Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algeria Operational Update

10 Oct 2011 07:00

RNS Number : 8397P
Petroceltic International PLC
10 October 2011
 



 

Petroceltic International plc

Algeria Operational Update

AT-8 Produces flow rate of 38.6 mmscf/d

Condensate production of over 1,100 barrels per day

 

Petroceltic International plc ("Petroceltic" or "the Company"),announces that fracture stimulation of the AT-8 well on the Ain Tsila discovery in Algeria has further enhanced the substantial pre-facture flow rates announced earlier this month to 38.6 mmscf/d. In addition the well has produced over 1,100 barrels per day of condensate. These results exceed the previous best test results achieved at AT-1 and further confirm the high deliverability achievable in this field.

 

Following the pre-fracture stimulation results announced on 3rd October 2011, the upper Ordovician interval of the AT-8 well was successfully fracture stimulated. The well has subsequently produced 38.6 mmscf/d with 1,181 barrels per day of condensate on a 96/64" choke and with a flowing well head pressure of 1,393 PSIG. Pre-fracture gas flow rates at AT-8 were 15.4 mmscf/d.

 

Testing of the upper interval will continue at other choke settings to gather additional reservoir performance and fluid data before down-hole pressure gauges are installed and the well suspended. The gauges will be left in the well for one month to record an extended pressure build-up survey, and will be recovered after the testing of the AT-7 well which is next in the rigless testing programme.

The AT-8 well was designed to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the Ain Tsila field. The well, which is the first well to be drilled with the KCA Deutag Rig T-211, is located 5km north east of AT-1 and 4.5km north west of the AT-5 well in an undrilled section of the field.

 

Petroceltic is an upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, The Company operates the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted that fracture stimulation has substantially enhanced the excellent flow results at AT-8. This flow rate has been constrained by testing facilities and we estimate that a potential rate in excess of 50 mmscf/d of gas is possible from this well in the production phase. These results exceed the very high flow rates reached in the 2009 AT-1 well tests and further confirm that high deliverability is achievable in this field. The gas flow rates achieved here will have a significant impact on the Field Development Plan which we plan to submit to the Algerian competent authorities by the end of January 2012.

 

Our appraisal programme is continuing at a rapid pace with AT-7 well test results and the AT-9 well logging and testing scheduled before year end."

 

Ends

For further information, please contact:

 

Brian O’ Cathain / Tom Hickey, Petroceltic International
Tel: +353 (1) 421 8300
Philip Dennis/Rollo Crichton-Stuart, Pelham Bell Pottinger
Tel: +44 (20) 7861 3919
Joe Murray / Joe Heron, Murray Consultants
Tel: +353 (1) 4980300
Hugh McCutcheon / John Frain, Davy
Tel: +353 (1) 679 6363
 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet of gas per day

PSIG: Pounds per square inch (gauge)

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa, the Middle East and the Mediterranean, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURFSIESUFFSELS
Date   Source Headline
1st Feb 201611:42 amRNSISE Only - Petroceltic Intnl
29th Jan 20165:26 pmRNSSenior Bank Facility Update
29th Jan 20164:41 pmRNSSecond Price Monitoring Extn
29th Jan 20164:35 pmRNSPrice Monitoring Extension
29th Jan 201611:24 amRNSISE Only - Petroceltic Intnl
28th Jan 201611:42 amRNSISE Only - Petroceltic Intnl
27th Jan 20163:13 pmRNSForm 8.3 - Petroceltic plc
27th Jan 201611:47 amRNSISE Only - Petroceltic Intnl
26th Jan 20164:40 pmRNSSecond Price Monitoring Extn
26th Jan 20164:35 pmRNSPrice Monitoring Extension
26th Jan 201611:31 amRNSISE Only - Petroceltic Intnl
25th Jan 201610:59 amRNSISE Only - Petroceltic Intnl 38.5 BAML
22nd Jan 201611:31 amRNSISE Only - Petroceltic 38.5 A
22nd Jan 201610:00 amRNSStatement regarding a possible offer
21st Jan 201611:09 amRNSISE Only - Petroceltic 38.5 A
20th Jan 20164:40 pmRNSSecond Price Monitoring Extn
20th Jan 20164:35 pmRNSPrice Monitoring Extension
20th Jan 201611:18 amRNSISE Only - Petroceltic 38.5 A
19th Jan 201610:15 amRNSISE Only - Petroceltic 38.5 A
18th Jan 20164:40 pmRNSSecond Price Monitoring Extn
18th Jan 20164:35 pmRNSPrice Monitoring Extension
18th Jan 201612:20 pmRNSISE Only - Form 38.5
18th Jan 20167:00 amRNSSenior Bank Facility Update
15th Jan 201611:18 amRNSISE Only - 38.5 A Petroceltic
14th Jan 201611:32 amRNSISE Only - 38.5 A Petroceltic
13th Jan 201612:08 pmRNSISE Only - 38.5 A Petroceltic
12th Jan 20165:05 pmRNSISE Only - Petroceltic INTL 38.5 A
12th Jan 201611:57 amRNSISE Only - Petroceltic Intl PLC 38.5 A BAML
12th Jan 20167:00 amRNSISE Only - 38.5 Petroceltic - Amendment
11th Jan 201611:16 amRNSISE Only - Petroceltic International PLC 38.5 A
8th Jan 20163:08 pmRNSForm 8.3 - Petroceltic International PLC
8th Jan 201611:31 amRNSISE Only - 38.5 Petroceltic
8th Jan 20169:48 amRNSForm 38.5a Petroceltic International Plc
7th Jan 201611:50 amRNSISE Only - 38.5 Petroceltic
7th Jan 20169:26 amRNSForm 38.5a Petroceltic International Plc
6th Jan 201611:24 amRNSISE Only - Petroceltic International PLC 38.5 A
6th Jan 201610:49 amRNSForm 38.5 Petroceltic International Plc
5th Jan 201612:21 pmRNSISE Only - Petroceltic International
31st Dec 201511:04 amRNSISE Only - Petroceltic
30th Dec 201511:52 amRNSISE Only - 38.5 Petroceltic
29th Dec 201510:07 amRNSISE Only - 38.5 Petroceltic
24th Dec 201512:40 pmRNSSecond Price Monitoring Extn
24th Dec 201512:35 pmRNSPrice Monitoring Extension
23rd Dec 20155:24 pmRNSOperational / Financing Update & Strategic Review
16th Dec 20154:35 pmRNSPrice Monitoring Extension
15th Dec 20154:40 pmRNSSecond Price Monitoring Extn
15th Dec 20154:35 pmRNSPrice Monitoring Extension
16th Nov 20154:40 pmRNSSecond Price Monitoring Extn
16th Nov 20154:35 pmRNSPrice Monitoring Extension
13th Nov 20154:40 pmRNSSecond Price Monitoring Extn

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.