gas cap and water is injected into the production zone to sweep oil from the reservoir

water re-injection or water flood

a common form of secondary oil recovery in which water is injected or re-injected into the reservoir formation to maintain reservoir pressure and to displace oil towards producing wells

 

About Xodus

 

Xodus Group Ltd. are an oil and gas focussed energy consultancy with over 500 employees providing integrated subsurface and surface solutions to a global client base. Further information can be found on Xodus' website: www.xodusgroup.com

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGMGGZRVKGNZM
Date   Source Headline
15th Apr 20247:00 amRNSInvestee Company Update – Engage Technology
25th Mar 20247:00 amRNSHolding(s) in Company
25th Mar 20247:00 amRNSHolding(s) in Company
19th Mar 20242:45 pmRNSFurther re Dividend Declaration
11th Mar 20244:51 pmRNSDividend Declaration
8th Mar 202411:49 amRNSFurther Investment in Fresho Pty Ltd
27th Feb 20247:00 amRNSHolding(s) in Company
22nd Feb 20247:00 amRNSInvestee Company Update – Payapps Limited
2nd Feb 20243:26 pmRNSHolding(s) in Company
26th Jan 20247:00 amRNSInvestee Company Update – Payapps Limited
11th Oct 20239:59 amRNSDirector/PDMR Shareholding
28th Sep 20235:27 pmRNSDirector/PDMR Shareholding
19th Sep 20234:50 pmRNSHolding(s) in Company
15th Sep 20237:41 amRNSFurther re Investment in Interpac & Bushveld CLN
18th Aug 20233:12 pmRNSHalf-year Report
15th Aug 202312:06 pmRNSResult of AGM
2nd Aug 202310:25 amRNSAlteration Earth - Investment Update
20th Jul 20237:00 amRNSNotice of AGM
14th Jul 20234:00 pmRNSBushveld Convertible Loan Note Update
20th Jun 20237:00 amRNSConsent to Electronic Communication
16th Jun 20233:18 pmRNSFinal Results
16th Mar 20232:50 pmRNSDirector/PDMR Shareholding
19th Jan 20233:25 pmRNSHolding(s) in Company
19th Jan 20233:23 pmRNSDirector/PDMR Shareholding
8th Dec 20227:01 amRNSHolding(s) in Company
8th Dec 20227:00 amRNSDirector/PDMR Shareholding
2nd Dec 20227:00 amRNSDirector/PDMR Shareholding
29th Nov 202211:05 amRNSSecond Price Monitoring Extn
29th Nov 202211:00 amRNSPrice Monitoring Extension
13th Sep 20223:50 pmRNSInvestment in Interpac Ltd
2nd Sep 20222:00 pmRNSHalf-year Report
1st Jul 20228:23 amRNSInvestment Update
30th Jun 202210:43 amRNSResult of AGM
10th Jun 20223:00 pmRNSFinal Results
6th Jun 202211:39 amRNSUpdate on Alteration Earth PLC Investment
31st May 20223:58 pmRNSNotice of AGM
4th May 202212:33 pmRNSUpdate on Alteration Earth PLC Investment
5th Apr 20227:00 amRNSUpdate on Alteration Earth PLC Investment
30th Mar 20228:12 amRNSDirector/PDMR Shareholding
29th Mar 20227:00 amRNSFurther re Investment in Mustang
17th Mar 20224:12 pmRNSFurther Investment in Rambler Metals & Mining PLC
16th Mar 20221:05 pmRNSCancellation of Share Options
8th Mar 202210:48 amRNSUpdate on Alteration Earth PLC Investment
28th Feb 20224:45 pmRNSFurther re Investment in Mustang
16th Feb 20227:00 amRNSGeneral Update & Clean Power Hydrogen Investment
3rd Feb 20227:00 amRNSInvestment in Rambler Metals & Mining PLC
31st Jan 202210:54 amRNSAlteration Earth Update
19th Jan 20228:01 amRNSFurther re Investment in Mustang
24th Dec 202110:11 amRNSAlteration Earth update
21st Dec 20217:00 amRNSUpdate on Mustang Energy Investment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.