Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPanther Metals Regulatory News (PALM)

Share Price Information for Panther Metals (PALM)

Share Price is delayed by 15 minutes
Get Live Data
167.50    13.50 (8.31%)
Bid:
165.00
Ask:
170.00
Spread: 5.00 (3.03%)
Market Cap: £15.42m
PALM Live PriceLast checked at - London Stock Exchange

Intraday Panther Metals Share Chart

Exploration Permit Applications & Work Planning

18 Feb 2020 10:03

RNS Number : 3424D
Panther Metals PLC
18 February 2020
 

NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR INTO AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA, THE UNITED STATES OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH JURISDICTION

FOR IMMEDIATE RELEASE

 

PANTHER METALS PLC

(Incorporated in the Isle of Man with company number 009753V)

18 February 2020

Big Bear Gold Project Exploration Permit Applications & Unmanned Airborne Geophysics Survey Preparation

Panther Metals PLC (LSE:PALM) ("Panther" or "the Company"), the company focused on mineral exploration in Canada and Australia, is pleased to announce that applications for four exploration permits covering the Big Bear Gold Project ("Big Bear" or the "Project") in Canada, have been lodged. In addition, a geophysical contractor has visited the Project in order to plan the logistics for a drone based airborne magnetic geophysics survey of the Project.

Darren Hazelwood, CEO, commented:

"The exploration permitting applications for the Big Bear Gold Project in Ontario, Canada, have been lodged to allow Panther to refine and test prospective gold and base metal targets outlined by both Panther and in historical exploration work. Successful permitting will allow Panther to undertake an inaugural core drilling programme of up to 20 diamond drill holes as well as associated bedrock trenching.

We are also pleased to announce that a geophysical contractor visited site last week in order to plan the logistics for the drone-borne aerial magnetics survey we are scheduling to be flown in early Spring. We look forward to providing further details on this in due course."

Permitting Details

The four exploration permit applications respectively cover the north, south, east and west of the Project and supplement and append the existing exploration permit which is in place for the central part of the Project over the Schreiber Pyramid gold occurrence and gold occurrences in the vicinity of Bear Lake. An Activity Details Report has been filed with each application outlining the following planned work streams:

Work included in the exploration permit applications:

·; Ground induced polarisation ("IP") and resistivity geophysics over selected parts of the Big Bear property.

 

·; Soil geochemical sampling programme over existing areas of interest and wider target structures in the Project area.

 

·; Overburden stripping of areas containing geochemical or geophysical anomalies.

 

·; Bedrock trenching of targets outlined in the north, east and west application areas.

 

·; Diamond core drilling, with provisions for up to 20 holes, with up to 10 holes in the central and western part of the Project and up to 5 holes in each of the north and east permit applications.

 

·; Clearing of forest access trails and line cutting for the various workstreams.

 

·; The permit applications also make provision for tented camp sites associated with the drilling and trenching programmes and the storage of fuel.

The central part of the Project already has an exploration permit in place for the drilling and trenching of seven target areas coinciding with historical gold occurrences and more recent soil and rock chip sampling work.

The exploration permit applications will now go through a process of governmental, First Nation community and local landowner, stakeholder review with a decision due on or before the week commencing 5 April 2020. The planned ground work programmes will coincide with the snow melt and will follow on from a planned drone airborne magnetics survey which is being scheduled for late March.

Following the renewal of a number of existing Panther claims, the conversion of legacy boundary claims to full mining claims, following neighbouring claim holders relinquishing ground, and the registration of mining claims over the extension of prospective ground in the east of the property, the Big Bear Project currently encompasses a total area of 46km2.

Big Bear Gold Project Background

The Big Bear Gold Project covers an area of 46 km2 on the Schreiber-Hemlo Greenstone Belt located within 0.5 km of the town of Schreiber and 170 km southeast of the city of Thunder Bay. The Schreiber-Hemlo greenstone belt includes a number of known gold deposits including the current Barrick Gold's Hemlo Mine which has reportedly produced over 22 million ounces of gold to date from a combination of underground and open pit mining. Although the Hemlo mine is on the same greenstone belt as Big Bear, it cannot reasonably be quoted as an adjacent or neighbouring project on account of its distance and geological difference. It does, however, serve to illustrate a type of deposit that can be found within the greenstone belt that may represent a target for Panther. The Project is also approximately 15 km southeast of the past-producing Winston Lake zinc mine, one of Canada's highest grade zinc deposits.

The Archean rocks of the Schreiber-Hemlo Greenstone Belt are predominantly subaqueous mafic tholeiitic metavolcanic rocks which overlie a less voluminous, predominantly calc-alkaline sequence, both of which are interlayered with minor clastic and chemical metasedimentary rocks. Mineral deposits and occurrences within the belt, comprise precious metal (gold and silver) veins in fractures and shears in the mafic metavolcanic and granitic rocks; molybdenum-copper vein deposits associated with the border zones of the granitic batholiths; nickel-copper deposits associated with a gabbro intrusion; and polymetallic base metal copper-lead-zinc-silver occurrences associated with clastic and chemical interflow metasedimentary units.

 

Panther's work to date has focused on the verification of previous exploration results and historical data research and compilation. In 2018, Panther conducted soil geochemical sampling on five survey grids along with regional prospecting and outcrop sampling. The anomalous geochemical soil results which ranged up to 0.71 g/t Au, show a strong correlation with the Total Field Magnetic airborne geophysics and the interpreted lineaments/structures derived from the digital elevation model. Panther's outcrop sampling has confirmed high grade results, attributed to historical work areas, including a quartz vein sample from the Schreiber Pyramid mine yielding 105.5 g/t gold & 6.61 g/t silver.

 

For further information please contact:

Panther Metals PLC:

Darren Hazelwood, Chief Executive Officer:  +44(0) 1462 429 743 and +44(0) 7971 957 685

Mitchell Smith, Chief Operating Officer: +1(604) 209 6678

Brokers:

SI Capital Limited

Nick Emerson +44(0) 1438 416 500

Peterhouse Capital Limited

Guy Miller and Duncan Vasey +44(0) 20 7469 0930

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
STRKVLBFBLLEBBX
Date   Source Headline
21st Nov 20238:08 amRNSManitou Lakes Drilling Programme Commences
20th Nov 20237:00 amRNSAppointment of Joint Broker and Manitou funding
15th Nov 20237:00 amRNSPanther Australia - Coglia Update
1st Nov 20237:00 amRNSDirectorate Change
30th Oct 20231:09 pmRNSGold Intercepts Show Potential at 40 Mile Camp
23rd Oct 20237:01 amRNSFulcrum Metals: Tully Gold Project
16th Oct 20238:41 amRNSHolding(s) in Company
3rd Oct 202311:05 amRNSFulcrum Metals Charlot-Neely Lake Uranium Project
27th Sep 20237:27 amRNSManitou Lakes: Additional Mining Claims Staked
25th Sep 20237:47 amRNSHalf-year Report
19th Sep 20233:31 pmRNSAppointment of Joint Broker
18th Sep 20237:00 amRNSFulcrum Metals: Drill Planning Update
13th Sep 20237:00 amRNSFulcrum Metals: Schreiber-Hemlo Project Update
11th Sep 20239:36 amRNSHolding(s) in Company
7th Sep 20237:01 amRNSFulcrum Metals: Strong Uranium Targets Identified
7th Sep 20237:00 amRNSInvestor Event
5th Sep 202310:01 amRNSPanther Australia - Nickel Sulphide Project Update
31st Aug 20237:00 amRNSIssue of Debt
7th Aug 20239:59 amRNSFulcrum Metals - Acquisition and Fundraise
1st Aug 202310:21 amRNSAll Drilling Complete in Western Australia
27th Jul 20237:00 amRNSBig Bear - Increase in Targets Defined
27th Jun 20237:00 amRNSDotted Lake Drill Permit
8th Jun 20233:19 pmRNSResult of AGM
18th May 202311:44 amRNSNotice of AGM
16th May 20238:24 amRNSChange of Registered Office
12th May 20237:00 amRNSAdditional Claims Staked at Obonga
11th May 20237:05 amRNSFulcrum Metals - Exploration Update
11th May 20237:00 amRNSPanther Australia - Coglia Drilling Commences
3rd May 20237:00 amRNSManitou Exploration Permit Issued
28th Apr 20237:53 amRNSPanther Australia Rights Issue Closes
27th Apr 20237:00 amRNSFinal Results
17th Apr 20237:00 amRNSFulcrum Metals: Winston Lake Project Expansion
5th Apr 202311:28 amRNSProposed Sale: Blue Mountain Project, Queensland
27th Mar 20232:01 pmRNSPanther Australia PNT Fund Raise
23rd Mar 20237:00 amRNSFulcrum Metals plc - Project Structural Study
22nd Mar 20237:55 amRNSPanther Australia: New Au and Ni targets
20th Mar 20237:00 amRNSTax Refund Received
3rd Mar 20237:00 amRNSNew Corporate Presentation
2nd Mar 20238:20 amRNSFulcrum Metals: Schreiber-Hemlo Gold Assays
1st Mar 20237:00 amRNSTotal Voting Rights
10th Feb 20237:05 amRNSFulcrum Metals PLC Placing, Proposed AIM Admission
8th Feb 20235:50 pmRNSHolding(s) in Company
8th Feb 20232:00 pmRNSHolding(s) in Company
8th Feb 20231:23 pmRNSHolding(s) in Company
8th Feb 202312:09 pmRNSHolding(s) in Company
7th Feb 20237:00 amRNSHolding(s) in Company
2nd Feb 20237:05 amRNSObonga:VMS Camp Discovery; High Grades Intersected
2nd Feb 20237:00 amRNSObonga: Flake Graphite Discovery
30th Jan 20237:00 amRNSPanther Australia: Positive Metallurgical Results
8th Dec 20228:51 amRNSPanther Australia - update re Burtville East

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.