Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Resources PLC Regulatory News (POW)

If you are a professional, HNW or sophisticated investor and want to learn more about the current investment opportunity in Peloton Minerals, please submit your details here.

Share Price Information for Power Metal Resources PLC (POW)

Share Price is delayed by 15 minutes
Get Live Data
13.25    -0.15 (-1.11%)
Bid:
13.00
Ask:
13.50
Spread: 0.50 (3.846%)
Market Cap: £15.07m
POW Live PriceLast checked at - London Stock Exchange

Intraday Power Metal Resources PLC Share Chart

Canadian Silver Project - Drilling Contract Signed

22 Oct 2020 09:16

RNS Number : 9110C
Power Metal Resources PLC
22 October 2020
 

22 October 2020

Power Metal Resources plc ("Power Metal" or the "Company")

Canadian Silver Project - Diamond Drilling Contract Signed

Power Metal Resources plc (LON:POW) the AIM listed metals exploration and development company is pleased to announce the signing of the drilling contract for an initial 500m diamond core confirmatory drill programme to test the Victoria Vein at the Silver Peak Project (the "Silver Peak Project" or the "Project") in British Columbia, Canada. The Project includes the Eureka-Victoria Silver Mine, the first Crown-granted mineral property in British Columbia.

HIGHLIGHTS:

· Drilling contract signed with an experienced Canadian drilling company for an initial 500m diamond core programme.

 

· Contractor is expected to mobilise within the next few days with a view to commencing drilling next week.

 

· Initial programme will entail drilling from two pads with planned core intercepts to test the Victoria Vein where POW due diligence sampling returned bonanza silver (Ag) and significant copper (Cu) and lead (Pb) grades from two 0.5m long surface channel samples as announced 22 September 2020 and as follows:

 

- 0.50m @ 10,718 g/t Ag (345 troy oz/tonne), 2.14 % Cu & 2.99 % Pb, and;

 

- 0.50m @ 14,937 g/t Ag (480 troy oz/tonne), 3.05 % Cu & 11.95 % Pb).

 

· Core drilling will employ a NQ size drilling bit, for a 48mm diameter core sample, with a winter capable track mounted rig operated on a double 12 hour shift basis.

 

· Drilling oversight, core logging and sampling will be conducted by an experienced independent geologist, with half core samples sent to an accredited independent laboratory for analysis.

 

· Programme is expected to be completed within a two week window prior to the onset of winter conditions. The rig will be supported by a bulldozer on site.

CHIEF EXECUTIVE OFFICER'S STATEMENT

Paul Johnson Chief Executive Officer of Power Metal Resources plc commented

"I am very pleased to report the signing of the drilling contract for an initial diamond core programme at Silver Peak, where the recently announced channel sampling returned exceptionally high silver assays.

The team in-country are now focused on mobilisation and commencement of drilling and we are naturally eager to see the outcome of this programme, given the results we achieved from the sampling programme recently announced.

My thanks go to our partners in Canada who have worked incredibly hard to organise this programme and put us in a position to undertake this work prior to the weather window closing. The expeditious work undertaken has given us an opportunity to assess this unique high-grade silver project through drilling, far earlier than we initially thought possible."

FURTHER INFORMATION

Background

On 14 September 2020 the Company announced the exercise of an option agreement announced 17 August 2020 (the "Option Agreement") in respect of the Silver Peak Project, gaining the right to earn-in to a 30% interest in the Project.

Prior to option exercise the Company undertook a due diligence exploration programme including sampling at the Project to gather further information and to assist the Company in its assessment of project prospectivity and potential.

The assay results from the due diligence channel sampling were reported on the 22 September 2020 and are set out in Table 1 below:

Table 1: Summary of assay results for samples taken during Power Metal Due Diligence sampling on Victoria Vein, Silver Peak Project

ALS Global Analytical Method

Ag-GRA22

Ag-CON01

Cu-OG46

Pb-OG46

Sample ID

Channel Sample Length

(m)

Ag

(ppm)

Ag

(ppm)#

Cu

(%)*

Pb

(%)*

SP20-001

0.50

>10,000

10,718

2.14

2.99

SP20-002

0.50

6,010

1.71

2.87

SP20-003

0.50

7,530

1.57

2.07

SP20-004

0.60

5,540

1.38

SP20-005

0.70

7,880

1.94

3.16

SP20-006

0.50

>10,000

14,937

3.05

11.95

SP20-007

0.80

5,330

1.26

SP20-008

0.55

1,595

1.78

SP20-009

0.45

4,110

-

SP20-010

0.65

1,755

1.71

SP20-011

N/A Grab sample

660

-

* Cu and Pb results rounded to two decimal places.

# Two over limit silver samples were analysed >10,000 ppm Ag by method Ag-GRA22 were reanalysed using method Ag-CON01.

Project Overview

The Silver Peak Project consists of a portfolio of mineral claims (the "claims") over a system of high grade, intrusion related, polymetallic Ag-Pb-Zn-Cu veins, part of the historical Eureka-Victoria Silver Mine, at Silver Peak in southern British Columbia, Canada.

Earlier Due Diligence Exploration Programme

 

The due diligence work programme previously conducted by Power Metal included various elements including channel sampling at close intervals perpendicular to the existing known high-grade veins and grab samples from a main target area between the lower elevations and the Victoria Adit.

 

The work also included enhancement of road accessibility to the exploration area, and the collation of detailed photographic and video evidence of the project area for cross referencing to existing project technical information.

 

A portable X-ray fluorescence analyser ("pXRF") was utilised to provide in-field, geochemical analyses, in conjunction with confirmatory laboratory assay testing where appropriate.

 

The due diligence work programme cost totalled C$25,000 (£14,512) and the amount expended will be deducted from Power Metal's 12 month Project exploration spend commitment of C$250,000.

 

 

COMPETENT PERSON STATEMENT

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MIMMM, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Power Metal Resources PLC to provide technical support.

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No.596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

 

For further information please visit https://www.powermetalresources.com/ or contact:

Power Metal Resources plc

Paul Johnson (Chief Executive Officer)

+44 (0) 7766 465 617

SP Angel Corporate Finance (Nomad and Joint Broker)

Ewan Leggat/Charlie Bouverat

+44 (0) 20 3470 0470

SI Capital Limited (Joint Broker)

Nick Emerson

+44 (0) 1483 413 500

First Equity Limited (Joint Broker)

David Cockbill/Jason Robertson

+44 (0) 20 7330 1883

 

 

Notes to Editors:

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration and development company seeking a large scale metal discovery.

The Company has a global portfolio of project interests including precious metal exploration in North America and Australia together with base metal exploration in Africa. Project interests range from early stage greenfield exploration to later stage drill ready prospects.

The Board and its team of advisors have expertise in project generation, exploration and development and have identified an opportunity to utilise the Company's position to become a leader in the London market for investors wishing to gain exposure to proactive global metals exploration.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCUUAWRRUURURA
Date   Source Headline
8th Sep 20257:00 amRNSFermi Exploration: Summer 2025 Exploration Update
4th Sep 202512:35 pmRNS-RInterview with Power Metal and Minestarters
4th Sep 20257:00 amRNSProposed Investment in Minestarters
19th Aug 20257:00 amRNSDisposal of Remaining Holding in GMET
13th Aug 20254:43 pmRNSHolding(s) in Company
29th Jul 20257:10 amRNSFirst Development Resources First Day of Dealings
25th Jul 20252:02 pmRNSResults of Annual General Meeting
11th Jul 202512:10 pmRNSFirst Development Resources - IPO Update
30th Jun 20257:00 amRNSResults for the Period Ended 31 December 2024
23rd Jun 20257:00 amRNSBlock 8 Oman: Exploration Update - 7.8% Cu Sample
18th Jun 20257:00 amRNSUranium Joint Venture: Badger Lake Update
16th Jun 20257:00 amRNSBinding agreement with AMAK
11th Jun 20257:00 amRNSExploration Update on the Perch River Property
20th May 20254:58 pmRNSHolding(s) in Company
14th May 202511:11 amRNSDirector Dealings
1st May 202510:00 amRNSHolding(s) in Company
17th Apr 20257:00 amRNSBlock 8: Initial Ground Gravimetric Survey Results
31st Mar 20257:00 amRNSUranium JV: Drake Lake-Silas Property Update
27th Mar 20257:00 amRNSSilver Peak Project Interest Disposal
21st Mar 202510:38 amRNSHolding(s) in Company
21st Mar 20257:00 amRNSUranium JV: Reitenbach Exploration Update
18th Mar 20257:13 amRNSHaneti Project Review
10th Mar 20257:00 amRNSLetter of Intent with Al Masane Al Kobra Mining
21st Feb 20255:37 pmRNSHolding(s) in Company
20th Feb 202512:41 pmRNSPartial Disposal of GMET Holding
18th Feb 20257:00 amRNSAcquisition of the Fortin River Project
14th Feb 20257:00 amRNSUranium JV: Tait Hill Exploration Update
11th Feb 20257:00 amRNSPartial Disposal of GMET Holding
31st Jan 20257:00 amRNSTotal Voting Rights
30th Jan 20257:00 amRNSBlock 8 Oman: Exploration Update
13th Jan 20257:00 amRNSHolding(s) in Company
30th Dec 20247:00 amRNSInterim Results
24th Dec 20247:00 amRNSGSAe Agreement Update and Issue of Equity
11th Dec 20247:00 amRNSUpdate on RRR Agreement
11th Dec 20247:00 amRNSFermi Exploration: Acquisition of Pardoe
9th Dec 20241:58 pmRNSLetter of Intent signed with AMAK Update
2nd Dec 20247:00 amRNSUranium JV Renamed & Exploration Update
21st Nov 20247:00 amRNSTechnical Overview of Drake Lake–Silas Project
15th Nov 202412:45 pmRNSDirector Dealing
14th Nov 20242:54 pmRNSGrant of Director, Management and Staff Options
14th Nov 20247:00 amRNSPerch River – Significant Uranium Target Outlined
13th Nov 20247:00 amRNSUranium-Focused Joint Venture – Exploration Update
31st Oct 20244:30 pmRNSTotal Voting Rights
25th Oct 20247:00 amRNSAgreement with Alara Resources & Awtad Copper
24th Oct 20244:07 pmRNSTR-1: Notification of major holdings
8th Oct 20242:53 pmRNSAgreement with Alara Resources & Awtad Copper
7th Oct 20247:00 amRNSSuccessful Completion of Uranium-Focused JV
2nd Oct 20242:43 pmRNSChange of accounting reference date
30th Sep 20247:00 amRNSUpdate on Formation of Uranium-Focused JV
16th Sep 20247:00 amRNSUpdate on Proposed Formation of Uranium-Focused JV

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.