The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

6 Oct 2016 07:00

RNS Number : 8278L
President Energy PLC
06 October 2016
 

6 October 2016

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

 

WELL DP1002 S/T DOS PUNTITAS FIELD, PUESTO GUARDIAN CONCESSION,

SALTA PROVINCE, ARGENTINA

OPERATIONAL UPDATE

 

President Energy (AIM: PPC), the oil and gas exploration company provides the following update on its operations.

President regrets to announce that it has been forced to temporarily suspend well DP1002 S/T so that the Drilling Rig can be mobilised to the Company's neighbour for drilling their well. This was due to the significant difficulties encountered in running casing in the drilled well, due to a twist-off of a 1000m section which was lost downhole and not practical to recover within the timeframe. The mobilisation of an appropriate workover rig to fish the casing is now being considered.

As previously reported, there have been significant service quality issues encountered in this well and the challenges presented have been enormous. Issues with the Rig were followed by a fractured drill pipe and then two failed cement plugs through compressive strength issues.

Whilst President continued to drill through all these difficulties and intercepted the target formation, the attempt at casing this well has proved an issue too far at this present time.

Investigations will now commence with all contractors to identify the failings in operations as it is extremely unusual to encounter such a combination of issues in the course of a single well. On the well we had leading names in the industry, Helmerich & Payne drilling contractors, Schlumberger mud contractors, Weatherford supplying Company Men, directional drilling and casing running and Baker Hughes cementing. All of the issues were unforeseen even after taking into account the detailed risk analysis and peer review undertaken before drilling commenced.

Nevertheless, as the decision has been taken to temporarily suspend further attempts at completing this well at this time, President is reviewing further action on this well and on the drilling programme. As well as the fishing operations being considered, the well remains available for a further side track to re-intersect the producing formation. In the interim the Company is therefore releasing the Drilling Rig on to Petro AP, currently operating in the neighbouring block in order, to drill its Pizarro well.

The temporary suspension of the well in no way impacts on the reserves or prospectivity of the target formation in this Dos Puntitas field which remain robust and in place. Indeed, that Dos Puntitas Yacoraite formation continues to be a major contributor to President's existing production from the Concession, which production continues to be stable.

The coiled tubing unit should commence work on the first of the shut-in wells of the projected programme at the weekend.

 

Peter Levine, Chairman, commented:

"Despite the inevitable disappointment and frustration we feel with the drilling process, it is important to carefully assess the situation and determine the best route forward with this well and with our drilling programme. The frustration is particularly acute as we believe this development well, successfully completed, will be an excellent producer with the oil still there and available to be extracted. As a first and natural step, this well will be the subject of a serious and detailed internal review as well as discussions with our service providers.

"This is however not a time for kneejerk reaction and after careful assessment of the situation we will report back to shareholders.

 "In the meantime production in Argentina continues at the levels announced in our interim report with Louisiana production now in excess of 200 boepd".

 

Miles Biggins, BSc Joint Honours University College London, with 25 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

This announcement is inside information for the purposes of article 7 of Regulation 596/2014

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

BMO Capital Markets (Joint Broker)

Jeremy Low, Neil Haycock and Tom Rider

 

 +44 (0) 207 236 1010

 

Vigo Communications

Chris McMahon

Patrick D'Ancona

+44 (0)20 7830 9700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGGAWUUPQPGA
Date   Source Headline
5th Nov 20207:00 amRNSHolding(s) in Company
27th Oct 20207:00 amRNSDrilling Update
26th Oct 20202:15 pmRNSCGC Share Subscription
26th Oct 20207:00 amRNSUnaudited Interim Results and Current trading
26th Oct 20207:00 amRNSDrilling Update
20th Oct 20205:20 pmRNSHolding(s) in Company
14th Oct 20207:00 amRNSDrilling Update
7th Oct 20207:00 amRNSChange of Auditor
7th Oct 20207:00 amRNSDrilling Update
22nd Sep 20207:00 amRNSWorkover and Drilling Update
15th Sep 20207:00 amRNSOperational Update
3rd Sep 20207:00 amRNSOperational Update
26th Aug 20207:00 amRNSOperational and Corporate Update
28th Jul 202011:30 amRNSCGC Share Subscription
27th Jul 20207:00 amRNSOil Export and Production Update
22nd Jul 20202:00 pmRNSResult of AGM
20th Jul 20207:00 amRNSAGM and Investor Meet Company Presentation
13th Jul 20207:00 amRNSDrilling and Workover Update
26th Jun 20207:00 amRNSPosting of Annual Report and Notice of AGM
24th Jun 20205:12 pmRNSHolding(s) in Company
24th Jun 20205:09 pmRNSHolding(s) in Company
24th Jun 20207:00 amRNSDirector Appointment
22nd Jun 20202:07 pmRNSResult of General Meeting
22nd Jun 202011:54 amRNSAudited Results for year ended 31 December 2019
22nd Jun 20207:00 amRNSAppointment of sole broker
17th Jun 20204:23 pmRNSGeneral Meeting Update
15th Jun 20207:00 amRNSDrilling and workover plan update Rio Negro
5th Jun 20207:00 amRNSPosting of Circular and Notice of General Meeting
4th Jun 20204:41 pmRNSSecond Price Monitoring Extn
4th Jun 20204:36 pmRNSPrice Monitoring Extension
4th Jun 202011:06 amRNSSecond Price Monitoring Extn
4th Jun 202011:00 amRNSPrice Monitoring Extension
4th Jun 20207:00 amRNSResult of PrimaryBid Offer
3rd Jun 20204:31 pmRNSPrimaryBid.com Offer
3rd Jun 20204:30 pmRNSSubscription for new ordinary shares by Trafigura
19th May 202011:46 amRNSMarket Update
27th Apr 20207:00 amRNSCGC Share Subscription
23rd Apr 20202:51 pmRNSHolding(s) in Company
7th Apr 20205:14 pmRNSHolding(s) in Company
12th Mar 20207:00 amRNSMarket Update
3rd Mar 20207:00 amRNSNew Rio Negro pipeline update
27th Feb 20207:00 amRNSNew Company Presentation
7th Feb 20202:19 pmRNSPDMR Shareholding
6th Feb 202012:57 pmRNSResult of General Meeting
3rd Feb 20207:00 amRNS2019 full year Trading Update
29th Jan 20205:15 pmRNSHolding(s) in Company
28th Jan 20203:59 pmRNSChange of Registered Office
28th Jan 20203:58 pmRNSCGC Share Subscription
27th Jan 202011:55 amRNSHolding(s) in Company
27th Jan 20207:00 amRNSNew independently certified reserves report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.