We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOLY.L Regulatory News (POLY)

  • There is currently no data for POLY

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Polymetal International plc: Feasibility Study results and construction approval for POX-2

11 Feb 2019 07:00

Polymetal International plc (POLY) Polymetal International plc: Feasibility Study results and construction approval for POX-2 11-Feb-2019 / 10:00 MSK Dissemination of a Regulatory Announcement that contains inside information according to REGULATION (EU) No 596/2014 (MAR), transmitted by EQS Group. The issuer is solely responsible for the content of this announcement.


Release time

IMMEDIATE LSE, MOEX: POLY / ADR: AUCOY

Date

11 February 2019

 

 

Polymetal International plc

Feasibility Study results and construction approval for POX-2

The Board of Polymetal International plc approved the POX-2 project on the basis of the recently completed Feasibility Study (FS) and authorised the immediate start of construction.

"POX-2 leverages our core technical capabilities and creates substantial value. It also fully de-risks our business model by eliminating dependence on concentrate off-take markets", said Vitaly Nesis, Group CEO of Polymetal. "Emerging trends in the global gold mining industry make POX-2 a crucial element of the Company's long-term strategy".

STRATEGIC RATIONALE

The second POX line will meaningfully increase the value of Polymetal's refractory reserve base, comprising approximately 55% of total ore reserves. The facility will process concentrates from Polymetal's mines at Kyzyl, Nezhda, Mayskoye, and Voro. POX-2 is expected to generate significant economic benefits as all refractory concentrates will be retained for in-house processing as opposed to selling to third-party off-takers. The project will result in the incremental production of approximately 30-35 Koz of gold per year from the same amount of feedstock and will, on average, lower TCC by US$ 100-150/oz per ounce for 500 Koz of annual gold production. POX-2 will ensure strategic security of downstream processing against the backdrop of tightening environmental regulations in China, currently the main market for refractory gold concentrates. The project will allow Polymetal to create capacity for treatment of third-party refractory concentrates, a market which has grown considerably in Russia and globally in recent years. POX-2 will further our sustainable development strategy. The environmental footprint of the Company's value chain will shrink drastically on the back of substantial reductions in air pollution, water usage, and solid toxic waste.

FS HIGHLIGHTS

The project's base case IRR is 14% with an NPV of US$ 112 million, based on the following assumptions: 10% discount rate US$ 1,200/oz gold price 65 RUB/USD exchange rate A total of 4.3 Mt of concentrate containing 9.3 Moz of gold processed from Kyzyl, Nezhda, Mayskoye, and Voro over a period of 23 years Pre-production capital expenditures are estimated at US$ 431 million and will be entirely funded out of Company's operating cash flows. The plant's design throughput capacity is 250-300 Ktpa of concentrate, depending on the levels of sulphur content. Maximum sulfide sulfur processing capacity is 48 Ktpa. This will complement the 200 Ktpa of concentrate and 30 Ktpa of sulfur capacity of the existing Amursk POX facility. The facility will utilise titanium-lined steel autoclave operating at 240 ˚С and the pressure of 43 bar. Hatch Inc. (Toronto, Canada) is responsible for the basic engineering, detailed engineering, POX procurement support and the supply of custom-made equipment for high-pressure and acidic processing areas. Polymetal Engineering is responsible for other processing areas, general site layout, and infrastructure. Polymetal project team will include more than 30 professionals who actively participated in the successful execution of the original POX (2013) and POX debottlenecking (2018) projects.

 

PROJECT DEVELOPMENT TIMELINE

Polymetal envisages the following conceptual development timeline for the POX-2 Project:

Start of detailed engineering and construction Q2 2019 Receipt of all permits Q1 2020 Delivery of the autoclave on-site Q3 2020 Completion of civil construction works Q3 2021 Completion of main equipment installation Q1 2022 Completion of external infrastructure Q3 2022 Mechanical completion and start of commissioning activities Q4 2022 End of commissioning and first production Q3 2023 Full ramp-up by end of Q4 2023

PROCESSING

The POX-2 site is immediately adjacent to the current Amursk POX facility within the city of Amursk and will share some of the external infrastructure (gas main, access road, water main) with the existing POX facility. Additional electricity supply will be provided via a new dedicated power line from the regional 110Kw grid.

The project will include a new hydrometallurgical area (POX proper), CIL and intensive cyanidation areas, an oxygen plant, an upgrade to the existing dry tailings facility, reverse osmosis water treatment facility, and several smaller infrastructural facilities (warehouses, maintenance areas, etc.).

POX-2 is designed for processing double refractory concentrates, which contain micron gold particles encapsulated in sulfides (pyrites and arsenic pyrites) together with high concentrations of organic carbon. High carbon content drives high sorption activity (preg-robbing) and dictates the use of high-temperature (240˚С) pressure oxidation compared with medium-temperature (200˚С) oxidation utilized at the existing Amursk POX facility.

Pressure oxidation (POX) was selected as the most feasible processing technology for double refractory ores. It is able to achieve gold recoveries of 96% by utilizing high temperatures, elevated pressure and oxygen to recover encapsulated gold, while conventional cyanidation methods would result in sub-optimal recovery rates of 20-40%. Completed metallurgical tests on Kyzyl and Mayskoye high-carbon concentrates confirm the recovery rate of 96%.

The total design capacity of the POX-2 plant will be 250-300 Kt of concentrate per annum. The design of the new POX facility enables the Company to process feed with different properties without impacting any of the design parameters.

CAPITAL EXPENDITURE

Total capital costs for the construction of the POX-2 project in 2019-2023 are estimated at US$ 431 million, and will be funded out of Company's operating cash flows.

Category

Capital Cost,

US$ million

 

 

Engineering

31

Processing plant equipment

149

Construction

138

Infrastructure

56

Owner's team

9

Contingency

48

Initial Capital Costs

431

In 2017-2018, Polymetal spent approximately US$ 26 million on POX-2, of which US$ 12 million was for engineering activities and feasibility study and US$ 14 million dedicated to pre-manufacturing engineering with equipment suppliers.

SUSTAINABLE DEVELOPMENT

The FS incorporates several important design features that will minimise its environmental impact and mitigate related risks:

Tailings from the plant will be in the form of dry cake. No impoundments or dam structures will be required. The project will have zero water discharge off-site. Process water will be fully recycled. The project will have minimal carbon dioxide discharge and no sulfur or arsenic oxides discharge.

The Project will boost social investments as Polymetal plans to invest approximately US$ 6 million into more than 10 long-term projects most important to city residents, as well as our employees and their families. This will include the renovation and upgrade of educational, medical and sports facilities, as well as the enhancement of the Amursk city look and attractiveness. Polymetal also plans to build new apartment buildings that will house 100 families.

POX-2 will create more than 400 permanent jobs and generate approximately US$ 20 million per year in taxes for all levels of government.

Enquiries

Media   Investor Relations

FTI Consulting

Leonid Fink

Viktor Pomichal

+44 20 3727 1000

Polymetal

Eugenia Onuschenko

Timofey Kulakov

Michael Vasiliev

ir@polymetalinternational.com

+44 20 7016 9505 (UK)

 

+7 812 334 3666 (Russia)

Joint Corporate Brokers  

Morgan Stanley

Sam McLennan

Richard Brown

 

Panmure Gordon

James Stearns

Atholl Tweedie

+44 20 7425 8000

 

 

 

 

 

+44 20 7886 2500

RBC Europe Limited

Tristan Lovegrove

Marcus Jackson

+44 20 7653 4000

 

FORWARD-LOOKING STATEMENTS

THIS RELEASE MAY INCLUDE STATEMENTS THAT ARE, OR MAY BE DEEMED TO BE, "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS SPEAK ONLY AS AT THE DATE OF THIS RELEASE. THESE FORWARD-LOOKING STATEMENTS CAN BE IDENTIFIED BY THE USE OF FORWARD-LOOKING TERMINOLOGY, INCLUDING THE WORDS "TARGETS", "BELIEVES", "EXPECTS", "AIMS", "INTENDS", "WILL", "MAY", "ANTICIPATES", "WOULD", "COULD" OR "SHOULD" OR SIMILAR EXPRESSIONS OR, IN EACH CASE THEIR NEGATIVE OR OTHER VARIATIONS OR BY DISCUSSION OF STRATEGIES, PLANS, OBJECTIVES, GOALS, FUTURE EVENTS OR INTENTIONS. THESE FORWARD-LOOKING STATEMENTS ALL INCLUDE MATTERS THAT ARE NOT HISTORICAL FACTS. BY THEIR NATURE, SUCH FORWARD-LOOKING STATEMENTS INVOLVE KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER IMPORTANT FACTORS BEYOND THE COMPANY'S CONTROL THAT COULD CAUSE THE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH FORWARD-LOOKING STATEMENTS. SUCH FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS REGARDING THE COMPANY'S PRESENT AND FUTURE BUSINESS STRATEGIES AND THE ENVIRONMENT IN WHICH THE COMPANY WILL OPERATE IN THE FUTURE. FORWARD-LOOKING STATEMENTS ARE NOT GUARANTEES OF FUTURE PERFORMANCE. THERE ARE MANY FACTORS THAT COULD CAUSE THE COMPANY'S ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED IN SUCH FORWARD-LOOKING STATEMENTS. THE COMPANY EXPRESSLY DISCLAIMS ANY OBLIGATION OR UNDERTAKING TO DISSEMINATE ANY UPDATES OR REVISIONS TO ANY FORWARD-LOOKING STATEMENTS CONTAINED HEREIN TO REFLECT ANY CHANGE IN THE COMPANY'S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGE IN EVENTS, CONDITIONS OR CIRCUMSTANCES ON WHICH ANY SUCH STATEMENTS ARE BASED

 

 

 


ISIN:JE00B6T5S470
Category Code:MSCH
TIDM:POLY
Sequence No.:7427
EQS News ID:774197
 
End of AnnouncementEQS News Service

UK Regulatory announcement transmitted by DGAP - a service of EQS Group AG. The issuer is solely responsible for the content of this announcement.

Date   Source Headline
10th Aug 20237:00 amEQSPolymetal: Resumption of trading on AIX
1st Aug 20236:00 pmEQSPolymetal: Suspension of Trading on the London Stock Exchange
28th Jul 20231:00 pmEQSPolymetal: Results of GM
25th Jul 20232:00 pmEQSPolymetal: Results of AGM
24th Jul 20233:00 pmEQSPolymetal: Q2 2023 production results webcast
21st Jul 20237:00 amEQSPolymetal: Update to the timetable of the Re-domiciliation
10th Jul 20234:55 pmEQSPolymetal: Proposed cancellation of listing on the Official List and from trading on the London Stock Exchange and notice of General Meeting
10th Jul 202311:30 amEQSPolymetal: Acquisition of the controlling stake in the Baksy property in Kazakhstan
10th Jul 20237:00 amEQSPolymetal: Clarification to the expected timetable of the Re-domiciliation
30th Jun 20233:00 pmEQSPolymetal: Report on payments to governments for the year 2022
29th Jun 20237:05 amEQSPolymetal: Update to the timetable of the Re-domiciliation
29th Jun 20237:00 amEQSPolymetal: Notice of 2023 AGM
19th Jun 20233:30 pmEQSPolymetal: Board changes
16th Jun 20237:01 amEQSPolymetal: Further Extension to Exchange Offer Timetable
5th Jun 20237:00 amEQSPolymetal: Update on the Company’s Russian-registered subsidiary, JSC Polymetal
30th May 20231:30 pmEQSPolymetal: Results of GM
26th May 20234:21 pmEQSPolymetal: Resignation of Bank of New York Mellon as depository bank for American Depositary Receipt programme
22nd May 20237:00 amEQSPolymetal: Update on the Russian-registered JSC Polymetal
18th May 20235:00 pmEQSPolymetal: General Meeting Voting Arrangements
16th May 20237:01 amEQSPolymetal: Circulation of General Meeting Materials
10th May 20237:01 amEQSPolymetal: Q1 2023 production results
10th May 20237:00 amEQSPolymetal: Proposed re-domiciliation to the AIFC (Кazakhstan) and notice of General Meeting
3rd May 20237:00 amEQSPolymetal: Analyst and Investor Briefing
23rd Mar 20237:00 amEQSPolymetal International plc: Integrated Annual Report 2022
16th Mar 20237:01 amEQSPolymetal: Preliminary results for the year ended 31 December 2022
16th Mar 20237:00 amEQSPolymetal: Board Committee Changes
1st Mar 20237:01 amEQSPolymetal: Ore Reserves, Mineral Resources and Exploration update as at 1 January 2023
10th Feb 20238:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
10th Feb 20237:00 amEQSPolymetal: Statement in relation to trading of shares on the London Stock Exchange
27th Jan 20234:40 pmRNSSecond Price Monitoring Extn
27th Jan 20234:35 pmRNSPrice Monitoring Extension
25th Jan 20238:00 amEQSPolymetal: Q4 and FY 2022 production results
25th Jan 20237:00 amEQSPolymetal: Q4 and FY 2022 production results
17th Jan 20238:00 amEQSPolymetal: Analyst and Investor Day
17th Jan 20237:00 amEQSPolymetal: Analyst and Investor Day
11th Jan 20234:35 pmRNSPrice Monitoring Extension
30th Dec 20228:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
30th Dec 20227:00 amEQSPolymetal: Total Voting Rights as at 30 December 2022
12th Dec 20228:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
12th Dec 20227:00 amEQSPolymetal: Results of the first tranche of the Exchange Offer
8th Dec 20228:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
8th Dec 20227:00 amEQSPolymetal: Extension to the settlement period in connection with the Exchange Offer
1st Dec 20228:00 amEQSPolymetal: Board Changes
1st Dec 20227:00 amEQSPolymetal: Board Changes
10th Nov 20228:00 amEQSPolymetal: Board Committee Changes
10th Nov 20227:00 amEQSPolymetal: Board Committee Changes
2nd Nov 20228:00 amEQSPolymetal: Q3 2022 production results
2nd Nov 20227:00 amEQSPolymetal: Q3 2022 production results
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM
12th Oct 20225:30 pmEQSPolymetal: Submission of resolutions to NSM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.