If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPantheon Resources plc Regulatory News (PANR)

Share Price Information for Pantheon Resources plc (PANR)

Share Price is delayed by 15 minutes
Get Live Data
14.14    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 1.17 (8.478%)
Market Cap: £206.15m
PANR Live PriceLast checked at - London Stock Exchange

Intraday Pantheon Resources plc Share Chart

Operational update, Talitha #A well

2 Mar 2021 07:00

RNS Number : 7775Q
Pantheon Resources PLC
02 March 2021
 

02 March, 2021

 

Pantheon Resources plc

Operational update, Talitha #A well

 

Pantheon Resources plc ("Pantheon" or "the Company"), the AIM-quoted oil and gas exploration company with a 100%(1) working interests in projects covering 160,000 acres, all covered by 3D seismic and conveniently located adjacent to transportation and pipeline infrastructure on the Alaska North Slope, provides the following update:

 

Talitha #A well

As previously announced, the Talitha #A well reached target depth at 10,452 ft; was logged, sidewall cored, and encountered oil in all four targeted horizons. Preliminary analysis for all of these zones at this location was very encouraging, particularly for the Shelf Margin Deltaic ("SMD"), Basin Floor Fan and Kuparuk horizons. Flow testing each of these zones sequentially from deepest to shallowest, prior to the end of the drilling season is the goal.

 

The highly encouraging results in the Kuparuk formation, which were better than expected, have warranted a change of plans to test the Kuparuk more thoroughly. Necessarily, this has added additional complexity and time to testing of this formation and has resulted in a delay to the planned testing timetable. The Kuparuk formation is an important target on the Alaska North Slope because of its large scale and enormous regional productive capability. In order to carry out a more detailed testing operation it was decided to set a 4 ½ inch liner across the Kuparuk instead of the original plan to test in the open hole.

 

However, because of equipment failures and technical issues, the formation started to become damaged in its current location and it has not been possible to effectively set the 4 ½ inch liner. The damage occurred to the geologic formations above the Kuparuk, a sequence of thick shales and clays, which swelled while the hole was open during the delay. Accordingly, the Company has made the decision to drill a new modestly angled sidetrack into the Kuparuk. The plan is to set and cement the 4 ½ inch liner within the sidetrack, perforate the Kuparuk and commence testing. It is estimated that the sidetrack will take 2-3 days to drill some 650 feet through the Kuparuk Formation approximately 25-50 feet lateral distance from the discovery location, which should allow a better testing operation.

 

Despite this delay the Company believes there remains sufficient time for testing operations on the other horizons being the SMD and the Basin Floor Fan (in addition to the Kuparuk).

 

(1) The transfer of the 10.8% WI in the Talitha project acquired from Otto Energy remains conditional upon approval by the Alaska Department of Natural Resources.

Jay Cheatham, CEO of Pantheon Resources, said:

"As far as problems go, it's a good problem to have because it was driven by the preliminary data being better than expected at this location and warrants the opportunity to be tested rigorously. The Kuparuk is a major potential resource in Pantheon's acreage in and around this location where the Company has invested in securing key leases. However, the delay caused by adapting the drilling plan may impact our ability to test all zones as effectively as we would like before the end of the drilling season. We hope and believe this won't be the case and intend to make full use of all available time. As always, we caution that testing is critical to establish the commercial viability of the oil that appears present in the Talitha structure; it is essential that we undertake this process thoroughly.

 

"Fortuitously, the the Alaska North Slope is currently experiencing unseasonably cold weather which we estimate may extend the drilling season into early April. We remain extremely excited about the commercial potential of the SMD, Basin Floor Fan and Kuparuk horizons, any one of which could be company makers for us, if successful."

 

-Ends-

 

 

 

Further information:

 

Pantheon Resources plc

+44 20 7484 5361

Jay Cheatham, CEO

 

Justin Hondris, Director, Finance and Corporate Development

 

Canaccord Genuity plc (Nominated Adviser and broker)

 

Henry Fitzgerald-O'Connor, James Asensio, Angelos Vlatakis

+44 20 7523 8000

Blytheweigh

 

Tim Blythe, Megan Ray, Alice Mclaren, Madeleine Gordon-Foxwell

+44 20 7138 3204

 

 

 

In accordance with the AIM Rules - Note for Mining and Oil & Gas Companies - June 2009, the information contained in this announcement has been reviewed and signed off by Jay Cheatham, a qualified Chemical & Petroleum Engineer, who has over 40 years' relevant experience within the sector.

 

Cautionary Statement: The estimated quantities of petroleum that may be potentially recovered by the application of a future development project relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further exploration, appraisal, testing and evaluation are required to determine the existence of a significant quantity of potentially movable hydrocarbons.

 

 

Notes to Editors

Pantheon Resources plc is an AIM listed Oil & Gas exploration and production focused on several large projects located on the North Slope of Alaska ("ANS"), onshore USA. A major differentiator to other ANS projects is its close proximity to transport and pipeline infrastructure. The Group's stated objective is to create material value for its stakeholders through oil exploration, appraisal and development activities in high impact, highly prospective conventional assets in the USA; a highly established region for energy production with infrastructure, skilled personnel and low sovereign risk. All operations are onshore USA, with drilling costs materially below that of offshore wells.

 

On the North Slope of Alaska, Pantheon holds working interests of 100%(1) in projects covered by c.1,000 square miles of proprietary 3D seismic. The Company has received Independent Expert Reports certifying a Contingent Resource of 76.5MMBO (million barrels of oil) recoverable on its Greater Alkaid project and 302MMBO Prospective Resource at its Talitha project.

 

Information contained within this RNS is considered to be inside information prior to its announcement. For further information on Pantheon Resources plc, see the website at: www.pantheonresources.com. The information contained within this RNS is considered to be inside information prior to its release. Neither the contents of the Company's website nor the contents of any website accessible from hyperlinks on the Company's website (or any other website) incorporated into, or forms part of, this announcement.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFFFIIVVILIIL
Date   Source Headline
9th Mar 20204:41 pmRNSSecond Price Monitoring Extn
9th Mar 20204:37 pmRNSPrice Monitoring Extension
27th Feb 20207:30 amRNSRestoration - Pantheon Resources Plc
25th Feb 202011:01 amRNSFinal Results for the Year Ended 30 June 2019
20th Feb 20207:00 amRNSPublication of Annual Results
20th Feb 20207:00 amRNSPublication of Annual Results
30th Jan 20207:00 amRNSNew Project OIP estimate and Company presentation
23rd Jan 20207:00 amRNSResource Update
2nd Jan 20207:30 amRNSSuspension - Pantheon Resources plc
2nd Jan 20207:00 amRNSPublication of Audited Financial Results
12th Dec 20197:07 amRNSAcquisition of key leases in Alaska's North Slope
15th Nov 20194:40 pmRNSSecond Price Monitoring Extn
15th Nov 20194:35 pmRNSPrice Monitoring Extension
6th Nov 20197:01 amRNSCompany Update
17th Oct 20197:00 amRNSAcquisition of Halliburton 25% WI in Alkaid/Phecda
2nd Oct 20197:59 amRNSAppointment of Non-Executive Director
24th Sep 201910:00 amRNSPantheon Resources Alaskan Project Update and Q&A
12th Sep 201912:32 pmRNSInvitation to Alaskan Project Update and Q&A
2nd Sep 20195:25 pmRNSDirector/PDMR Shareholding
14th Aug 201912:11 pmRNSIssue of Equity
9th Aug 20192:45 pmRNSTR-1: Notification of major holdings
5th Aug 20197:00 amRNSOpening of Data Room and Farmout Process
26th Jul 201911:18 amRNSHolding(s) in Company
19th Jul 201912:48 pmRNSResult of Capital Raising
19th Jul 20198:06 amRNSClose of Capital Raising
18th Jul 20194:58 pmRNSProposed Placing and Subscription of US$6.5million
12th Jul 20197:00 amRNSAlaskan Update
25th Jun 20193:25 pmRNSCorporate Presentation June 2019
24th Jun 20197:00 amRNSPartnership with High-Tech Geophysics specialist
6th Jun 20197:00 amRNSResource upgrade - Alkaid prospect
5th Jun 20197:00 amRNSCEO Q&A podcast confirmed
30th May 20197:00 amRNSUpdate on timing of CEO Q&A podcast
20th May 20197:00 amRNSAlaskan update and notification of CEO Q&A podcast
14th May 20194:40 pmRNSSecond Price Monitoring Extn
14th May 20194:35 pmRNSPrice Monitoring Extension
2nd Apr 20197:19 amRNSAlkaid Well Update
28th Mar 20197:00 amRNSInterim Results for the Six Months Ended 31/12/18
25th Mar 20197:54 amRNSAlkaid Well - successful flow test
20th Mar 20197:00 amRNSOperational Update
18th Mar 201910:19 amRNSPassing of John Walmsley, Non-executive Director
13th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
12th Mar 20195:07 pmRNSDirector's interest in shares
11th Mar 20197:00 amRNSAppointment of Technical Director
6th Mar 20197:00 amRNSOperational update: Winx-1 and Alkaid wells
4th Mar 20197:00 amRNSWinx-1 Exploration Well drilling update
1st Mar 20197:45 amRNSWinx-1 Exploration Well drilling update
25th Feb 20197:00 amRNSUpdate on Alkaid Well, Alaska
18th Feb 20197:26 amRNSSpudding of Winx-1 well in Alaska
21st Jan 20194:40 pmRNSHolding(s) in Company
21st Jan 20198:49 amRNSCompletion of the Great Bear Acquisition

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.