PYX Resources: Achieving volume and diversification milestones. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Operation and Production Update

7 Dec 2020 07:00

RNS Number : 6747H
President Energy PLC
07 December 2020
 

 

 

7 December 2020

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

Operation and production update

Production hits 4,000 boepd

Investor conference call scheduled

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets, announces an operations and production update in relation to its activities across the Group.

 

Key points

Compressor at Las Bases field, Rio Negro, now commissioned

Newly drilled well LB-1001 at the Las Bases field opened up and producing, new EVN-x1 at the Estancia Vieja field well to follow

Production in Salta, Argentina stable and South Louisiana, USA steady

Total current instantaneous Group net production estimated at approximately 4,000 boepd

Current net gas production in Argentina approximately 2,000 boepd

The Company is currently finalising plans for next year's capital expenditure

Investor conference call scheduled for 11:00 (GMT) on Tuesday 8th December 2020 

 

 

Operations

 

The new compressor infrastructure at the Las Bases field has been commissioned and is in operation. The compressor enables more gas to be delivered from the Company's Estancia Vieja gas wells. Accordingly, this is the first time four wells in this field have been able to produce together and are now flowing gas to market through President's pipeline infrastructure. The Company has identified potential to drill further wells in that field.

 

At the same time, the newly drilled LB-1001 (gas) well has been placed on production, with aggregate production from this well is currently ahead of expectation. The recently tested well LB-1, as yet not on stream, will be connected and placed into production before year end. Likewise the new well EVN-x1 is currently off-line having a pump fitted. President will monitor the results from that well in due course with a view to drilling shallow appraisal and production gas wells in the Las Bases field in 2021. Current cost projections per well, including artificial stimulation are around US$1 million.

 

The production from the Puesto Guardian concession in Salta is stable. As previously announced, President is progressing with planning and a feasibility study with a view to drilling 2 or 3 vertical development oil wells in 2021 in the Dos Puntitas field, part of the Puesto Guardian concession, and is in the process of applying for the relevant environmental and location permissions. The last vertical well drilled in Dos Puntitas initially produced 250 boepd.

 

In South Louisiana, USA, production is steady with only small declines over the last 12 months. The Simmons 2 well having been off-line for repair for over two months has come back on line with total net production from the wells now approximately 280 boepd.

 

In the light of the overall progress made, operational plans for the next 13 months are now being prepared and will be announced in January 2021 after Board review.

 

 

Production

 

Aggregate group net production has now reached 4,000 boepd with virtually an even split between oil and gas.

 

This is a current daily production rate and demonstrates the level that President, on present evidence, considers the wells can deliver. As such this rate varies day by day as wells go on and off-line. The average rate over time is a more valuable representation of the production and these figure will be published at appropriate times.

 

Nevertheless the general increase in production, with no material increase in opex, will have a beneficial effect on the costs per barrel and the bottom line of the Company taking into account the base opex cost in the fields has already been largely covered by core production.

 

President is now considering the most expedient long term production levels for optimum field and reservoir management. Such consideration will, inter alia, take into account the fluctuation between Argentina's domestic summer and winter gas pricing and the ability to constrain or increase each well's production depending on all prevailing circumstances.

 

Prices

 

In relation to prices, the Company notes the recent positive upward movement of both the oil price and Argentina gas prices, the latter particularly welcome since it coincides with the Company materially increasing its gas output.

 

The oil price receivable by President for December production is estimated at more than the US$42 per barrel mark for the first time since March with the current spot gas prices achieved in the first week of December being US$2.10 per MMBtu which prices fluctuate week by week. These prices permit the consideration of the drilling expenditure in 2021 referred to above.

 

 

Peter Levine, Chairman, commented

 

"Steady progress is being achieved but we have the capacity within ourselves to build on this and achieve more. In this regard the announcement today and those made recently demonstrate such capability and underline the potential in our assets which we continue to work hard to realise.

 

"We look forward to increased activity next year and expect to make an announcement within the next two months regarding future plans and timing".

Conference Call

 

The Company will be hosting a conference call, focussing on today's announcement, for Investors at 11:00 (GMT) on Tuesday 8th December 2020.

 

Conference call dial-in details:

 

· United Kingdom Toll-Free: 08003589473 PIN: 56808439#

· United Kingdom Toll:  +44 3333000804 PIN: 56808439#

 

 

 

 Glossary:

 

Boepd means barrels of oil equivalent (oil and gas) per day

LB means a well in Las Bases field, Rio Negro Province, Argentina

M3/d means cubic metres of production of gas or oil as the case may be

MMBtu means Million british thermal units of gas

MMcf/d means Million standard cubic feet per day

P50 means mid-case

 

 

Contact:

President Energy PLC

Rob Shepherd, Group FD

Nikita Levine, Investor Relations

 

 

 

+44 (0) 207 016 7950

 Info@presidentpc.com

finnCap (Nominated Advisor)

Christopher Raggett, Charlie Beeson

 

+44 (0) 207 220 0500

 

Shore Capital (Corporate Broker)

Jerry Keen, Antonio Bossi

 

 

+44 (0) 207 408 4090

 

 

Notes to Editors

 

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UPDUNUKRRNUURRA
Date   Source Headline
2nd Aug 20177:00 amRNSArgentina Workover and Group Production Update
28th Jul 20177:00 amRNSChange of Adviser
17th Jul 20177:00 amRNSArgentina Workover Update
5th Jul 20177:00 amRNSArgentina Oil Sales Update
28th Jun 20172:30 pmRNSResult of AGM
21st Jun 20177:00 amRNSAward of Options
14th Jun 20177:00 amRNSArgentina Production Update
12th Jun 20177:00 amRNSParaguay Update
7th Jun 20177:00 amRNSPosting of Annual Report and Notice of AGM
6th Jun 20177:00 amRNSAppointment of Chief Financial Officer
2nd Jun 20177:00 amRNSFull Year Results
12th May 20177:00 amRNSUpdate on Ongoing Disputes with Service Providers
19th Apr 20177:00 amRNSLouisiana Update
4th Apr 20177:00 amRNSArgentina Operations Update
29th Mar 20177:00 amRNSArgentina Operations Update
15th Mar 20177:00 amRNSAudited Argentine Reserves Upgrade
10th Mar 20177:00 amRNSOperations Update
20th Feb 20177:00 amRNSOperations Update
11th Jan 20177:00 amRNSArgentina Operations Update
8th Dec 20163:15 pmRNSHolding(s) in Company
7th Dec 20163:50 pmRNSHolding(s) in Company
7th Dec 20167:20 amRNSHolding(s) in Company
5th Dec 20169:45 amRNSDirector/PDMR Shareholding
2nd Dec 20161:00 pmRNSResult of GM
30th Nov 20167:00 amRNSIFC Equity Subscription
18th Nov 20167:00 amRNSStatement regarding press speculation
16th Nov 20165:30 pmRNSPosting of Circular and Notice of General Meeting
16th Nov 20164:35 pmRNSPrice Monitoring Extension
15th Nov 20165:25 pmRNSReplacement - Results of Placing
15th Nov 20163:10 pmRNSResults of Placing
15th Nov 20167:00 amRNSProposed Fundraising and Loan Restructuring
20th Oct 20167:00 amRNSOperational Update
6th Oct 20167:00 amRNSOperational Update
30th Sep 20167:00 amRNSHalf-year Report
29th Sep 20167:00 amRNSOperational Update
2nd Sep 20167:00 amRNSOperational Update
11th Aug 20164:40 pmRNSSecond Price Monitoring Extn
11th Aug 20164:35 pmRNSPrice Monitoring Extension
8th Aug 20167:00 amRNSDrilling Update
26th Jul 20167:00 amRNSDirector Dealings
25th Jul 20164:40 pmRNSSecond Price Monitoring Extn
25th Jul 20164:35 pmRNSPrice Monitoring Extension
22nd Jul 20167:00 amRNSChange of Adviser
18th Jul 20167:00 amRNSDirector Dealings
11th Jul 20167:00 amRNSDirector Dealings
1st Jul 20167:00 amRNSAward of Options
28th Jun 20162:45 pmRNSResult of AGM
28th Jun 20167:00 amRNSArgentina Operations and Funding Update
3rd Jun 20164:19 pmRNSNotice of AGM
27th May 20167:00 amRNSFinal Results

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.