RHA Tungsten Project Update

25 Nov 2014 07:00

RNS Number : 8462X
Premier African Minerals Limited
25 November 2014
Β 

ο»Ώ

Premier African Minerals Limited / Ticker: PREM / Index: AIM / Sector: Mining

Β 

For immediate release

Β 

25 November 2014

Β 

Premier African Minerals Limited ("Premier" or "the Company")

RHA Tungsten Project Update

Premier African Minerals Limited, the AIM-traded, multi-commodity natural resource company with mineral projects located in Southern and Western Africa, today provides an update on the RHA Tungsten Project ("RHA"), in Zimbabwe in respect of which Premier is the operator and holds a 49% interest.

Β 

Highlights

Β· Dewatering of Old Mine workings completed

Β· Access to historic underground workings re-established

Β· Open pit mine design and scheduling completed

Β· Suitable water sources confirmed and secured

Β· Agreement obtained to re-use old tailings facility for start-up strategy

Β 

George Roach, CEO of Premier, commented: "Premier is making significant progress in bringing the RHA mine back into production. Each step further de-risks this project and assists in reaching final financing decisions. Premier remains in intensive negotiations that are expected in the near term to enable final decisions on off-take and/or marketing contracts and the preferred structure to fund the estimated US$4.1 million required prior to commencement of production."

Β 

Dewatering and Access to the Underground Mine

The underground mine below the 926 level that had been submerged for decades, has now been completely dewatered down to the 859 level, the lowest historical level developed. A vertical sub-shaft was re-equipped with ladder ways in parallel to the dewatering program. All development ends have been accessed as well as various raises and sub-levels. Significantly, this has allowed confirmation that the historic non-compliant developed reserve as reported in our press release of 19 June 2014 is intact and available for exploitation. Confirmatory channel sampling has commenced and subject to assay results confirming the historic data, Premier looks forward to adding to our known compliant resources.

Β 

Open pit mine design

The open pit optimization, mine design and scheduling has been completed by CAE Mining and confirmed the parameters included in the PEA announcement dated 28 October 2014. These detailed results will be incorporated into the implementation planning currently underway and allows Premier to initiate the adjudication process for the open pit mining contract.

Β 

Infrastructure

The camp upgrade has been completed and allows for all requirements during the construction and operational phase.

Β 

A hydrological study on the RHA surface dam catchment area has been completed in parallel to pump testing of the boreholes on site as well as the Lukhosi well, 16km to the North West of the mine. Preliminary results allowed for developing of the site water balance and confirmed the potential to supply the required water volumes. Premier has obtained approval from the Zimbabwean Railway Authority to lease the Lukhosi well.

Β 

Tailings storage facility

Premier has obtained provisional approval to re-commission the historic tailings facility as part of the low capital start-up strategy. This will allow production to commence without the need for a capital intensive new tailings storage facility. Design and implementation of the new facility will commence as soon as RHA has successfully initiated first production.

Β 

Finance

Premier remains well funded with in excess of US$1m in cash on hand and a final tranche of US$1m from the Circum Minerals transaction expected on 15 January 2015. Completed works described in this press release have been financed and paid for by Premier. Longest lead item to production is building the process plant. This is anticipated to require 20 weeks from the date on which payment is made and the order confirmed. First production is described in Premier's open pit model that is described in our press release of 28 October 2014.

Β 

The US$4.1m referred to in the quote above, represents the peak net operating cash shortfall that Premier as a group anticipates based on the assumption that RHA is in production by end April 2015.

Β 

Premier will update shareholders when the finance structure has been agreed and the order for the plant has been placed.

Β 

Qualified Person

Werner Swanepoel, Chief Operating Officer of Premier, has reviewed and approved this release to the extent that information contained herein relates to mining and mine development. Mr Swanepoel has 20 years' experience in the southern African mining industry and holds a Master's degree in Mining Engineering, an MBA and Mine Manager's Certificates in both Metalliferous and Coal Mining. He is a registered Professional Engineer with the Engineering Council of South Africa.

Forward Looking Statements

Certain statements in this announcement, are, or may be deemed to be, forward looking statements. Forward looking statements are identified by their use of terms and phrases such as ''believe'', ''could'', "should" ''envisage'', ''estimate'', ''intend'', ''may'', ''plan'', ''will'' or the negative of those, variations or comparable expressions, including references to assumptions. These forward looking statements are not based on historical facts but rather on the Directors' current expectations and assumptions regarding the Company's future growth, results of operations, performance, future capital and other expenditures (including the amount, nature and sources of funding thereof), competitive advantages, business prospects and opportunities. Such forward looking statements reflect the Directors' current beliefs and assumptions and are based on information currently available to the Directors. A number of factors could cause actual results to differ materially from the results discussed in the forward looking statements including risks associated with vulnerability to general economic and business conditions, competition, environmental and other regulatory changes, actions by governmental authorities, the availability of capital markets, reliance on key personnel, uninsured and underinsured losses and other factors, many of which are beyond the control of the Company. Although any forward looking statements contained in this announcement are based upon what the Directors believe to be reasonable assumptions, the Company cannot assure investors that actual results will be consistent with such forward looking statements.

Β 

For further information please visit www.premierafricanminerals.com or contact the following:

Pamela Hueston

Premier African Minerals Limited

Tel: +44 (0) 755 778 3855

Michael Cornish / Roland Cornish

Beaumont Cornish Limited

(Nominated Adviser)

Tel: +44 (0) 207 628 3396

Jerry Keen/ Edward Mansfield

Shore Capital Stockbrokers Limited

Tel: +44 (0) 207 408 4090

Tim Blythe/ Halimah Hussain

BlytheWeigh

Tel: +44 (0) 207 138 3204

Β 

Β 

Notes

Premier African Minerals Limited (AIM: PREM) is a multi-commodity exploration and development company focused in Southern and Western Africa. The Company has a diverse portfolio of multi-commodity projects which includes tungsten, rare earth elements, gold, lithium, tantalum, graphite and uranium in Zimbabwe and Togo, which span from brownfield projects with near-term production potential to grass-roots exploration. The Company holds 2m shares in Circum Minerals Ltd ("Circum"), the owners of the Danakil Potash Project. At inception, the shares had a fair value of US$1.4m. Circum is fully funded to completion of feasibility study.

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
MSCBSBDBIUDBGSS
Date   Source Headline
27th May 20268:00 amRNSGrant of Options
26th May 202612:00 pmRNSOperational Update
20th May 20267:00 amRNSCreditor Settlement
13th May 20267:00 amRNSOperational Update and Funding
28th Apr 20267:00 amRNSOperational Update and Funding
17th Apr 20269:00 amRNSIssue of Equity
17th Apr 20267:00 amRNSOperational Update
16th Apr 20267:00 amRNSHolding(s) in Company
13th Apr 202612:30 pmRNSHolding(s) in Company
13th Apr 202612:29 pmRNSHolding(s) in Company
9th Apr 20267:00 amRNSHolding(s) in Company
26th Mar 20267:00 amRNSFunding
25th Mar 20267:00 amRNSOperational Update Zulu Lithium
11th Mar 20267:00 amRNSFunding
4th Mar 20265:04 pmRNSResult of AGM
4th Mar 202612:07 pmRNSZulu Lithium New Flotation Plant
4th Mar 202610:00 amRNSCanmax Interest Conversion
2nd Mar 20267:00 amRNSCorporate Update
25th Feb 20265:00 pmRNSIssue of Equity
13th Feb 20265:00 pmRNSNotice of AGM
11th Feb 20267:00 amRNSZulu Lithium Flotation Plant
4th Feb 20265:00 pmRNSCanmax Interest Conversion
21st Jan 20267:00 amRNSFunding
19th Jan 20267:00 amRNSCorporate Update
5th Jan 20267:01 amRNSOfftake and Prepayment Agreement
5th Jan 20267:00 amRNSResignation of Director
23rd Dec 20257:02 amRNSCorporate Update
16th Dec 20251:03 pmRNSCanmax Interest Conversion
10th Dec 202511:36 amRNSCorporate Update
27th Nov 20257:00 amRNSInterim Funding
19th Nov 20255:30 pmRNSResult of Meeting
19th Nov 20258:08 amRNSZulu Lithium Update
7th Nov 202510:30 amRNSAdjournment of General Meeting
30th Oct 202511:05 amRNSAdjournment of General Meeting
30th Oct 202511:00 amRNSZulu Lithium Plant Update
15th Oct 20256:00 pmRNSNotice of GM
10th Oct 20257:00 amRNSShare Consolidation
6th Oct 20256:00 pmRNSShare Consolidation
30th Sep 20252:00 pmRNSInterim Results
17th Sep 20257:00 amRNSZulu Lithium Plant Update
3rd Sep 20257:00 amRNSBoard changes
2nd Sep 20257:00 amRNSCanmax Interest Conversion
21st Aug 20257:00 amRNSFunding
20th Aug 20257:00 amRNSZulu Lithium Plant Update
8th Aug 20257:00 amRNSZulu Lithium Plant Update
4th Aug 20257:00 amRNSZulu Lithium Plant Update
1st Aug 20256:05 pmRNSHolding(s) in Company
1st Aug 20256:00 pmRNSDirector/PDMR Shareholding
25th Jul 20255:00 pmRNSZulu Lithium Plant Update
21st Jul 202512:34 pmRNSIssue of equity and corporate update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.