Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPatagonia Gold Regulatory News (PGD)

  • There is currently no data for PGD

Progress Report

8 Apr 2009 07:00

RNS Number : 2977Q
Patagonia Gold PLC
08 April 2009
 



PATAGONIA GOLD PLC 

PROGRESS REPORTDRILLING AT CAP-OESTE GOLD-SILVER PROJECT

EXPLORATION ON EL TRANQUILO

Highlights:

Drilling on the main shoot of the Bonanza fault deposit at Cap-Oeste continues to intersect high grade gold and silver, including 7.0 metres @ 8.23grams per tonne (g/t) gold and 239 g/t silver in drill-hole CO-129.

A 4,000 metre drilling campaign has commenced on 6 highly prospective targets, identified by exploration, on the El Tranquilo Property block and within 6 kilometres of the Cap-Oeste gold-silver project.

Cap-Oeste Gold and Silver Project:

The initial drill programme on Cap-Oeste, completed in May 2008, established a Canadian National Instrument 43-101 compliant resource of 304,099 ounces of gold and 6,929,825 ounces of silver with just 11,328 metres of drilling.

Patagonia Gold PLC (PGD) commenced a second drilling campaign in October 2008 with the aim of substantially increasing the resource. To date 50 drill holes have been completed, for a further 11,000 metres, concentrating on the main shoot of the Bonanza fault.  Results are pending for 8 holes.

Results not previously reported include:

Hole No.

From

Interval

Grade

Grade

metres

metres

Au g/t

Ag g/t

CO-129-D

278.00

15.80

5.22

126

including

281.00

7.00

8.23

239

CO-130-D

258.00

14.10

3.58

60

including

268.00

3.00

5.38

23

CO-131-D

279.00

24.00

2.62

23

including

290.50

3.00

4.79

39

CO-132-D

280.40

32.70

2.86

45

including

305.85

3.80

5.66

22

Gold values indicate that the mineralization of the system remains persistent at depth.

Geologically, the high grade mineralization at Cap Oeste is a result of a weak secondary structure intersecting the south west dipping Bonanza fault defining the main shoot. The current drilling is approaching a depth where the interpreted intersection of the well defined north east dipping Esperanza fault will intersect the Bonanza fault. It is interpreted that this zone of increased structural intersection will have created a prospective zone of mineral precipitation.

Drilling will continue up to the onset of the southern winter, circa mid-May. On completion all data will be collated for a resource estimate update.

PGD has retained Micon of Toronto, Canada, to independently prepare a resource upgrade at Cap-Oeste, which complies with Canada National Instrument 43-101 (NI 43-101). The report is scheduled for completion in the third quarter of 2009.

Exploration of the Tranquilo property block

The El Tranquilo property block, 100% owned by PGD, covering over 40 square kilometres, contains the Cap-Oeste Gold and Silver Project as well as the Breccia Valentina and Vetas Norte structural trends

Patagonia Gold has three geological teams active in the exploration of the El Tranquilo property block.

Hi-definition Landsat imagery has enabled identification of trends sub parallel to the Bonanza fault. These structural trends, 1.5 and 4 kilometres respectively from the Cap-Oeste Bonanza fault have now been systematically mapped and rock chip sampled.

The Breccia Valentina and the Vetas Norte trends have been identified over a cumulative 10 kilometres of strike and contain the additional named prospects of Don Pancho, La Puma, Vetas Norte and Felix. Trenching has been completed on all of these prospects.

Don Pancho prospect is located in a flex in the Breccia Valentina corridor. Five trenches were excavated, covering 404 metres, based on the highly encouraging mapping and rock chip sampling which contained values up to 9.61 g/t gold and 572 g/t silver. Sample results from the trenches were highly anomalous, including from trench 004-5.0m @ 1.20 g/t Au and 55 g/t Ag

These values are proportionally similar to the original trenching results from the Cap Oeste Resource area which is only 1,100 metres to the south west.

A drilling campaign, consisting of 9 Reverse Circulation (RC) drill holes for 780 metres, has been completed on Don Pancho. Results are pending.

La Puma prospect was also trenched after mapping and sampling identified a 3 kilometre structure containing mineralized outcrop. Sawn channels on these outcrops returned sample values of up to 9.32 g/t Au and 104 g/t Ag.

A drilling campaign, consisting of 6 RC drill holes for 516 metres, has been completed at Puma. Results are pending.

Vetas Norte prospect is 1,500 metres along strike from La Puma and contains an extensive area of epithermal quartz blocks which have returned up to 1.85 g/t Au and 28 g/t Ag. Sawn channels over the limited outcropping epithermal vein material returned 2.1m @ 0.68 g/t Au. This is significant because of the textural evidence indicating mineralization at depth. An exploration drill hole below this channel sample intersected 10 metre zone of altered siliceous quartz-pyrite vein material, a step back intersected multiple zones over 5 metre of quartz - sulphide material. Results are pending.

Drilling is continuing at Vetas Norte with a further 6 RC drill holes planned for a total of 765 metres.

Pampa prospect. The Cap Oeste trend has a strike of 320º whereas the deflected Don Pancho trend has a strike of 290º. The zone where these two trends intersect, some 2 kilometres along strike to the north west of the current Resource area of Cap Oeste is marked by a significant geophysical and vegetation anomaly. This zone is named Pampa, as it is a flat colluvium covered area and does not contain any outcrop.

The Pampa prospect is considered a prime drill target. Initial exploration drilling on the southern section of this intersection zone, has retuned highly anomalous path finder elements as well as elevated gold values.

A diamond drill exploration programme, 12 holes for 1,440 metres, is planned to commence in late April.

Smaller exploration drilling campaigns will be carried out on the Felix prospect located along trend to the south-west of La Puma, 4 RC drill holes for 330 metres, and on Cose prospect located along trend to the south-west of Cap-Oeste project, 2 RC drill holes for 280 metres.

The above exploration drilling campaigns are scheduled to be completed by mid May. Results will be released as they come to hand.

Marc Sale, (BSC. Geology, Fellow AusIMM, member AIG) a Director and consultant to Patagonia Gold Plc and a qualified person as defined in National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this press release.

ENDS

For more information, please contact: 

Bill Humphries/Richard Prickett 

Patagonia Gold Plc

Tel: +44(0)20 7409 7444

Simon Raggett / Angela Peace

Strand Partners Ltd

Tel: +44(0)20 7409 3494

David Bick / Mark Longson

Square 1 Consulting

Tel : +44(0)20 7929 5599

Alastair Stratton / Tim Graham

Matrix Corporate Capital LLP

Tel : +44(0)20 3206 7204 / +44(0)20 3206 7206

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLFLWSUSEDL
Date   Source Headline
4th Mar 201010:00 amRNSDrilling Report
11th Jan 20103:54 pmRNSExercise of Options
10th Dec 20094:03 pmRNSExercise of Options
1st Dec 20097:00 amRNSDrilling Results
30th Nov 20097:00 amRNSSanta Cruz Legislation Update
10th Nov 20097:00 amRNSDrilling Report
15th Oct 20092:40 pmRNSChange of Name of Nominated Adviser
8th Oct 20097:00 amRNSUpdated Resource Estimate
18th Sep 20097:00 amRNSHalf Yearly Report
24th Jul 20094:05 pmRNSHoldings in Company
24th Jun 200911:03 amRNSGrant of options
23rd Jun 20097:00 amRNSDrilling Report
9th Jun 20094:29 pmRNSResult of AGM
9th Jun 20097:00 amRNSDrilling Report
11th May 20097:00 amRNSDrilling Update
28th Apr 20097:00 amRNSFinal Results
8th Apr 20097:00 amRNSProgress Report
12th Mar 200912:47 pmRNSHolding(s) in Company
4th Mar 200910:51 amRNSPlacing and Subscription
23rd Feb 20097:00 amRNSDrilling Report
4th Feb 20097:00 amRNSPROGRESS REPORT
20th Jan 200910:07 amRNSRe-pricing of Options
13th Jan 20097:00 amRNSDrilling Report
3rd Dec 20087:00 amRNSDrilling Update
20th Nov 20088:21 amRNSLOMADA-SCOPING STUDY RESULTS - REPLACEMENT
20th Nov 20087:00 amRNSLOMADA-SCOPING STUDY RESULTS
4th Nov 20081:02 pmRNSResult of GM
4th Nov 20087:00 amRNSRESOURCE STATEMENT
22nd Oct 20082:32 pmRNSPlacing
30th Sep 200812:56 pmRNSNotice of General Meeting
29th Sep 20087:00 amRNSInterim Results
1st Aug 20082:08 pmRNSHolding(s) in Company
15th Jul 200811:07 amRNSPlacing
18th Jun 20083:35 pmRNSPosting of Annual Report & Ac
4th Jun 20089:42 amRNSGrant of options
3rd Jun 20084:08 pmRNSResult of AGM
3rd Jun 20087:00 amRNSDrilling Report
9th May 20087:00 amRNSLetter of Intent
1st May 20087:01 amRNSFinal Results
23rd Apr 20087:00 amRNSDrilling Update
18th Mar 20087:00 amRNSDrilling Report
4th Feb 20087:00 amRNSAdditional Listing
28th Jan 20087:00 amRNSDrilling Update
9th Jan 200810:02 amRNSPlacing
26th Nov 20077:00 amRNSDrilling Update
30th Oct 20077:01 amRNSAppointment of Broker
4th Oct 20077:00 amRNSResource Statement
27th Sep 20077:01 amRNSInterim Results
16th Aug 20073:49 pmRNSWebsite Information
6th Aug 20075:12 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.