If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

Share Price is delayed by 15 minutes
Get Live Data
0.205    0.00 (0.00%)
Bid:
0.20
Ask:
0.21
Spread: 0.01 (5.00%)
Market Cap: £10.50m
PHE Live PriceLast checked at - London Stock Exchange

Intraday Powerhouse Ener Share Chart

Update on PHE G3-UHt Construction & Commissioning

15 Sep 2015 07:00

RNS Number : 0203Z
Powerhouse Energy Group PLC
15 September 2015
 

15 September 2015

 

PowerHouse Energy Group plc

("PowerHouse" or the "Company")

Update on PHE G3-UHt Construction and Commissioning

 

 

PowerHouse announces that the construction and commissioning of the newly developed PHE G3-UHt Waste-to-Energy system is nearing completion.

 

The commissioning and integration work is continuing apace at the Company's Brisbane engineering facility in Australia. All individual components have passed their initial evaluations at nominal operating temperatures and are operating to specification. However, our engineering team has determined that a minor modification to the de-oxygenation system (the system which removes excess oxygen and ambient air during the feed-stock conveyor process) will dramatically improve our ability to tune the resultant synthesis gas. In other words, this modification will better allow us to determine relative volumes of Hydrogen and Carbon Monoxide produced in the syngas creation process. The ability to increase or decrease the relative amount of Hydrogen can have a significant effect on the potential integration of a Hydrogen Fuel Cell into the G3 System.

 

The new de-oxygenation process has been designed, modelled, and the engineering has been completed. The newly machined parts are on order and are expected to arrive within the next few weeks.

 

Our initial electrical generation trials will commence with a standard reciprocal generation set and will begin upon completion of the new de-oxygenation component to the feed-stock conveyance system. In addition to operating these trials on standard plastic feed-stock, PHE has contracted to begin trialling the ultrahigh temperature gasification of shredded tyres. We will also be testing other difficult to eliminate feed-stocks such as ASR (auto shredder residue) which continues to present challenges to the auto dismantling industry and contribute to the toxic waste streams of the world. By demonstrating our ability to adequately deal with this pernicious waste component, we will become the most ecologically friendly mechanism by which to extract the energy value from ASR and contribute to a cleaner planet.

 

Additionally, official invitations for the first week of November 2015 have begun to be sent out to interested commercial parties and European government representatives to witness the demonstration of the new PowerHouse G3-UHt Technology.

 

A variety of environmental and government safety certifications, as well as the protection of new intellectual property which has been developed, will begin to be applied as testing and trialling the system continues.

 

"This marks the beginning of the actual commercial phase of the company," stated Keith Allaun, Executive Chairman of PowerHouse. "We finally have a technology in which we can be confident, which is proving to be commercially robust, and which delivers on the promise of PowerHouse. With this new demonstration unit, we are confident that we can begin making tremendous commercial strides in this next stage of the company."

 

For additional information please contact:

 

PowerHouse Energy Group plc

Keith Allaun +1 352 226 8644/+44 7887 588 941

 

Allenby Capital Limited (Nominated Adviser and Broker)

Nick Harriss/David Hart +44 (0) 20 3328 5656

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKNLFFASEFF
Date   Source Headline
12th Aug 20197:00 amPRNCollaboration Contract
25th Jul 201911:48 amPRNDirector's Dealing
10th Jul 20199:15 amRNSEndorsement from Japanese Ministry of Economy
5th Jul 20199:03 amRNSDMG® ready to solve exported plastic waste crisis
28th Jun 20194:15 pmPRNIssue of Equity and Director/PDMR Shareholding
27th Jun 20197:00 amRNSFinal Results
11th Jun 20197:00 amRNSDMG® ready to solve exported plastic waste crisis
9th May 20197:00 amPRNDeveloper W2T Sign Power Agreement
17th Apr 20197:00 amPRNFirst Revenue Contract for PowerHouse Energy
10th Apr 20197:00 amPRNLease agreed for hydrogen development site
9th Apr 201911:35 amPRNAmendment: Issue of Equity & Director/PDMR Shareholding
27th Mar 20197:00 amPRNIssue of Equity and Director/PDMR Shareholding
15th Feb 20197:00 amPRNOperational Update
1st Feb 20197:00 amPRNChange of Directorate
31st Dec 201811:37 amRNSAmended:Waste2Tricity Report in The Sunday Express
31st Dec 20187:38 amPRNWaste2Tricity Report in The Sunday Examiner
18th Dec 20185:44 pmPRNHolding in Company
3rd Dec 20187:00 amPRNPlacing and Issue of Equity
26th Nov 201811:05 amRNSSecond Price Monitoring Extn
26th Nov 201811:00 amRNSPrice Monitoring Extension
26th Nov 20187:00 amPRNDiscussions with Toyota Tsusho Corporation
20th Nov 20187:30 amRNSAlign Research Updates Coverage on PowerHouse
18th Oct 20189:10 amPRNOperational Update
18th Oct 20187:00 amPRNDirector/PDMR Shareholding
17th Oct 20182:36 pmPRNDirector/PDMR Shareholding and Issue of Equity
17th Oct 20187:00 amPRNSuccessful independent technology assessment by DNV GL
15th Oct 20184:20 pmPRNIssue of Equity
28th Sep 201810:06 amPRNInterim Results
19th Sep 20187:30 amRNSResponse to BBC Presentation
9th Aug 20187:00 amPRNDirector/PDMR Shareholding
8th Aug 201811:10 amPRNIssue of Equity
6th Aug 20187:00 amPRNHolding(s) in Company
3rd Aug 201811:40 amPRNShares in Issue
1st Aug 20182:05 pmRNSSecond Price Monitoring Extn
1st Aug 20182:00 pmRNSPrice Monitoring Extension
27th Jul 201812:39 pmPRNResult of AGM
27th Jul 201810:55 amPRNAGM Statement
6th Jul 201810:39 amPRNCorrection: Placing and Issue of Equity
6th Jul 20189:45 amPRNReplacement : Placing and Issue of Equity
6th Jul 20187:30 amPRNPlacing and Issue of Equity
4th Jul 20182:09 pmPRNNotice of AGM
2nd Jul 20182:49 pmPRNStatement re press comments
29th Jun 20189:45 amPRNAudited results for the year ended 31 December 2017
19th Jun 20187:00 amPRNPowerHouse connects to microgrid
11th Jun 20187:00 amRNSPowerHouse CEO on The Future of Plastic
8th Jun 20184:35 pmRNSPrice Monitoring Extension
6th Jun 20182:49 pmPRNClarification regarding Thornton Science Park
18th May 20187:00 amPRNIssue of Equity
26th Apr 20185:20 pmPRNHolding(s) in Company
23rd Apr 201812:37 pmPRNClarification - Equity Placings

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.