The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operational Update

6 Oct 2016 07:00

RNS Number : 8278L
President Energy PLC
06 October 2016
 

6 October 2016

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

 

WELL DP1002 S/T DOS PUNTITAS FIELD, PUESTO GUARDIAN CONCESSION,

SALTA PROVINCE, ARGENTINA

OPERATIONAL UPDATE

 

President Energy (AIM: PPC), the oil and gas exploration company provides the following update on its operations.

President regrets to announce that it has been forced to temporarily suspend well DP1002 S/T so that the Drilling Rig can be mobilised to the Company's neighbour for drilling their well. This was due to the significant difficulties encountered in running casing in the drilled well, due to a twist-off of a 1000m section which was lost downhole and not practical to recover within the timeframe. The mobilisation of an appropriate workover rig to fish the casing is now being considered.

As previously reported, there have been significant service quality issues encountered in this well and the challenges presented have been enormous. Issues with the Rig were followed by a fractured drill pipe and then two failed cement plugs through compressive strength issues.

Whilst President continued to drill through all these difficulties and intercepted the target formation, the attempt at casing this well has proved an issue too far at this present time.

Investigations will now commence with all contractors to identify the failings in operations as it is extremely unusual to encounter such a combination of issues in the course of a single well. On the well we had leading names in the industry, Helmerich & Payne drilling contractors, Schlumberger mud contractors, Weatherford supplying Company Men, directional drilling and casing running and Baker Hughes cementing. All of the issues were unforeseen even after taking into account the detailed risk analysis and peer review undertaken before drilling commenced.

Nevertheless, as the decision has been taken to temporarily suspend further attempts at completing this well at this time, President is reviewing further action on this well and on the drilling programme. As well as the fishing operations being considered, the well remains available for a further side track to re-intersect the producing formation. In the interim the Company is therefore releasing the Drilling Rig on to Petro AP, currently operating in the neighbouring block in order, to drill its Pizarro well.

The temporary suspension of the well in no way impacts on the reserves or prospectivity of the target formation in this Dos Puntitas field which remain robust and in place. Indeed, that Dos Puntitas Yacoraite formation continues to be a major contributor to President's existing production from the Concession, which production continues to be stable.

The coiled tubing unit should commence work on the first of the shut-in wells of the projected programme at the weekend.

 

Peter Levine, Chairman, commented:

"Despite the inevitable disappointment and frustration we feel with the drilling process, it is important to carefully assess the situation and determine the best route forward with this well and with our drilling programme. The frustration is particularly acute as we believe this development well, successfully completed, will be an excellent producer with the oil still there and available to be extracted. As a first and natural step, this well will be the subject of a serious and detailed internal review as well as discussions with our service providers.

"This is however not a time for kneejerk reaction and after careful assessment of the situation we will report back to shareholders.

 "In the meantime production in Argentina continues at the levels announced in our interim report with Louisiana production now in excess of 200 boepd".

 

Miles Biggins, BSc Joint Honours University College London, with 25 years of experience in the oil and gas sector, is a Petroleum Engineer and member of the Society of Petroleum Engineers who meets the criteria of qualified persons under the AIM guidance note for mining and oil and gas companies, has reviewed and approved the technical information contained in this announcement.

This announcement is inside information for the purposes of article 7 of Regulation 596/2014

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

BMO Capital Markets (Joint Broker)

Jeremy Low, Neil Haycock and Tom Rider

 

 +44 (0) 207 236 1010

 

Vigo Communications

Chris McMahon

Patrick D'Ancona

+44 (0)20 7830 9700

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUGGAWUUPQPGA
Date   Source Headline
20th Mar 20097:00 amRNSOperations Update
16th Feb 200912:41 pmRNSMichigan road restrictions
30th Jan 20097:00 amRNSTrading Update
22nd Dec 20087:00 amRNSOperational Update
12th Nov 20087:00 amRNSOperations Update
3rd Nov 200812:03 pmRNSHolding(s) in Company
23rd Oct 20085:14 pmRNSResult of EGM
23rd Oct 20087:00 amRNS3D Seismic Contract Signed for Australian Licence
21st Oct 20087:00 amRNSProduction and Reserves Update
25th Sep 20087:00 amRNSShare Consolidation
25th Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSOperations Update
11th Aug 20083:28 pmRNSNotice of Results
5th Aug 20087:00 amRNSOperations Update
15th Jul 200812:52 pmRNSDirector/PDMR Shareholding
10th Jul 200811:16 amRNSUpdate on Shareholder Registe
4th Jul 20087:00 amRNSProduction Update
1st Jul 20082:50 pmRNSCompletion of Acquisition
23rd Jun 20084:54 pmRNSNotification of Interest
20th Jun 20083:12 pmRNSNotification of Interest
19th Jun 20089:10 amRNSAIM Censure
19th Jun 20089:00 amRNSAIM Disciplinary Notice
16th Jun 20083:42 pmRNSDirector/PDMR Shareholding
13th Jun 20084:17 pmRNSGrant of Options
12th Jun 20083:10 pmRNSHolding(s) in Company
12th Jun 20087:00 amRNSAcquisition and Debt Facility
12th Jun 20087:00 amRNSOperations Update
11th Jun 20084:17 pmRNSHolding(s) in Company
5th Jun 20087:00 amRNSRe. Share Register
29th May 200812:39 pmRNSUpdate on Australian Licences
29th May 20087:00 amRNSIncreased allowable productio
20th May 20082:12 pmRNSNotification of interest
19th May 20082:06 pmRNSAnnual Report and Accounts
14th May 20086:30 pmRNSNotification of Interest
13th May 20089:08 amRNSNew daily production record a
6th May 200810:38 amRNSProduction Update
23rd Apr 20083:01 pmRNSOperations Update
17th Apr 20086:06 pmRNSNotification of Interest
17th Apr 20086:02 pmRNSNotification of Interest
16th Apr 20087:00 amRNSPreliminary Results
11th Apr 20083:57 pmRNSNotification of Interest
26th Mar 20088:46 amRNSEPT - Meridian Petroleum
25th Mar 20081:08 pmRNSUpdate on Offer & Operations
25th Mar 200810:42 amRNSEPT - Meridan Petroleum
20th Mar 20088:40 amRNSEPT - Meridian Petroleum
19th Mar 20089:34 amRNSEPT - Meridian Petroleum
18th Mar 20088:56 amRNSEPT - Meridian Petroleum
14th Mar 200810:43 amRNSEPT - Meridian Petroleum PLC
12th Mar 20082:35 pmRNSHolding(s) in Company
10th Mar 200811:56 amRNSEPT - Meridian Petroleum

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.