Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algerian Drilling Update AT-2

7 Dec 2009 07:00

RNS Number : 6524D
Petroceltic International PLC
07 December 2009
 



Petroceltic International plc

Well AT-2 successfully flows 4.9 mmscf/d gas from Ordovician 

AT-2 also finds gas in Devonian

Gas column in excess of 80 metres encountered in Well AT-3

Petroceltic International plc ("Petroceltic" or "the Company"), the upstream oil and gas exploration and production company focused on North Africa and the Mediterranean, in association with its partner Sonatrach, the Algerian National Oil & Gas Company is pleased to announce that:

The well test on well AT-2, on the Ain Tsila Field, Isarene permit (Blocks 228 & 229a), Algeria, following fracture stimulation ("fracturing") has resulted in gas flow rates in line with expectations, of 4.9  mmscf/d*. A discovery declaration has been filed with Sonatrach for this well.

Well AT-2 gas pressures indicate that this well is in the same pressure regime as the gas in AT-1 and that AT-2 therefore represents a successful delineation well to the AT-1 gas condensate discovery. It is probable that the Ain Tsila gas condensate discovery therefore extends at least 12km south from AT-1 to the AT-2 location.

AT-2 also logged 4m of gas bearing sandstone in the Devonian F2 horizon. The Company plans to test this shallower gas-bearing interval, using a workover rig, at a later date.

Drilling on the AT-3 well, 9km to the south of AT-2 has now been completed. The well logged a gas column in the Ordovician reservoir in excess of 80 metres. With testing of the AT-2 well completed, the Company plans to test the AT-3 well.

The rig will now move to drill the INW-2 well in the north west of the block, on the Issaouane NW prospect. This well will target both Devonian and Ordovician reservoir objectives.

The post fracture gas flow rates from the AT-2 well are summarised below at the following Flowing Well Head Pressures ("FWHP").

  

Choke Post Fracture Stimulation

setting Gas rate FWHP

64ths" MMscf/d* PSIG**

64 4.9 332

32 4.8 885

*MMscf/d: Million Standard Cubic Feet per Day of gas 

**PSIG: Pounds per Square Inch Gauge

Testing and sampling operations at the AT-2 well have now been completed and the well testing crew is now moving to flow test well AT-3. Well AT-2 has been completed for possible future use as a production well.

The AT-2 well is the third well in the current drilling programme on the Isarene permit in the Illizi basin, Algeria, and the fourth well to successfully test gas at potentially commercial rates drilled by Petroceltic since the block was awarded. This successful well test demonstrates the existence of Ordovician gas reservoirs over 12 km from the AT-1 location to the AT-2 location. 

Gas flow rates at AT-2 are predominantly from the relatively low porosity and permeability matrix sandstone at this location. The fracture stimulation at AT-2 does not appear to have communicated with any natural open fractures at this location. The large volume of information gathered from the well evaluation programme and the subsequent fracture stimulation will be important in optimising any future development of the Ain Tsila discovery. The AT-2 well was drilled by Petroceltic (75% interest, Operator) in association with the Algerian Oil & Gas Company Sonatrach (25% Interest).

Brian O'Cathain, Chief Executive of Petroceltic, commented: 

"Well AT-2 has successfully demonstrated that the Ain Tsila structure contains a large volume of gas in place, with pressure continuity demonstrated from AT-1 to AT-2. It also demonstrated that the lower quality Ordovician sandstone encountered at AT-2, with porosities in the range of 5-10% are capable of flowing gas at commercial rates, even in vertical wells. We are now working to integrate well and seismic data, with a view to optimising future development locations on areas of open fractures and / or higher permeability rock. We are pleased to have successfully logged over 80m of Ordovician gas reservoir at AT-3, and look forward to testing that well in the near future. The drilling rig is now moving to drill the Issaouane NW prospect, in the North West part of this prolific block."

Ends

For further information, please contact:

Petroceltic

Brian O'Cathain Chief Executive Tel: + 353 86 820 7250

Alan McGettigan Finance Director Tel: +353 (1) 421 8300

Pelham PR

Philip Dennis Tel: +44 20 7337 1516 

Klara Kaczmarek Tel: +44 20 7337 1524

Murray Consultants

Joe Murray Tel: +353 (1) 4980300

Davy

Hugh McCutcheon Tel: +353 1 6796363

John Frain

Fabrice Toussaint, Head of Petroleum Engineering, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Mr. Toussaint holds a Diploma in Engineering from the Ecole Nationale Supérieure de l'Aéronautique et de l'Espace, Toulouse, and has over 17 years experience in oil & gas exploration and production. He is a member of the Society of Petroleum Engineers.

Notes to Editors:

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on the Mediterranean and North African area, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's IEX Market. The Company has exploration and appraisal assets in Algeria, Tunisia and Italy.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLBIBDDDXGGGCL
Date   Source Headline
13th Nov 20154:35 pmRNSPrice Monitoring Extension
3rd Nov 20154:40 pmRNSSecond Price Monitoring Extn
3rd Nov 20154:35 pmRNSPrice Monitoring Extension
30th Sep 20157:00 amRNSInterim Report and Operational Update
28th Sep 201512:45 pmRNSGrant of EGM Injunction
22nd Sep 201512:39 pmRNSHolding(s) in Company
18th Sep 20157:00 amRNSResponse to Worldview Letter
16th Sep 20156:01 pmRNSIssue of Legal Proceedings Against Worldview
11th Sep 201512:00 pmRNSFurther Response to Worldview Announcement
7th Sep 20155:30 pmRNSResults of EGMs
7th Sep 20151:30 pmRNSResponse to Worldview Announcement
25th Aug 20157:00 amRNSAppointment of Non Executive Director
20th Aug 20155:29 pmRNSAnonymous Blogsite - Court Update
20th Aug 20154:40 pmRNSSecond Price Monitoring Extn
20th Aug 20154:35 pmRNSPrice Monitoring Extension
20th Aug 20151:23 pmRNSAnonymous Blogsite
19th Aug 20157:00 amRNSAin Tsila Update
13th Aug 20154:40 pmRNSSecond Price Monitoring Extn
13th Aug 20154:35 pmRNSPrice Monitoring Extension
13th Aug 20154:15 pmRNSNotice of EGM and Publication of Circular
4th Aug 20154:15 pmRNSNotice of EGM and Publication of Circular
3rd Aug 20157:00 amRNSUpdate on Contemplated Bond Issue
24th Jul 20155:30 pmRNSResult of AGM
24th Jul 20154:40 pmRNSSecond Price Monitoring Extn
24th Jul 20154:35 pmRNSPrice Monitoring Extension
24th Jul 20151:00 pmRNSRequest for EGM & Legal Proceedings from Worldview
24th Jul 201510:00 amRNSOperational Update
20th Jul 201512:09 pmRNSResponse to Worldview EGM proposals
16th Jul 20157:00 amRNSRequest for EGM from Worldview
8th Jul 20155:29 pmRNSHolding(s) in Company
3rd Jul 20157:00 amRNSResponse to Worldview Announcement
29th Jun 20151:15 pmRNSAnnual Report and Notice of AGM
29th Jun 20151:15 pmRNSNotice of Annual General Meeting
29th Jun 20157:01 amRNSPreliminary Results
29th Jun 20157:00 amRNSContemplated Bond Issue
26th Jun 20151:37 pmRNSHolding(s) in Company
16th Jun 20157:00 amRNSRomania Licence Update
27th Apr 20157:00 amRNSAward of Rig Contract
25th Mar 20157:00 amRNSKurdistan Operations Update
23rd Mar 20157:00 amRNSBoard & Senior Management Changes
2nd Mar 20157:00 amRNSDirectorate Change
26th Feb 20154:15 pmRNSDirectorate Change
25th Feb 20153:15 pmRNSResult of EGM
19th Feb 201511:30 amRNSResponse to Worldview Announcement
18th Feb 201510:00 amRNSShareholder Letter
17th Feb 20157:00 amRNSGovernance Groups Support Petroceltic Board
13th Feb 20155:30 pmRNSHolding(s) in Company
11th Feb 20157:00 amRNSResponse to Worldview Circular
28th Jan 20157:00 amRNSEGM Requisition and Publication of Circular
28th Jan 20157:00 amRNSCapital Markets Day

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.