SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Drilling Update

9 Mar 2021 07:00

RNS Number : 5563R
President Energy PLC
09 March 2021
 

9 March 2021

 

PRESIDENT ENERGY PLC

("President" or the "Company")

 

 Rio Negro 2021 drilling update

 

President Energy (AIM: PPC), the energy company with a diverse portfolio of production and exploration assets focused primarily in South America, provides an update on its drilling programme in Rio Negro Province, Argentina

 

Highlights

· Drilling rig contracted with site preparations in progress

· On schedule to commence first well by end of March

· Re-alignment of drilling order to maximise production and decision making efficacy

· First well to be drilled will be LB-1002 in the Las Bases Concession, Rio Negro

 

President announces that it has the drilling rig under contract with Quintana Well Pro for its new wells to be drilled in Rio Negro province. Well site preparations have commenced and the Company expects to commence drilling on schedule by the end of March 2021.

 

Planning has evolved since the 'H1 2021 Drilling Update' made on 20 January 2021. All of the wells are of the slim hole type and located near existing facilities so that they can be placed on production with no material delay or cost.

 

The first well to be drilled will be LB-1002 in the Las Bases field as previously announced. It is a gas well targeting the Centenario formation with a target depth of 1,300 metres, time to drill is estimated at 10 days and a projected cost of US$1.4 million. As indicated in the previous announcement, President projects 40,000 m3/d (1.4 MMsft/d or circa 230 boepd) initial production. The original projected depth of the well has been extended to take in further deeper potential pay zones in the formation shown in the seismic data. Extensive logs will be taken to improve understanding of the formation and its produceability.

 

The second and third gas wells will now be at the Estancia Vieja field. These are twins of old wells that have suffered casing collapses, but prior to which showed proven gas production. The wells EV-1001 twinning the old well EV x-1 (which produced in December until the collapse) and EV-1002 twinning the old well EV-4 have each a target depth of 1850 metres, an estimated drilling time of 12 days and a cost of US$1.6 million. The Company projects initial production from each of these wells at 60,000 m3/d (2.1 MMsft/d or circa 350 boepd).

 

As so far President has produced from only one well in the Centenario formation namely the old but newly perforated well LBx1, the interposing of the Estancia Vieja wells should allow consideration of the logs and initial production testing of LB-1002 with a view to determining the nature of follow-on wells at Las Bases. It is expected that the above three firm wells will be completed and in production during May. The timing of any follow-on wells at Las Bases will be provided once these wells, as per the above, have been determined.

 

In parallel to the above work, again as previously announced, in the next few days the new well LB-1001, drilled and completed in Q4 2020, will be subject to a workover to perforate and produce from the original main target interval in that well, being the Intra- Loma Mantosa formation. It is anticipated that initial production from that interval of some 26 metres total net thickness will be 80,000 m3/d (2.8 MMsft/d or 470 boepd). This interval should provide longer life and less water production than the lower much thinner section which had very good initial production but is currently being produced with a high percentage of water.

 

As anticipated, spot gas prices in Argentina, even still in the summer months, have shown increases with a level of US$2.5 per MMBtu currently and rising. President now projects spot gas prices possibly reaching US$3.5 per MMBtu in the five winter months commencing in May.

 

Peter Levine, Chairman, commented

"President continues on its stated work trajectory with a prudent level of optimism supported by robust pricing for our gas offerings.

 

"The mission is to make our average production more robust, increase our well stock to greater insulate us against the inevitable well down times, benefit from economies of scale using our own pipeline infrastructure and get these gas wells drilled on budget and in time for the more favourable winter price environment."

 

 

Glossary:

All projections of production are mid-case estimates

Boepd barrels of oil equivalent (oil and gas) per day

M3/d means cubic metres of production of gas or oil as the case may be

MMBtu Million of standard British thermal units

MMsft/d million standard cubic feet of gas per day

 

 

 

Contact:

President Energy PLC

 

Nikita Levine, Investor Relations

 

 

+44 (0) 207 016 7950

 

 info@presidentpc.com

finnCap (Nominated Advisor)

Christopher Raggett, Charlie Beeson

 

+44 (0) 207 220 0500

 

Shore Capital (Corporate Broker)

Jerry Keen, Antonio Bossi

 

 

+44 (0) 207 408 4090

 

Notes to Editors

President Energy is an oil and gas company listed on the AIM market of the London Stock Exchange (PPC.L) primarily focused in Argentina, with a diverse portfolio of operated onshore producing and exploration assets.

 

The Company has operated interests in the Puesto Flores, Estancia Vieja, Puesto Prado and Las Bases Concessions, and Angostura exploration contract, all of which are situated in the Rio Negro Province in the Neuquén Basin of Argentina and in the Puesto Guardian Concession, in the Noroeste Basin in NW Argentina. Alongside this, President Energy has cash generative production assets in Louisiana, USA and further significant exploration and development opportunities through its acreage in Paraguay and Argentina.

 

The Group is also actively pursuing value accretive acquisitions of high-quality production and development assets capable of delivering positive cash flows and shareholder returns. With a strong strategic and institutional base of support, including the international commodity trader and logistics company Trafigura, an in-country management team as well as the Chairman whose interests as the largest shareholder are aligned to those of its shareholders, President Energy gives UK investors access to an energy growth story combined with world class standards of corporate governance, environmental and social responsibility.

This announcement contains inside information for the purposes of article 7 of Regulation 596/2014

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLDGGDXDBGDGBI
Date   Source Headline
22nd Jan 20207:00 amRNSPosting of Circular and Notice of General Meeting
20th Jan 20207:00 amRNSSubscription for new Ordinary Shares by Trafigura
7th Jan 202011:05 amRNSSecond Price Monitoring Extn
7th Jan 202011:00 amRNSPrice Monitoring Extension
3rd Jan 20201:11 pmRNSHolding(s) in Company
3rd Jan 202012:37 pmRNSHolding(s) in Company
20th Dec 20193:59 pmRNSHolding(s) in Company
17th Dec 20197:00 amRNSStmnt re Share Price Movement
20th Nov 20197:00 amRNSCompletion of Angostura Acquisition
14th Nov 20197:00 amRNSExpiry of Decree 566 - oil prices return to normal
1st Nov 20197:00 amRNSGroup Update
21st Oct 20197:00 amRNSAcquisition and Subscription
30th Sep 20197:00 amRNSUnaudited Interim Results and Group outlook
17th Sep 20197:00 amRNSPublication of half year unaudited accounts
2nd Sep 201911:12 amRNSFurther update on Argentina
28th Aug 20197:00 amRNSFurther Update on Argentina
13th Aug 20191:26 pmRNSCompany Update
6th Aug 20197:00 amRNSH1 Group Management Reporting & Operational Update
25th Jul 20197:00 amRNSNew Offtake Arrangements
16th Jul 20197:00 amRNSArgentina update
27th Jun 20191:22 pmRNSResult of AGM
27th Jun 20197:00 amRNSAGM Statement
31st May 20197:00 amRNSPosting of Annual Report and Notice of AGM
23rd May 20197:00 amRNSFY Results for year ended 31 Dec 2018 & Q1 update
7th May 20197:00 amRNSNotice of 2018 Annual Results and Q1 update
29th Apr 201911:05 amRNSSecond Price Monitoring Extn
29th Apr 201911:00 amRNSPrice Monitoring Extension
25th Mar 20197:00 amRNSAppointment of Joint Broker
25th Mar 20197:00 amRNS2019/20 Work Programme
14th Mar 20194:14 pmRNSHolding(s) in Company
14th Mar 201911:37 amRNSResult of General Meeting
13th Mar 20198:44 amRNSPDMR / Director Shareholding
11th Mar 20194:15 pmRNSResult of Offer for Subscription & Loan Conversion
25th Feb 20197:00 amRNSOffer for Subscription for up to £6.5 million
15th Feb 20197:00 amRNSNew independently certified reserves report
4th Feb 201912:52 pmRNSHolding(s) in Company
31st Jan 20197:00 amRNS2018 unaudited Group Management Report Highlights
10th Jan 20192:39 pmRNSHolding(s) in Company
9th Jan 20197:00 amRNSNet Group year-end production target beaten
20th Dec 20187:00 amRNSNew Concessions Update Rio Negro, Argentina
18th Dec 20187:00 amRNSDrilling success at Puesto Flores, Argentina
7th Dec 20187:00 amRNSUpdate from Rio Negro Province, Argentina
6th Dec 20187:00 amRNSAppointment of Joint Broker
3rd Dec 20187:00 amRNSCompany Presentation
28th Nov 20187:00 amRNSAcquisition: Las Bases & Puesto Prado Concessions
27th Nov 20187:00 amRNSDrilling update
22nd Nov 20187:00 amRNSArgentina Update
13th Nov 20187:26 amRNSArgentina Update
29th Oct 20187:00 amRNSQ3 2018 unaudited Group Management Report
26th Oct 20187:00 amRNSDrilling update at Puesto Flores field, Argentina

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.