Roundtable Discussion; The Future of Mineral Sands. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPOLY.L Regulatory News (POLY)

  • There is currently no data for POLY

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Mineral resource estimate for the Viksha project

19 Sep 2016 07:00

RNS Number : 1619K
Polymetal International PLC
19 September 2016
 

 

 

Release time

 

IMMEDIATE

Date

19 September 2016

 

 

Polymetal International plc

Licence renewal and mineral resource estimate for the Viksha project

 

Polymetal International plc (LSE, MOEX: POLY, ADR: AUCOY) (together with its subsidiaries - "Polymetal", the "Company", or the "Group") is pleased to announce the maiden Mineral Resource estimate audited by AMC Consultants Pty Ltd ("AMC Consultants") for the 100%-owned Viksha project.

HIGHLIGHTS

· The Viksha is a palladium, platinum, gold and copper deposit located in the Republic of Karelia, part of the Russian Federation, which is approximately 90 km north of the regional capital Petrozavodsk (population 300,000) and approximately 450 km from St. Petersburg. The infrastructure in the area is well developed with easy access to grid power, paved roads, and railway. Polymetal's 100%-owned subsidiary holds a 20-year mining licence for a project area of 47 km2.

· Polymetal acquired the property when it had a prospecting licence in 2012. A total of 166 diamond drill holes totalling 22,145 meters, were completed between 2012 and 2014. Application for a mining licence was filed in Q3 2015 and granted on July 18, 2016.

· The Mineral Resources estimate was independently audited by AMC Consultants in accordance with the JORC Code (2012) and comprises 213 Mt of Indicated and Inferred Resources averaging 0.98 g/t of combined precious metals and 0.1% of copper. Total content of precious metals is estimated at 6.6 Moz making Viksha one of the largest open-pittable PGM resources in the world. Resources have been constrained by generating a series of optimum pit shells. The pit depths vary from 240 m to 305 m below surface.

· Polymetal intends to complete a feasibility study ("FS") for an Ore Reserve estimate for Viksha by Q3 2019. Provided the development decision based on the FS is positive, the asset could enter production in 2022.

"Viksha successfully delivered our maiden PGM resource", said Vitaly Nesis, Group CEO of Polymetal. "I believe that the project's size, combined with the absence of significant technical challenges, makes it a unique investment opportunity within the global PGM space".

MINERAL RESOURCE STATEMENT

The Mineral Resource statement for Viksha has been audited and reported by AMC Consultants - an independent consultant - in accordance with the JORC Code (2012) as presented below.

Viksha project open-pittable Mineral Resources as of 1 March 2015

Tonnes

Grade

Content

Mt

Pd, g/t

Pt, g/t

Au, g/t

Cu, %

Pd, Moz

Pt, Moz

Au, Moz

Cu, Kt

Viksha

Indicated

27

0.6

0.2

0.1

0.1

0.5

0.1

0.1

29.6

Inferred

52

0.6

0.2

0.1

0.09

1.0

0.3

0.2

49.5

Kenti

Inferred

98

0.6

0.2

0.1

0.11

1.9

0.6

0.4

109.6

Shargi

Inferred

36

0.6

0.2

0.1

0.08

0.7

0.2

0.1

31.7

Total

Indicated+Inferred

213

0.6

0.2

0.1

0.10

4.2

1.4

0.9

220.6

Notes:

1) A cut-off grade of 0.5 g/t palladium equivalent has been applied. The palladium equivalence formula is based on assumed metal prices and overall recoveries. The PdEq formula is: PdEq = Pd(g/t) + Pt(g/t) * 1.57 + Au(g/t) * 1.61 + Cu(%) * 2.33. The conversion factor shown in the formula for each metal represents the conversion from each metal to palladium on a recovered value basis. The assumed prices in the equivalence equation are 750 US$/oz Pd, 1,180 US$/oz Pt, 1,200 US$/oz Au, and 5,700 US$/t Cu. The assumed flotation recoveries used in the PdEq formula are 76.4% Pd, 71.5% Pt, 74.5% Au, and 78.3% Cu. The assumed refinery payables are: 90% Pd, 90% Pt, 94% Au, and 100% Cu

2) Due to the effects of rounding the sum of individual values will not necessarily equal the total

GEOLOGY

The property lies near the centre of the southern Karelian Craton which is situated within the Archaean granite-greenstone terrain, adjacent to the lower Proterozoic Onega trough.

The ore-bearing gabbro associated with the Koikar sill and host-rock dolerites uniformly occur among the terrigene-carbonate formations. The rock sequence has been incorporated in the synclinal fold. The syncline has an asymmetric structure with gently sloping north-west (15-25°) limb and subvertical south-east limb. The syncline extends for 6.5 km north-south and 1.5 km east-west.

The Viksha deposit comprises three adjacent areas within the north-west limb of the syncline structure: Viksha proper, Kenti, and Shargi. All of them contain platinum, palladium, gold ("Platinum group metals" or "PGM") and copper mineralisation within the Koikar sill gabbro-dolerites. The outcrop of reef-type mineralisation has been traced for over 20 km.

Viksha mineralisation is localized within the stratified sill rocks at the boundary between the lower gabbro and the upper dolerite zones. The sill has a maximum thickness of approximately 235 m. The underlying dolomite sediments are 40-50 m thick. Mineralised zones are clearly stratified with gold and copper predominance in the upper part, and palladium in the lower part of the mineralisation. The platinum-palladium-gold-enriched layer lies approximately 45 m above the sediments. The reef thickness is 5-11m.

MINERALOGY

Mineralisation at the Viksha project is associated with titanium-magnetite, chalcopyrite, and bornite. The most abundant species are Pt arsenide and Pd tellurides. The PGM grain size is 5-9 μm; most PGM are locked or exposed/attached to Cu sulphides, Fe oxides/spinel/ilmenite, and silicate minerals. In contrast, the gold minerals, consisting dominantly of gold-bearing silver and electrum are coarser-grained.

INVESTMENT THESIS

Polymetal believes that the newly established mineral resource of more than 6 Moz of precious metals offers a good probability that a standalone mining operation is both feasible technically and financially viable. Importantly, the geological and metallurgical conditions are favorable:

· The near-surface "reef" shaped mineralisation with contiguous ore bodies of considerable width is amenable to low-cost mechanised bulk open-pit mining. The shallow dip of mineralised zones enables selection of the acceptably low stripping ratios.

· The deposit is located in a well-developed region with excellent infrastructure and plentiful qualified workforce. The property has no population and is covered by forest with no agricultural activity.

· Favourable mineralogy (without nickel) enables conventional flotation process producing bulk copper-PGM sulfide concentrate that can be processed through either PGM refineries or copper smelters with PGM circuit.

COMPETENT Persons

The AMC Consultants review was completed by Mr Ivor Jones - Associate Consultant.

The information in this release that relates to the Mineral Resources is based on, and fairly represents, information, which has been compiled by Mr Ivor Jones who is a Fellow and Chartered Professional (Geology) of the Australasian Institute of Mining and Metallurgy. Mr Jones has sufficient experience relevant to the styles of mineralisation and type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent Person, as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Jones is a full time employee of Denny Jones Pty Ltd contracted as an associate of AMC Consultants Pty Ltd and has consented to the inclusion of the matters in this report based on his information in the form and context in which it appears.

Enquiries

Media Investor Relations

FTI Consulting

Leonid Fink

Jenny Payne

+44 20 3727 1000

Polymetal

Maxim Nazimok

Evgenia Onuschenko

Maryana Nesis

ir@polymetalinternational.com

 

+7 812 313 5964 (Russia)

+44 20 7016 9503 (UK)

Joint Corporate Brokers 

Morgan Stanley

Sam McLennan

Richard Brown

+44 20 7425 8000

RBC Europe Limited

Tristan Lovegrove

Marcus Jackson

 

+44 20 7653 4000

 

FORWARD-LOOKING STATEMENTS

THIS RELEASE MAY INCLUDE STATEMENTS THAT ARE, OR MAY BE DEEMED TO BE, "FORWARD-LOOKING STATEMENTS". THESE FORWARD-LOOKING STATEMENTS SPEAK ONLY AS AT THE DATE OF THIS RELEASE. THESE FORWARD-LOOKING STATEMENTS CAN BE IDENTIFIED BY THE USE OF FORWARD-LOOKING TERMINOLOGY, INCLUDING THE WORDS "TARGETS", "BELIEVES", "EXPECTS", "AIMS", "INTENDS", "WILL", "MAY", "ANTICIPATES", "WOULD", "COULD" OR "SHOULD" OR SIMILAR EXPRESSIONS OR, IN EACH CASE THEIR NEGATIVE OR OTHER VARIATIONS OR BY DISCUSSION OF STRATEGIES, PLANS, OBJECTIVES, GOALS, FUTURE EVENTS OR INTENTIONS. THESE FORWARD-LOOKING STATEMENTS ALL INCLUDE MATTERS THAT ARE NOT HISTORICAL FACTS. BY THEIR NATURE, SUCH FORWARD-LOOKING STATEMENTS INVOLVE KNOWN AND UNKNOWN RISKS, UNCERTAINTIES AND OTHER IMPORTANT FACTORS BEYOND THE COMPANY'S CONTROL THAT COULD CAUSE THE ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS OF THE COMPANY TO BE MATERIALLY DIFFERENT FROM FUTURE RESULTS, PERFORMANCE OR ACHIEVEMENTS EXPRESSED OR IMPLIED BY SUCH FORWARD-LOOKING STATEMENTS. SUCH FORWARD-LOOKING STATEMENTS ARE BASED ON NUMEROUS ASSUMPTIONS REGARDING THE COMPANY'S PRESENT AND FUTURE BUSINESS STRATEGIES AND THE ENVIRONMENT IN WHICH THE COMPANY WILL OPERATE IN THE FUTURE. FORWARD-LOOKING STATEMENTS ARE NOT GUARANTEES OF FUTURE PERFORMANCE. THERE ARE MANY FACTORS THAT COULD CAUSE THE COMPANY'S ACTUAL RESULTS, PERFORMANCE OR ACHIEVEMENTS TO DIFFER MATERIALLY FROM THOSE EXPRESSED IN SUCH FORWARD-LOOKING STATEMENTS. THE COMPANY EXPRESSLY DISCLAIMS ANY OBLIGATION OR UNDERTAKING TO DISSEMINATE ANY UPDATES OR REVISIONS TO ANY FORWARD-LOOKING STATEMENTS CONTAINED HEREIN TO REFLECT ANY CHANGE IN THE COMPANY'S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGE IN EVENTS, CONDITIONS OR CIRCUMSTANCES ON WHICH ANY SUCH STATEMENTS ARE BASED.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLEKLBFQKFXBBQ
Date   Source Headline
19th Apr 20177:00 amRNSQ1 2017 Production Results
31st Mar 20177:00 amRNSTotal Voting Rights
29th Mar 20177:00 amRNSAnnual and Sustainability Reports, Notice of AGM
21st Mar 20177:35 amRNSTransaction on Nezhda announced by Polyus
16th Mar 20172:17 pmRNSDirector/PDMR Shareholding
15th Mar 20177:13 amRNSAppointment of Corporate Broking Advisor
15th Mar 20177:08 amRNSFinal dividend and approval of revised policy
15th Mar 20177:01 amRNSPreliminary results for the FY2016
14th Mar 20177:02 amRNSReserve and Resource update as at 1 January 2017
1st Mar 20177:09 amRNSPayment of deferred consideration for Primorskoye
31st Jan 20177:10 amRNSTotal Voting Rights
31st Jan 20177:00 amRNSPolymetal increases interest in Tarutin to 100%
26th Jan 20177:00 amRNSQ4 and full year 2016 production results
23rd Jan 20177:00 amRNSChanges in the executive management team
19th Jan 20177:00 amRNSPolymetal acquires interest in Prognoz property
30th Dec 20167:00 amRNSTotal Voting Rights
23rd Dec 20169:44 amRNSTR-1: Notification of major interest in shares
20th Dec 20162:23 pmRNSExchange rate for dividend payment
19th Dec 20167:00 amRNSEuromoney Global Gold Index inclusion
13th Dec 20167:30 amRNSTR-1: Notification of major interest in shares
8th Dec 20167:00 amRNSSpecial dividend of US$0.15 per share
5th Dec 20163:05 pmRNSPolymetal acquires controlling interest in Saum
2nd Dec 20168:38 amRNSDirector/PDMR Shareholding
28th Oct 20169:41 amRNSTR-1: Notification of major interest in shares
24th Oct 20167:00 amRNSSTOXX Global ESG Leaders Index inclusion
18th Oct 20167:00 amRNSQ3 2016 production results
14th Oct 20161:36 pmRNSDirector/PDMR Shareholding
29th Sep 20164:04 pmRNSTR-1: Notification of major interest in shares
28th Sep 20162:26 pmRNSTR-1: Notification of major interest in shares
28th Sep 20162:26 pmRNSTR-1: Notification of major interest in shares
23rd Sep 20168:57 amRNSHolding(s) in Company
19th Sep 20167:00 amRNSMineral resource estimate for the Viksha project
8th Sep 20169:57 amRNSExchange rate for dividend payment
31st Aug 20168:57 amRNSTotal Voting Rights
30th Aug 20165:02 pmRNSIssuance of new shares
30th Aug 20167:01 amRNSFirst production at Svetloye ahead of schedule
25th Aug 20164:06 pmRNSTR-1: Notification of major interest in shares
24th Aug 20167:04 amRNSDividend declaration of US$0.09 per share
24th Aug 20167:00 amRNSReport for the six months ended 30 June 2016
23rd Aug 20168:00 amRNSTR-1: Notification of major interest in shares
22nd Aug 20167:00 amRNSBoard approves expansion at the Amursk POX plant
18th Aug 20167:00 amRNSPolymetal increases its interest in Tarutin to 75%
2nd Aug 20167:00 amRNSCompletion of the acquisition of the Komarovskoye
19th Jul 20167:20 amRNSQ2 2016 production results
28th Jun 20167:00 amRNSReport on payments to governments FY2015
20th Jun 20161:53 pmRNSDirector/PDMR Shareholding
10th Jun 20167:00 amRNSCommitment to the Cyanide Management Code
19th May 201612:33 pmRNSHolding(s) in Company
18th May 20167:00 amRNSNew investor presentation and production guidance
17th May 20161:23 pmRNSResult of AGM

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.