Listen to our latest Investing Matters Podcast episode 'Uncovering opportunities with investment trusts' with The AIC's Richard Stone here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPowerhouse Ener Regulatory News (PHE)

Share Price Information for Powerhouse Ener (PHE)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.475
Bid: 1.45
Ask: 1.50
Change: 0.00 (0.00%)
Spread: 0.05 (3.448%)
Open: 1.475
High: 1.50
Low: 1.475
Prev. Close: 1.475
PHE Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Siting of G3-UHt Demonstration Unit

24 Feb 2017 07:00

POWERHOUSE ENERGY GROUP PLC - Siting of G3-UHt Demonstration Unit

POWERHOUSE ENERGY GROUP PLC - Siting of G3-UHt Demonstration Unit

PR Newswire

London, February 23

24 February 2017

PowerHouse Energy Group plc(“PowerHouse”, or the “Company”)

Siting of G3-UHt Demonstration Unit

As previously announced, the Company’s G3-UHt Ultra-high temperature demonstration gasification system is en-route from Australia to the UK and is moving to its final transshipment point prior to its expected arrival in the UK in late March 2017.

PowerHouse is now pleased to announce it has agreed with University of Chester to deploy its G3-UHt unit at its Thornton Science Park, adjacent to the newly constructed Energy Centre of the University - a facility providing flexible space where industry and academia come together to innovate, develop, and demonstrate new, intelligent, energy technologies.

The Company has entered into a heads of terms with the University to take offices at Thornton Science Park to support the G3 Unit and to allow potential customer and partner evaluation of the G3 system.

Working with Waste2tricity, and Peel Environmental, PowerHouse is negotiating a commercial relationship with University of Chester, which would allow the Company to both demonstrate its technology, but to also connect to the facility’s “micro-grid” for the supplying of power to Thornton in situ.

As previously announced, PowerHouse has entered into an MOU to negotiate the establishment of its first commercial facility at the Protos Energy Facility which is adjacent to the Science Park.

The University’s new Faculty of Science and Engineering with circa 700 students, is located on Thornton Science Park alongside 30 commercial businesses from the energy, environmental, advanced manufacturing and automotive sectors. This enables academic and industrial collaboration in a mutually beneficial unique setting. It is anticipated that the G3 Unit will also become the focal point of gasification education at the facility and that University of Chester engineering students will be working alongside PowerHouse personnel in the operation and enhancement of the unit.

The University has been actively building its advanced engineering studies to include Process Engineering, Chemical Engineering, Computer Engineering, Materials Engineering, and Advanced Manufacturing studies - each of which may play a part in the advancement of PowerHouse technology as the company begins to commercialise the G3-UHt technology.

It is anticipated that an agreement with the University of Chester would enable the University to leverage the G3-UHt unit in its research operations, and educational efforts. Additionally, any electricity generated on-site will be fed into the Science Park micro-grid for the powering of the facility at no charge.

CEO of Thornton Science Park, Paul Vernon said: “This is a very important and exciting development for Thornton Science Park. We are delighted that PowerHouse are committed to becoming our first commercial tenant in the Energy Centre. It is a prime example of how the investment made to the Energy Centre is attracting new and innovative energy solutions to Thornton and Protos”

Keith Allaun, Executive Chairman of PowerHouse, said: “We couldn’t have envisaged a more ideal location for the siting of the G3-UHt, or a better relationship with University of Chester. Their commitment to advanced energy sciences, the enthusiasm of their welcome to their facility, and our intent to be the leader in Modular Distributed Gasification (MDG)© makes this feel like the right home for the demonstration unit. We believe that Protos will be one of the most highly visible advanced and alternative energy facility ecosystem in the world and we’re grateful to be in the conversation as a key contributor to this incredible partnership. We look forward to a long-standing, highly productive, relationship with University of Chester, Thornton, and Peel.”

For more information, contact:

PowerHouse Energy Group plc Keith Allaun, Executive ChairmanTel: +44 (0) 203 368 6399
WH Ireland Limited (Nominated Adviser) James Joyce / James BavisterTel: +44 (0) 207 220 1666
Turner Pope Investments Ltd (Joint Broker) Ben Turner / James PopeTel: +44 (0) 203 621 4120
Smaller Company Capital Limited (Joint Broker) Jeremy WoodgateTel: +44 (0) 203 651 2910
IFC Advisory (Financial PR & IR) Tim Metcalfe / Graham Herring / Heather Armstrong / Miles NolanTel: +44 (0) 203 053 8671

About PowerHouse Energy

PowerHouse is the holding company of the G3-UHt System Ultra High Temperature Gasification waste to energy systems.

The Company is focussed on technologies to enable energy recovery from municipal waste streams that would otherwise be directed to landfills and incinerators; or from renewable and alternative fuels such as biomass, tyres, and plastics to create syngas for power generation, high-quality hydrogen, or potentially reformed into liquid fuels for transportation. These waste to energy systems aim to provide the “best solution” to the on-site energy market.

PowerHouse is quoted on the London Stock Exchange's AIM Market. The Company is incorporated in the United Kingdom.

For more information see www.powerhouseenenergy.net

About the University of Chester’s Thornton Science Park

‘Bringing industry and academia together’

This high-tech site has 1.1M sq ft of space under roof and is equipped for innovative and growing businesses in the energy, environmental, automotive and advanced manufacturing sectors. Businesses have the opportunity to join a thriving community of companies, drawing on active support and collaboration with the University of Chester and the expertise and facilities of the Faculty of Science and Engineering located on site.

The ‘Energy Centre’ at Thornton seeks to promote growth and acceleration in the development and exploitation of technologies for the energy market. The development of the centre was funded from the Cheshire and Warrington Local Enterprise Partnership (CWLEP), who contributed £6.8m from the Local Growth Fund awarded as part of the LEP’s Growth Deal along with £8M invested from the University to create a facility for the “development, testing and demonstration of current and future energy technologies”.

For more information about the University of Chester: www.chester.ac.uk

Date   Source Headline
27th Jun 201110:54 amRNSFinal Results
6th Jun 20117:00 amRNSFurther re: Licence Discussions
16th May 20118:42 amRNSSchedule 1 update - Bidtimes plc
12th May 20119:46 amRNSFurther re: licence discussions
3rd May 20118:57 amRNSSch 1 update - Bidtimes plc
20th Apr 201112:53 pmRNSLicence Discussions
12th Apr 201111:14 amRNSSchedule 1 - Bidtimes plc
8th Apr 20112:25 pmRNSAmendment to Warrant exercise price
1st Apr 20117:30 amRNSProposed acquisition of PowerHouse Energy, Inc.
1st Apr 20117:30 amRNSRestoration - Bidtimes Plc
22nd Mar 20113:30 pmRNSSuspension - Bidtimes Plc
22nd Mar 20113:30 pmRNSStatement re. Suspension
30th Sep 20104:36 pmRNSHalf Yearly Report
27th Jul 201010:41 amRNSResult of AGM
12th Jul 20107:00 amRNSAdviser - change of name
21st Jun 20107:00 amRNSFinal Results
16th Feb 201010:55 amRNSChange of accounting reference date
1st Feb 201011:04 amRNSDirectorate Change
1st Feb 20107:00 amRNSChange of Adviser
16th Dec 20094:15 pmRNSInvesting Policy Update
21st Sep 200910:53 amRNSResult of AGM
28th Aug 200912:46 pmRNSAnnual Financial Report
28th Aug 20097:00 amRNSFinal Results
12th Mar 20097:00 amRNSExploration Activities Update
28th Nov 20087:00 amRNSInterim Results
23rd Jul 200811:38 amRNSDirector/PDMR Shareholding
22nd Jul 20083:54 pmRNSDirector/PDMR Shareholding
10th Jul 200811:51 amRNSHolding(s) in Company
1st Jul 20087:01 amRNSResult of AGM
1st Jul 20087:00 amRNSRestoration - Bidtimes plc
1st Jul 20087:00 amRNSResult of EGM
9th Jun 200812:11 pmRNSAnnual Report and Accounts
6th Jun 20081:10 pmRNSFinal Results
6th Jun 200812:59 pmRNSRevision of Investment Strate
23rd May 200810:28 amRNSChange of Adviser
13th May 20083:22 pmRNSHolding(s) in Company
10th Dec 20077:00 amRNSStatement re. Suspension
10th Dec 20077:00 amRNSSuspension - Bidtimes plc
27th Nov 20077:00 amPRNHalf-yearly Report
15th Oct 20074:26 pmPRNResult of AGM
19th Sep 200710:49 amPRNHolding(s) in Company
10th Sep 200712:38 pmPRNHolding(s) in Company
30th Aug 20077:01 amRNSAdrian Collins Chairman
29th Aug 20073:58 pmPRNFinal Results
10th Aug 20073:40 pmPRNAIM Rule 26
8th Aug 20073:34 pmPRNHolding(s) in Company
23rd Jul 20074:21 pmPRNDisposal
13th Jul 200712:52 pmPRNDirector Declaration
26th Jun 200712:57 pmPRNResult of EGM
25th May 20077:00 amPRNProposed sale of investment property

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.