Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPCI.L Regulatory News (PCI)

  • There is currently no data for PCI

Algeria Operational Update

10 Oct 2011 07:00

RNS Number : 8397P
Petroceltic International PLC
10 October 2011
 



 

Petroceltic International plc

Algeria Operational Update

AT-8 Produces flow rate of 38.6 mmscf/d

Condensate production of over 1,100 barrels per day

 

Petroceltic International plc ("Petroceltic" or "the Company"),announces that fracture stimulation of the AT-8 well on the Ain Tsila discovery in Algeria has further enhanced the substantial pre-facture flow rates announced earlier this month to 38.6 mmscf/d. In addition the well has produced over 1,100 barrels per day of condensate. These results exceed the previous best test results achieved at AT-1 and further confirm the high deliverability achievable in this field.

 

Following the pre-fracture stimulation results announced on 3rd October 2011, the upper Ordovician interval of the AT-8 well was successfully fracture stimulated. The well has subsequently produced 38.6 mmscf/d with 1,181 barrels per day of condensate on a 96/64" choke and with a flowing well head pressure of 1,393 PSIG. Pre-fracture gas flow rates at AT-8 were 15.4 mmscf/d.

 

Testing of the upper interval will continue at other choke settings to gather additional reservoir performance and fluid data before down-hole pressure gauges are installed and the well suspended. The gauges will be left in the well for one month to record an extended pressure build-up survey, and will be recovered after the testing of the AT-7 well which is next in the rigless testing programme.

The AT-8 well was designed to appraise a pop-up feature with a mapped fault system and to test the extent of the hydrocarbon column in the north of the Ain Tsila field. The well, which is the first well to be drilled with the KCA Deutag Rig T-211, is located 5km north east of AT-1 and 4.5km north west of the AT-5 well in an undrilled section of the field.

 

Petroceltic is an upstream oil and gas exploration and production company focused on North Africa, the Middle East and the Mediterranean, The Company operates the Ain Tsila field on its Isarene permit (Blocks 228 & 229a) in south eastern Algeria. Petroceltic operates the permit with a 56.625% interest, Sonatrach holds a 25% interest, and Enel holds an 18.375% interest, pending final Government of Algeria ratification.

 

Brian O'Cathain, Chief Executive of Petroceltic commented:

 

"We are delighted that fracture stimulation has substantially enhanced the excellent flow results at AT-8. This flow rate has been constrained by testing facilities and we estimate that a potential rate in excess of 50 mmscf/d of gas is possible from this well in the production phase. These results exceed the very high flow rates reached in the 2009 AT-1 well tests and further confirm that high deliverability is achievable in this field. The gas flow rates achieved here will have a significant impact on the Field Development Plan which we plan to submit to the Algerian competent authorities by the end of January 2012.

 

Our appraisal programme is continuing at a rapid pace with AT-7 well test results and the AT-9 well logging and testing scheduled before year end."

 

Ends

For further information, please contact:

 

Brian O’ Cathain / Tom Hickey, Petroceltic International
Tel: +353 (1) 421 8300
Philip Dennis/Rollo Crichton-Stuart, Pelham Bell Pottinger
Tel: +44 (20) 7861 3919
Joe Murray / Joe Heron, Murray Consultants
Tel: +353 (1) 4980300
Hugh McCutcheon / John Frain, Davy
Tel: +353 (1) 679 6363
 

Dr. Dermot Corcoran, Head of Exploration, Petroceltic International plc, is the qualified person who has reviewed and approved the technical information contained in this announcement. Dr. Corcoran has a B.Sc in Geology, a M.Sc. in Geophysics, and a Masters degree in Business Administration, all from the National University of Ireland, Galway. He also holds a Ph.D in Geology from Trinity College, Dublin. Dr. Corcoran has over 20 years experience in oil & gas exploration and production, and has previously worked at ExxonMobil, the Petrofina Group, and Statoil.

 

Glossary

 

 

Bpd: Barrels per day

Choke setting 64"s: The choke setting in diameter, measured in 64ths of one imperial inch.

MMscf/d: Million standard cubic feet of gas per day

PSIG: Pounds per square inch (gauge)

 

 

Notes to Editors:

 

Petroceltic International plc is a leading Upstream Oil and Gas Exploration and Production Company, focused on North Africa, the Middle East and the Mediterranean, and listed on the London Stock Exchange's AIM Market and the Irish Stock Exchange's ESM Market. The Company has exploration and appraisal assets in Algeria, the Kurdistan Region of Iraq and Italy.

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
FURFSIESUFFSELS
Date   Source Headline
16th Jun 20144:10 pmRNSFurther Adjournment of EGM
16th Jun 20149:45 amRNSEquity Placing and EGM Update
9th Jun 20142:56 pmRNSEGM Adjournment
6th Jun 20145:44 pmRNSAdjournment of EGM
30th May 20145:08 pmRNSHolding(s) in Company
30th May 20147:00 amRNSNotice of AGM
30th May 20147:00 amRNSResponse to Worldview Announcements
30th May 20147:00 amRNSOperations Update
30th May 20147:00 amRNS2013 Annual Financial Report & Notice of AGM
29th May 20145:01 pmRNSHolding(s) in Company
27th May 20142:52 pmRNSWorldview Announcements
27th May 20147:00 amRNSHolding(s) in Company
22nd May 20142:57 pmRNSHolding(s) in Company
21st May 20147:00 amRNSEnterprise Securities Market Notice
20th May 20142:22 pmRNSHolding(s) in Company
16th May 20145:00 pmRNSPosting of Circular
16th May 201410:12 amRNSResult of Placing
16th May 20147:00 amRNSPlacing
16th May 20147:00 amRNSPreliminary Results
9th May 20144:23 pmRNSHolding(s) in Company
8th May 20147:00 amRNSOperations Update
10th Apr 201410:43 amRNSHolding(s) in Company
8th Apr 201411:13 amRNSHolding(s) in Company
7th Apr 201412:39 pmRNSKurdistan Operational Update
2nd Apr 201411:22 amRNSHolding(s) in Company
18th Mar 20145:36 pmRNSHolding(s) in Company
18th Mar 20142:35 pmRNSHolding(s) in Company
28th Feb 201410:26 amRNSHolding(s) in Company
13th Feb 20147:00 amRNSAlgeria Farmout Update
14th Jan 20147:00 amRNSEnterprise Securities Market Notice
8th Jan 20142:59 pmRNSIssue of Equity
7th Jan 20147:00 amRNSOperational Update and Guidance
13th Dec 20137:00 amRNSRomanian Exploration Drilling
14th Nov 20137:00 amRNSRomanian Drilling Update
9th Oct 201312:28 pmRNSHolding(s) in Company
7th Oct 20137:00 amRNSAlgeria Farmout Process Update
16th Sep 20132:50 pmRNSDirector/PDMR Shareholding
16th Sep 20137:00 amRNSAppointment of Non-Executive Director
16th Sep 20137:00 amRNSBulgarian Operational Update
9th Sep 20137:00 amRNSInterim Results and Operational Update
2nd Sep 20137:00 amRNSKurdistan and Romania Drilling Campaigns Commence
15th Aug 20134:35 pmRNSPrice Monitoring Extension
9th Aug 20135:36 pmRNSHolding(s) in Company
2nd Aug 20134:34 pmRNSEnel Receivable Determination
12th Jul 20137:00 amRNSAward of New Greek Licence
5th Jul 20137:00 amRNSIssue of Legal Proceedings
3rd Jul 20137:29 amRNSItalian Operational Update
12th Jun 20134:02 pmRNSHolding(s) in Company
7th Jun 20137:00 amRNSBoard Change
30th May 20133:10 pmRNSResults of AGM and Withdrawal from Scheme

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.