SpaceX IPO is the biggest IPO in stock market history. Join the conversation.Click here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPPC.L Regulatory News (PPC)

  • There is currently no data for PPC

Argentina Workover Update

17 Jul 2017 07:00

RNS Number : 1835L
President Energy PLC
17 July 2017
 

17 July 2017

PRESIDENT ENERGY PLC

("President", "the Company" or "President Energy")

 

Argentina, Puesto Guardian Concession Workover Update

Canada Grande field back in production after many years

 

President Energy (AIM: PPC), the upstream oil and gas company, provides an update on its continued work-over programme at its Puesto Guardian Concession, Argentina ("the Concession").

Since the last workover update on 14 June 2017, President has successfully completed work on the new water disposal well at Dos Puntitas 8 and brought the prior successful workovers at Puesto Guardian 21 and Dos Puntitas 15 into production as planned and at expected levels. The Rig then moved to Well CGr-20 at the Canada Grande field in the Concession.

The Concession, by way of reminder, consists of five main fields, four of which (Dos Puntitas, Pozo Escondido, Puesto Guardian and Martinez del Tineo) have currently producing wells.

However, the fifth field, Canada Grande, had not seen any consistent production activity since 2011. The workover at CGr-20, which last produced 32 years ago in 1985, involved perforating a previously ignored and untouched 5-metre section of reservoir which the President team identified as potentially oil bearing, situated above the old production zone in the Cretaceous level which had ceased to flow.

The well has on a two day test successfully and steadily free flowed good quality light oil, 43 degree API at rates in the range of 50-80 bopd without the need for the previously planned stimulation or downhole pump.

Accordingly, steps are now being taken to hook up this well to the Puesto Guardian field battery as the Canada Grande field is in a remote location having had its infrastructure removed some time ago.

The successful test results and steady oil flow has encouraged President to consider other old wells in the Canada Grande field as well as undrilled prospectivity there.

In the meantime, the Rig is now moving back to the Puesto Guardian field for the next workover at Well PG-19. In parallel, facility upgrades continue to take place with the emphasis on replacing old equipment, maintaining production with the minimum of shut downs and bringing in more powerful surface pumps to more adequately handle the increased gross fluids being produced.

 

Peter Levine, Chairman and Chief Executive, commented:

"In the face of a remote location and varied downhole challenges in a 30 year old well, to bring the fifth field at our Puesto Guardian Concession back into contributing production after many years is a commendable achievement. The fact that we are producing oil from a previously ignored zone in the reservoir gives us an impetus to look at the field with fresh and increasingly educated eyes."

"We now move forward to the next workover at Well PG-19 in the Puesto Guardian Field"

"The success underlines the advantage of President having 34 years of its production licence remaining giving the Company ample opportunity to produce out, at its discretion with regard to timing, its almost 20MMBOE of independently audited 2P Reserves".

 

Glossary

Degree API is a measure of how heavy or light is a petroleum liquid. The higher the figure the lighter it is.

Bopd means barrels of oil per day

MMBOE means million barrels of oil equivalent

2P means proven and probable reserves

This announcement is inside information for the purposes of article 7 of Regulation 596/2014

 

 

 

Contact:

 

President Energy PLC

Peter Levine, Chairman

Miles Biggins, COO

 

 

+44 (0) 207 016 7950

+44 (0) 207 016 7950

 

Peel Hunt LLP (Nominated Advisor & Joint Broker)

Richard Crichton, Ross Allister

 

 

+44 (0) 207 418 8900

BMO Capital Markets (Joint Broker)

Jeremy Low, Neil Haycock and Tom Rider

 

 +44 (0) 207 236 1010

 

Vigo Communications

Chris McMahon

Patrick D'Ancona

+44 (0) 207 830 9700

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDDQLFFDDFEBBD
Date   Source Headline
5th Nov 20207:00 amRNSHolding(s) in Company
27th Oct 20207:00 amRNSDrilling Update
26th Oct 20202:15 pmRNSCGC Share Subscription
26th Oct 20207:00 amRNSUnaudited Interim Results and Current trading
26th Oct 20207:00 amRNSDrilling Update
20th Oct 20205:20 pmRNSHolding(s) in Company
14th Oct 20207:00 amRNSDrilling Update
7th Oct 20207:00 amRNSChange of Auditor
7th Oct 20207:00 amRNSDrilling Update
22nd Sep 20207:00 amRNSWorkover and Drilling Update
15th Sep 20207:00 amRNSOperational Update
3rd Sep 20207:00 amRNSOperational Update
26th Aug 20207:00 amRNSOperational and Corporate Update
28th Jul 202011:30 amRNSCGC Share Subscription
27th Jul 20207:00 amRNSOil Export and Production Update
22nd Jul 20202:00 pmRNSResult of AGM
20th Jul 20207:00 amRNSAGM and Investor Meet Company Presentation
13th Jul 20207:00 amRNSDrilling and Workover Update
26th Jun 20207:00 amRNSPosting of Annual Report and Notice of AGM
24th Jun 20205:12 pmRNSHolding(s) in Company
24th Jun 20205:09 pmRNSHolding(s) in Company
24th Jun 20207:00 amRNSDirector Appointment
22nd Jun 20202:07 pmRNSResult of General Meeting
22nd Jun 202011:54 amRNSAudited Results for year ended 31 December 2019
22nd Jun 20207:00 amRNSAppointment of sole broker
17th Jun 20204:23 pmRNSGeneral Meeting Update
15th Jun 20207:00 amRNSDrilling and workover plan update Rio Negro
5th Jun 20207:00 amRNSPosting of Circular and Notice of General Meeting
4th Jun 20204:41 pmRNSSecond Price Monitoring Extn
4th Jun 20204:36 pmRNSPrice Monitoring Extension
4th Jun 202011:06 amRNSSecond Price Monitoring Extn
4th Jun 202011:00 amRNSPrice Monitoring Extension
4th Jun 20207:00 amRNSResult of PrimaryBid Offer
3rd Jun 20204:31 pmRNSPrimaryBid.com Offer
3rd Jun 20204:30 pmRNSSubscription for new ordinary shares by Trafigura
19th May 202011:46 amRNSMarket Update
27th Apr 20207:00 amRNSCGC Share Subscription
23rd Apr 20202:51 pmRNSHolding(s) in Company
7th Apr 20205:14 pmRNSHolding(s) in Company
12th Mar 20207:00 amRNSMarket Update
3rd Mar 20207:00 amRNSNew Rio Negro pipeline update
27th Feb 20207:00 amRNSNew Company Presentation
7th Feb 20202:19 pmRNSPDMR Shareholding
6th Feb 202012:57 pmRNSResult of General Meeting
3rd Feb 20207:00 amRNS2019 full year Trading Update
29th Jan 20205:15 pmRNSHolding(s) in Company
28th Jan 20203:59 pmRNSChange of Registered Office
28th Jan 20203:58 pmRNSCGC Share Subscription
27th Jan 202011:55 amRNSHolding(s) in Company
27th Jan 20207:00 amRNSNew independently certified reserves report

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.